汽车方面论文英语翻译内容摘要:
lubrication pump, thermostat, eliminating the pump abnormal noise, protection of copper, aluminum, tin and other metal parts to prolong tank life, to prevent the tank boil The engine work at normal temperature. Clear of Cooling scale measures maintenance: can be 2% caustic soda solution added to the cooling system, making the car driving all released one day after, and then rinse。 then the same caustic soda solution, put the for a day, and finally washed with water . Can also fill with water in the cooling system from the expansion tank outlet add 1kg of soda, car driving day to put the after the engine running at low speed and continue adding water from the filler, you can pletely remove scale. 2, leaking fluid, may have a leak, the water in the cylinder water jacket in the event of leakage, Water temperature gauge, water temperature will rise sharply, such a situation, you must promptly take the necessary measures in order to avoid not the necessary trouble, here to introduce to you Chi Puresistant S530 Cooling stanch agent for repair and protective effect of the cooling system is equivalent to 99 super repair agent and S201, engine repair and protection, to prevent the leakage of the tank, radiator, water pump, thermostat and other parts are unique, it can be used with any coolant blending, and can slow down the cooling system of impurities produce. In general, the cooling system failure, can not be enumerated. Under normal circumstances, you owners should follow such a principle, vehicles, each traveling 1,000 km, it should look at the work of the engine. In addition, the car just stop, can not immediately open the radiator cap in order to avoid burns. Fifth, Cooling System Works The function of the cooling system is to make the engine in any condition to an appropriate degree of cooling, thereby maintaining the appropriate temperature (coolant temperature) work. Chapter Three of the cooling system is characterized by The role of the traditional cooling system is to reliably protect the engine, but should also have a role to improve fuel economy and lower emissions. To this end, the cooling system should consider the following factors: internal engine friction losses。 the power of the cooling system pump。 bustion boundary conditions, such as the bustion chamber temperature, Charge density, charge and temperature. Advanced cooling system uses a systematic, modular design approach, and consider each of the influencing factors, so that the cooling system to ensure that the engine work properly, but also improves engine efficiency and reduce emissions. the temperature set point The limits of the engine operating temperature depends on the maximum temperature of the surrounding area of the exhaust valve. Ideally, the metal temperature than the coolant temperature controlled cooling system, so as to better protect the engine. Cooling temperature set by the cooling system is based on full load cooling rate basis, therefore, the engine and cooling system at part load in less than ideal, such as urban driving and low speed will result in high fuel consumption and emissions . By changing the set point of the coolant temperature can improve the performance of the engine and cooling system at part load. According to the temperature limit of the exhaust valve around the area, you can increase or reduce the set point of the metal temperature of the cooling fluid. Increase or decrease the temperature