机械手臂外文翻译费下载内容摘要:

It originated in the atom, military industry, first through the operation of machines to plete a particular job, and later developed to operate using radio signals to carry out detecting machines such as the Moon. Used in industrial manipulator also fall into this category. The third category is dedicated manipulator, the main subsidiary of the automatic machines or automatic lines, to solve the machine up and down the workpiece material and delivery. This mechanical hand in foreign countries known as the Mechanical Hand, which is the host of services, from the hostdriven。 exception of a few outside the working procedures are generally fixed, and therefore special. Main features: First, mechanical hand (the upper and lower material robot, assembly robot, handling robot, stacking robot, help robot, vacuum handling machines, vacuum suction crane, laborsaving spreader, pneumatic balancer, etc.). Second, cantilever cranes (cantilever crane, electric chain hoist crane, air balance the hanging, etc.) Third, railtype transport system (hanging rail, light rail, single girder cranes, doublebeam crane) Four, industrial machinery, application of hand Manipulator in the mechanization and automation of the production process developed a new type of device. In recent years, as electronic technology, especially puter extensive use of robot development and production of hightech fields has bee a rapidly developed a new technology, which further promoted the development of robot, allowing robot to better achieved with the bination of mechanization and automation. Although the robot is not as flexible as staff, but it has to the continuous duplication of work and labor, I do not know fatigue, not afraid of danger, the power snatch weight characteristics when pared with manual large, therefore, mechanical hand has been of great importance to many sectors, and increasingly has been applied widely, for example: (1) Machining the workpiece loading and unloading, especially in the automatic lathe, bination machine tool use is more mon. (2) In the assembly operations are widely used in the electronics industry, it can be used to assemble printed circuit boards, in the machinery industry It can be used to assemble parts and ponents. (3) The working conditions may be poor, monotonous, repetitive easy to subfatigue working environment to replace human labor. (4) May be in dangerous situations, such as military goods handling, dangerous goods and hazardous materials removal and so on.. (5) Universe and ocean development. (6), military engineering and biomedical research and testing. Help mechanical hands: also known as the balancer, balance suspended, laborsaving spreader, manual Transfer machine is a kind of weightlessness of manual load system, a novel, timesaving technology for material handling operations booster equipment, belonging to kinds of nonstandard design of series products. Customer application needs, creating customized cases. Manual operation of a simulation of the automatic machinery, it can be a fixed program draws ﹑ handling objects or perform household tools to acplish certain specific actions. Application of robot can replace the people engaged in monotonous ﹑ repetitive or heavy manual labor, the mechanization and automation of production, instead of people in hazardous environments manual operation, improving working conditions and ensure personal safety. The late 20th century, 40, the United States atomic energy experiments, the first use of radioactive material handling robot, human robot in a safe room to manipulate various operations and experimentation. 50 years later, manipulator and gradually extended to industrial production sector, for the temperatures, polluted areas, and loading and unloading to take place the work piece material, but also as an auxiliary device in automatic machine tools, machine tools, automatic production lines and processing center applications, the pletion of the upper and lower material, or From the library take place knife knife and so on according to fixed procedures for the replacement operation. Robot body mainly by the hand and sports institutions. Agencies with the use of hands and operation of objects of different。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。