金属腐蚀与防护英文专题内容摘要:
rflow and light of the different corrosion rate can be / a varied between. But the majority of cases, / a. Corrosion in aqueous solution was more plex than the atmosphere, most acid, alkali, salt water solution are highly corrosive to carbon steel. Only the strong oxidation of concentrated sulfuric acid, dilute acetic acid, sulfur, saltpeter mixed acid, alkaline hydroxides, alkaline cyanide, alkaline sulfide, as well as nitrate, carbonate, chromate, acetate and ammonia solution and so on, may use the carbon steel at room temperature. In addition, anic solvents such as hydrocarbons, alcohols, amines, aldehydes and ketones, can also be used to make carbon steel containers. Tap water, river water, sea water, distilled water so the corrosion of carbon steel, and water dissolved oxygen, flow, PH value, temperature, bacteria, etc. is different, they are very different。 the same time, with the steel surface state related. Ⅲ、 lowalloy steel corrosion resistance Corrosion resistance of lowalloy steel is a lowalloy steel is an important branch of the class. Add the main alloying elements to improve the corrosion of steel in different environments in the corrosion resistance. However, for this purpose to add a small amount of multialloy steel is often the same time, the mechanical properties and process performance of the larger impacts, both beneficial side also has a negative side, which to the corrosion of low alloy steel and production increased the difficulties. Corrosion is still a developing lowalloy steel in the steel type, there is no uniform classification. Now more mature and effective corrosion resistance of lowalloy steel are: (1) The atmospheric corrosionresistant lowalloy steel. (2) sulfuric acid dew point corrosion resistant lowalloy steel. (3) seawater corrosionresistant lowalloy steel. (4) milk sulfide corrosion of lowalloy steel. (5) Other corrosion resistant lowalloy steel. In other corrosion resistant lowalloy steel, there are hightemperature, high pressure, hydrogen, nitrogen, and corrosionresistant lowalloy steel, etc. bittern. China39。 s highstrength lowalloy steel with the corrosion of lowalloy steel has been around 30 years of history, and achieved considerable results. (A) Atmospheric corrosionresistant lowalloy steel Without the protection of ordinary carbon steel under the conditions of exposure to the atmosphere, the corrosion, the corrosion rate and the relationship between environmental factors greatly. Atmospheric corrosion is usually a typical environment, there are three types: the rural atmosphere, industrial atmosphere and ocean atmosphere. Among them, rural countryside of atmospheric corrosion of mild steel。 and industrial air vary widely, affecting different。 Oceanic and Atmospheric corrosion of steel is the biggest. Air pollution in rural areas due to a lesser extent, affecting a major factor in corrosion of steel is precipitation, annual mean temperature and relative humidity. Corrosion of steel in the atmosphere is due to the surface of steel is conducive to the formation of the wet film electrochemical reaction, resulting in corrosion to proceed. Industrial atmosphere of the steel corrosion rate of the influencing factors, primarily in the pollution of the atmosphere position and content, such as sulfur dioxide. In the atmosphere is also inevitably contain moisture, which greatly increased the corrosion of steel. Steel corrosion in the marine atmosphere is much more serious than the former two kinds of environments, mainly because of the oceanatmosphere contains a large number of chloride particles, such as the sea fog particles falling in the steel surface, forming a layer of electrolyte of the wet film . Just in the marine atmospheric corrosion by the high plane distance is the proximity and the coastline, wind speed, wind direction and other factors. Nightside is usually steel surface corrosion than steel Yang greater degree, because rain can put a positive salt washed out. In order to prevent atmospheric corrosion of steel, usually paint or metal plating, so that the steel surface and moist air separation, but this surface treatment is not once and for all. The past 2030 years, the world39。 s countries are trying to add a variety of small amount of the steel alloying elements to enhance the atmospheric corrosion resistant steel their ability to develop a group of lowalloy steel resistant to atmospheric corrosion. Corrosion of carbon steel in the atmosphere originally developed rapidly, when the rust layer formed, the average corrosion rate will be slowed. Because of this rust porous layer and its adhesion is poor, coverage is not uniform, unable to withstand wind and rain and the role of alternating wet and dry at any time by peeling off, so that corrosion, localized corrosion, especially the further development . Lowalloy steel corrosion in the atmosphere, mainly to improve the structure of the rust layer and improve the extent of the rust layer and the dense steel adhesion, enhanced the role of newly isolated with the air. Over the past decade, the United States ambassador to the successful development of rust color with an artistic lowalloy steel, not paint directly exposed to the use of a building with a beautiful tan. alloy elements on corrosion resistance of steels in the impact of atmospheric Atmospheric corrosionresistant lowalloy steel, the effective alloying elements are mainly copper, phosphorus, chromium, nickel, etc., these elements are enriched in the surface of steel and formed amorphous layer increases in the atmospheric environment in the steel corrosion resistance. Cu: Copper atmospheric corrosion resistant steel has an obvious effect of a large number of domestic and international experimental study and confirmed。金属腐蚀与防护英文专题
相关推荐
: )1( S S stat 式中: η -静力试验荷载效率系数; Sstat-试验荷载作用下,控制截面内力计算值; S- 设计标准活荷载作用下,控制截面内力计算值(不计冲击作用时); μ - 设计取用的冲击系数。 加载车辆横向位置按照 《公路桥涵设计通用规范》( JTJ02189) 的有关规定进行布置,车辆纵向位置需根据荷载等效的 要求 结合计算分析确定。 加载汽车轴重、轴距
接收调度分配实验任务, 试验人员核对委托与样品无误后, 应及时借阅有关资料和试验方法有关标准文件,理解后统筹安排实验进度。 ⑵实验室试验人员 应严格按照本专业质量控制程序文件和本室仪器设备操作规程进行检测工作。 对所需进行试验的产品 采用国家标准、行业标准或顾客指定的标准 进行试验作业。 ⑶实验室试验人员和相关部门人 员搬运待试验样品时应做到轻拿轻放,避免震动,必要时需借助搬运工具进行搬运
款 984 万元、农户贷款 6824 万元,分别占贷款总额的 12%和 85%。 这些贷款的发放无疑对社会主义新农村的建设起到重要的作用。 二 、村镇银行模式运营的情况 (一) 邻 国村镇银行的贷款 情况 农村小额贷款问题一直以来是世界金融界尤其是发展中国家的一个十分重要的问题,目前亚洲国家在以尤努斯教授创造“乡村银行”小额贷款方式成为众多国家学习的模式。
学腐蚀过程没有。 两种腐蚀均同时发生,但电化学腐蚀普遍,腐蚀速度快。 【板 书】: 2 钢铁的电化学腐蚀 析氢腐蚀:负极: Fe — 2e— = Fe2+ 正极: 2H2O + 2e— = H2↑ + 2OH— 总反应: Fe + 2H2O = Fe( OH) 2 吸氧腐蚀:负极: Fe — 2e— = Fe2+ 正极: 2H2O + O2+ 4e— = 4OH— 总反应: 2Fe + 2H2O
然后用水冲洗。 但是,在这样的清洁时不要施加力以避免,例如意外地清除了腐蚀产物而提高了评定等级。 清洁溶液应当与涂层是可兼容的,并且不会使涂层产生任何变质。 在试验的中间阶段,定期的检验不要清洁或另外干扰样品。 在对样品作检验之前,要使样品的表面干燥。 当评定表面等级时要记录和考虑的缺陷只包括能用正常或校准视力观察到的那些缺陷。 注释 1 在初次检测后,其后可以使用光学工具来鉴别缺陷的特性。