points have their own characteristics, depending on the desired purpose. to raise the temperature setpoint Increase the temperature set point is a popular method. Increase in temperature has many advantages, it directly affects the formation of engine wear and tear and the effect of the cooling system and engine emissions. Operating temperature will increase the engine oil temperature, reducing engine friction and wear, lower engine fuel consumption. Studies have shown that the engine operating temperature on the friction loss. Coolant discharge temperature to 150℃ , so that the cylinder temperature to 195℃ , fuel consumption decreased by 4% 6%. Coolant temperature will be maintained in the range of 90115 ℃ , so the engine oil temperature of 140℃ , the fuel consumption at part load decreased by 10%. Increase temperature significantly affect the performance of the cooling system. Improve coolant or metal temperature will improve the delivery of the engine and the cooling gas heat transfer effect, lower coolant flow rate, reducing the power rating of the pump, thereby reducing the power consumption of the engine. In addition, can be used in different ways, to further reduce the coolant flow rate. to lower the temperature setpoint Reduce the operating temperature of the cooling system can improve the engine volumetric efficiency, reduce intake air temperature. This bustion process, fuel efficiency and emissions favorable. The lower the temperature set point can save the engine operating costs and increase ponent life. Studies have shown that if the cylinder head temperature is reduced to 50℃ , ignition advance angle is 3176。 in advance A not occurred knock 2% volumetric efficiency, improved engine operating characteristics, helps to optimize the pression ratio and parameter selection to obtain more good fuel efficiency and emissions performance. Chapter Four cooling system overhaul Common cause of engine overheating reasons: the cooling air flow reduction (such as radiators blocking, etc.)。 cooling fan does not work。 low speed uphill, the ambient temperature is too high。 Vbelt is too loose, turn the efficiency is poor。 cylinder scale. thermostat failure, pump damage, thermal switch failure. In order to prevent the coolant temperature is too high,。汽车方面论文英语翻译
相关推荐
通管理部门提出书面复核申请。 答案: 正确 交通事故调解未达成协议及调解生效后当事人不履行的,当事人可以向人民法院提起民事诉讼。 答案:正确 交通事故仅造成重伤且驾驶人愿意承担全部责任的,可自行协商处理。 答案:错误 交通事故当事人逃逸造成证据丢失,逃逸当事人承担事故全部 责任。 答案:正确 机动车驾驶证申领和使用规定( 27 题) 选择题:( 13 题) 吊销机动车驾驶证后 申请驾驶证。
I 级钢 30d, II 级钢 40d,搭接位置:上部钢筋在跨中 1/3 范围内,下部钢筋在支座 1/3 范围内。 ⑷ 钢筋保护层:基础 40mm,柱、梁 30mm,板 20mm。 保护层采用 50mm 50mm 的水泥砂浆块。 板上部钢筋用马凳按梅花状支起。 9 ⑸ 所有钢筋绑扎,须填写隐检记录,质评资料及目检记录,验收合格后方可进行下道工序。 砼工程 ⑴ 水泥进场后须做复试
箔遗俯橙罚恰蛇梁等眷哪早万痔攫儒纬枚晤渣寒殊呼瓶 般炉殷轻斧陕篡怖榴故冻木钠琶痰民架螺臼洋软稗氛演晨呵色俄腐释蕉铸申毕度铸懊崖否爹 青少年是国家和民族的未来。 祖国的富强,中华民族的复兴,希望都寄托在你们身上。 青少年又是人生一段十分美好的时光。 青少年精力充沛,朝气蓬勃,而且思想活跃,思维敏捷,求知欲望强,并勇于实践,敢于创新,这些都是成年人无可比拟的优点。 但是,由于青少年涉世不深
度的执行情况负责;对销售部工作流程的正确执行负责。 4)收支管理负责 对确保货款及时回笼负责;对销售部预算开支的合理性负责。 5)信息完整负责 对销售部所掌握的信息完整性、秘密信息的安全负责。 张宏业 《汽车 4S 店运营手册》 第 18 页 / 共 147 页 18 权限 1) 对内对外的管理权限 a、有对销售部人员及各项工作的管理权; b、对重大促销活动有现场指挥权; c
工步一:加工右端法兰头 内孔及其端面 ,保证尺寸如下图所示:总长1140 、内孔Φ 71 、Φ 55 、Φ 50 、Φ 44 ,长度 2 、 、 切削用量的确定 法兰的毛坯为铸件,余量比较均匀,最大余量 ==,单边的加工余量为 ,采用硬质合金刀具, 刀杆直径为Φ 20, 刀杆伸出长度为90mm, 现取 ap =1mm, 查表 3— 15 得 进给量 f=查表 3— 19得
部门全体 国际部 17 巴基斯坦市场案列分析 ◆ 2 邓树林 部门全体 类型 序号 培训项目 培训预定时间 培训课时 培训讲师 培训对象 责任部门 1 2 3 4 5 6 7 8 9 10 11 12 月 月 月 月 月 月 月 月 月 月 月 月 专业知识 18 菲律宾市场案列分析 ◆ 2 周辉 部门全体 国际部 19 埃及市场案列分析 ◆ 2 魏泽添 部 门全体 20 阿尔及利亚市场案列分析