infraredremotecontrolsystem专业英语论文内容摘要:

ds play an important role. The Improved Method Method one In various infrared transceiver products, although the transmission rate, transmission distance and other characteristics, But infrared transceiver products has been towards improving the transmission rate, increase the transmission distance and lower power consumption, expanding launch reception angle of development. In particular, as the technology development and maturity, the means of transmission is moving in the direction of pointtomultipoint. Therefore infrared remote control transceiver products have broader prospects for development. Infrared is actually a kind of electromagic wave. From the analysis of various natural ponent of the electromagic wave reflected spectrum is :ray, xray, ultraviolet, visible, infrared, microwave and radio wave. From the viewpoint of form, and they did not seem to, but if the wavelength in descending order, and we w ill find him all the only visible light spectrum of the entire μm so long little area, and adjacent to the visible light and infrared (including the far infrared, mid infrared and near infrared foreign) accounts for the spectrum of μm 1000μm of a major. Which micron wavelength range also includes UV, visible, near infrared, midinfrared and farinfrared, microwave. From the above analysis shows that infrared is a very rich spectrum resources, it currently has in production, life, military, medical, and other aspects have been widely used, such as infrared heating, medical infrared, infrared munication, infrared camera, infrared remote control, and so on. Infrared remote control is the many applications of infrared part of the current household appliances widely used in TV remote control, VCR remote control, VCD remote control, highfidelity audio remote control, are used infrared remote control, It allows the control of these appliances have bee very easy. Method two Infrared lies between visible light and microwave a wave, it is with certain clinical characteristics of the wave. In the nearinfrared, visible light and its adjacent, it is visible in certain characteristics, such as straightline transmission, reflection, refraction, scattering, diffraction, can be certain objects and can be absorbed through the lens of their focusing. In the farinfrared region, owing to its neighboring microwave, it has some characteristics of microwave, If a strong perating power and can run through some opaque substances. Since in any object, natural profession, regardless of whether its own luminescence (referring to vis。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。