生态型住宅小区规划设计外文文献翻译内容摘要:
by the depletion of critical resources or forced by excessive loads. From the perspective of the planning and design of a modern ecological residential munity, the overall layout of the munity, the bination of individual spaces, the structure of the house, the use of natural energy, energysaving measures, and the design of the greening system are all based on the principle of sustainable development. In terms of specific design, we should pay attention to the level, style, and architecture of the green layout to reflect each other. We must also pay attention to the mutual integration of different plants and play a role in greening the entire munity, such as heat insulation, wind protection, and dust prevention. , antinoise and so on. The construction of the house takes into account the needs of natural ecology and social ecology, focuses on saving energy, and pays attention to the occupants39。 needs for natural space and interpersonal munication. Multilevel structure of spatial structure From the internal space of the house to the external munication space and the expansion of the space of the public pound behavior, and the convergence with the urban society, such layers of promotion will systematically space. From gardens, cloisters, fountains, leisure plazas, residential green spaces to swimming pools, fitness clubs, etc., through a variety of exchange venues to create a freeroaming home model, which will provide a continuation of the interpersonal tradition and the healthy development of selfentertainment Facilities guarantee. Natural Remanufacturing Environment The use of artificial factors to create a temporary natural environment does not substantially embody the concept of ecological munities. It allows the entire munity to have natural reengineering functions, truly “living”, and bringing people39。 s cultural environment into harmony with the natural environment. It is an ecological residential munity. Another point of focus. Therefore, designers often use favorable geographical conditions to introduce water into the park to create a natural recycling area. Planning System Analysis and Design Planning Structure Function Positioning Turn the concept model into a spatial model, and use the munity traffic work and green belts to divide the munity into land use residential areas, public service facilities, mercial areas, and greening leisure areas. The division is clear and the contact is convenient, forming a homebased model with a green leisure area as the core. At the same time, the spatial design of the park includes a multilevel and plete spatial sequence from public to private, as shown in Figure 2. We are looking for the characteristics of the association between the levels and levels and the characteristics of the sense of belonging and participation in the space of buildings and places, so as to avoid the uncertainty and ambiguity of the sense of belonging. The corresponding landscape space nodes are set in the park so as to produce a clear sense of belonging and the recognizability of the site. Pay attention to dealing with the echoes and extensions of various junctions, so as to better plete the guiding role. The collection of space and nodes depend on each other, making the planning structure plete and rigorous. Traffic Organization Emphasize the diversity and equality of traffic anizations. A work of loops is used to partition multiple clear structures of a cell and extend it in a work to various destinations. Minimize the crossover and parallel lengths of motorvehicle flows and pedestrianflow activities in the design munity, and use environmentimposed approaches to multiple speed limits. Special attention should be paid to eliminating the flow of traffic through the munity greening system to ensure the maintenance of the entire pedestrian system. In addition, handicap ramps are also provided in the park to facilitate disabled people. Landscape Space The whole munity is driven by the landscapes of the two sides, and focuses on the anization, analysis and bined vision of the sightlines of the landscape. The landscape axis of the main entrance of the munity intersects with the landscape axis along the river to the central activity square. The link between landscapes and people and the areas and spaces used by people to ensure harmony between functions and landscapes is the focus of our efforts. At the same time, the open landscape space design makes the visual corridors of the interior space of the mun。生态型住宅小区规划设计外文文献翻译
相关推荐
,七块板组成的正方形尺寸为150mm 150mm。 包含 (等腰三角形三种规格为 105mm 105mm 145mm 两个、 75mm 75mm 105mm一个、 50mm50mm 75mm 两个、正方形 55mm 55mm一个、平行四边形 55mm 75mm一个 ) 由一个正方形分割的七块几何图形组成,图形为塑料制作,实心,不易折断。 图形为七种不同颜色。 各板厚度为均
扩大,吸引了越来越多的优秀学生报考我校,使学校的招生形势逐年看好,第一志愿录取率、投档线和投档平均分逐年升高。 2020年以来,我校在江苏省专一批次名列第一,平均分均高于全省本二分数线。 就业渠道畅通: 学院就业基地遍及南京、苏锡常、上海、浙江、福建、广东等地,拥有长期合作单位600 余家。 毕业生就业情况一直较好,就业率始终保持在 98%以上。 2020 届毕业生就业率达到了 %,截止
反平行结构(相邻肽链反向),见 P210图 518。 ( 3) β 转角和 β 凸起 β 转角是球状蛋白的一种简单的二级结构组件。 为第一个氨基酸残基的羰基与第四个残基的 NH 氢键键合,形成一紧密的环在肽链回折或弯曲时形成,使多肽链出现 1800 急剧回折,见 P211 图 519。 β 转角处 Gly 和 Pro 出现几率很高。 β 凸起:是在 β 折迭股中额外插入一个残基
答复。 投标人可以拒绝招标人这种要求,而不会因此而导致投标保证金不予退还。 同意延长投标有效期的投标人既不能要求也不允许修改其投标文件,但需要相应的延长投标 保证金 的有效期,在延长的投标有效期内本须知第 19 条关于投标 保证金 的退还与 不予退还 的规定仍然适用。 19. 投标保证金 投标人应 于相应的投标截止 时间前,以投标保证金的方式,按投标须知前附表 第 6 项 中规 定数额
、雨种豆子晴种棉,种菜最好连阴天。 春雾狂风,夏雾热,秋雾连阴,冬雾雪。 清明种瓜,船装车拉。 二、诗歌欣赏: 有的人 24 —— 藏克家 有的人活着,他已经死了; 有的人死了,他还活着。 有的人骑在人民头上:“呵,我多伟大。 ” 有的人俯下身子给人民当牛马。 有的人把名字刻入石头想“不朽”; 有的人情愿作野草,等着地下的火烧。 有的人他活着别人就不能活; 有的人他活着为了多数人更好地活。
录,不及时、不真实填写巡检记录的,严格按考核标准考核。 巡检发现的问题要及时处理,凡自己能处理的不能推给班长,班组能解决的不能推给车间。 按岗位责任制和所管辖区域进行巡检,并转动巡检牌,任何人不得代替他人转动巡检牌。 岗位巡检牌要认真做好交接,不准破坏或丢失,并保持清洁卫生,否则按规定考核。 班长负责监督检查