机械专业论文中英文对照内容摘要:
NSMISSION NOISE REDUCTION Introduction This section briefly describes the activities involved in reducing gear noise from a wheel loader transmission. The aim is to show how the optimization of the gear geometry described in Paper E is used in an industrial application. The author was project manager for the “noise work team” and performed the gear optimization. One of the requirements when developing a new automatic power transmission for a wheel loader was improving the transmission gear noise. The existing power transmission was known to be noisy. When driving at high speed in fourth gear, a high frequency gearwhine could be heard. Thus there were now demands for improved sound quality. The transmission is a typical wheel loader power transmission, consisting of a torque converter, a gearbox with four forward speeds and four reverse speeds, and a dropbox partly integrated with the dropbox is a chain of four gears transferring the powerto the output shaft. The gears are engaged by wet multidisc clutches actuated by the transmission hydraulic and control system. Gear noise target for the new transmission Experience has shown that the high frequency gear noise should be at least 15 dB below other noise sources such as the engine in order not to be perceived as disturbing or showed that if the gear noise could be decreased by 10 dB, this criterion should be satisfied with some margin. Frequency analysis of the noise measured in the driver39。 s cab showed that the dominant noise from the transmission originated from the dropbox gears. The goal for transmission noise was thus formulated as follows: “The gear noise (sound pressure level) from the dropbox gears in the transmission should be decreased by 10 dB pared to the existing transmission in order not to be perceived as unpleasant. It was assumed that it would be necessary to make changes to both the gears and the transmission housing in order to decrease the gear noise sound pressure level by 10 dB. Noise and vibration measurements In order to establish a reference for the new transmission, noise and vibration were measured for the existing transmission. The transmission is driven by the same type of diesel engine used in a wheel loader. The engine and transmission are attached to the stand using the same rubber mounts that are used in a wheel loader in order to make the installation as similar as possible to the installation in a wheel loader. The output shaft is braked using an electrical brake. Optimization of gears Noiseoptimized dropbox gears were designed by choosing macro and microgeometries giving lower transmission error than the original (reference) gears. The gear geometry was chosen to yield a low transmission error for the relevant torque range, while also taking into consideration variations in the microgeometry due to manufacturing tolerances. The optimization of one gear pair is described in more detail in Paper error is considered an important excitation mechanism for gear whine. Welbourn [1] defines it as “the difference between the actual position of the output gear and the position it would occupy if the gear drive were perfectly conjugate.” In this project the aim was to reduce the maximum predicted transmission error amplitude at gear mesh frequency (first harmonic of gear mesh frequency) to less than 50% of the value for the reference gear pair. The first harmonic of transmission error is the amplitude of the part of the total transmission error that varies with a frequency equal to the gear mesh frequency. A torque range of 100 to 500 Nm was chosen because this is the torque interval in which the gear pair generates noise in its design application. According to Welbourn [1], a 50% reduction in transmission error can be expected to reduce gearbox noise by 6 dB (sound pressure level, SPL). Transmission error was calculated using the LDP software (Load Distribution Program) developed at the Gear Laboratory at Ohio State University [3].The “optimization” was not strictly mathematical. The design was optimized by calculating the transmission error for different geometries, and then choosing a geometry that seemed to be a good promise, considering not only the transmission error, but also factors such asstrength, losses, weight, cost, axial fo。机械专业论文中英文对照
相关推荐
个项 目课题, 拿到课题就着手 准备、协调及落实工作。 整个教学及落实实施过程均围绕 这 个项目课题进行。 由于 新知识点较多 ,要 合 班 进行讲解。 计划 这个课题的相关知识点在 全班范围内讲,讲完一个知识点,再按分组分别落实。 接着下次课再进行下一个知识点的讲解 、 实施直至完成。 这 个课题同步分层次讲解,讲完 一 部分让学生完成一部分,这样整个 图画完以后,他们会明确的掌握
20 ( )适用于形状复杂的零件毛坯。 A 21 下列 ( )不属于工艺基准。 B 22 为了消除残余应力,在工艺过程中常需要安排 ( )处理。 C 23 定位误差、夹紧误差等都是 ( )。 A 24( )是在布轮、布盘等软性器具上涂上抛光膏,利用抛光器具的高速旋转,依靠抛光膏的机械刮擦和化学作用去除工件表面粗糙度的凸峰,使表面光泽的一种加工方法。 A 25 (
s/ accepted parts/good parts 良品 defective product/nongood parts 不良品 disposed goods 处理品 warehouse/hub 仓库 on way location 在途仓 oversea location 海外仓 spare parts physical inventory list 备品盘点清单 spare molds
赣州市招标投标中心招标 文 件 项目名称:机房系统集成及多媒体教室设备项目编号: GZ2020200二〇〇八年八月四日第一章 招遍芥辜渣退缔榔峰峻雇轨宿境皿厨凿丢诡抢苹兴亭壤洁梁掣抿识翅茎 啸宇湃媒堵担历孰侈菠翼另堰辜窿王忠描砌牟绚末掸延夫妒煽服颧醉反野确蝉 ②投标文件资料清单 机房系统集成及多媒体教室设备机房系统集成及多媒体教室设备项目招标文件( GZ2020200号)文本 11
下面我们就大资金进入股市的办法做一点探讨: 时代图文 全网络最大的股民超市 ,大量证券软件 ,选股公式更新下载 ,股市名家教学光盘 ,证券书籍 ,图文卡 ,内参资讯 ,免费电影 一 .上升通道吸筹方法: 选择在黎明前黑暗或者大盘人气悲观的时候,借着夜幕做掩护,悄悄地走出不为投资者所注意的缓慢上升通道。 这个时候,一般抛单多为割肉之举,机构操盘手 可以隐蔽吸纳廉价筹码。
、共赢、和谐、协同的合作文化,在迎接外部挑战的过程中,我们共同期待发展和超越,共同分享激情与快乐。 “合作的智慧 ”是决定莱安青春永葆的最终动力。 客户服务:以高科技手段、专业化的服务为客户创造价值 分布于神州大地各行业中的 800 万中小企业是中国最具活力的经济力量,虽然没有强势的市场影响力和雄厚的资金储备,但无疑,个性张扬的他们最具上升的潜力,后 WTO 时 代市场开放融合