有关单片机中英文翻译论文内容摘要:
spirator, the various analyzers, monitors, ultrasound diagnostic equipment and hospital beds, etc. call system. 6. In a variety of major appliances in the modular applications Designed to achieve some special single specific function to be modular in a variety of circuit applications, without requiring the use of personnel to understand its internal structure. If music integrated single chip, seemingly simple function, miniature electronic chip in the (the principle is different from the tape machine), you need a puter similar to the principle of the plex. Such as: music signal to digital form stored in memory (like ROM), read by the microcontroller, analog music into electrical signals (similar to the sound card). In large circuits, modular applications that greatly reduce the volume, simplifies the circuit and reduce the damage, error rate, but also easy to replace. 7. Microcontroller in the application field of automotive equipment SCM in automotive electronics is widely used, such as a vehicle engine controller, CAN busbased Intelligent Electronic Control Engine, GPS navigation system, abs antilock braking system, brake system, etc.. In addition, the MCU in business, finance, research, education, national defense, aerospace and other fields has a very wide range of applications. Application of six important part of learning MCU learning an important part of the six applications 1, Bus: We know that a circuit is always made by the devices connected by wires, in analog circuits, the connection does not bee a problem because the device is a serial relationship between the general, the device is not much connection between the , but the puter is not the same circuit, it is a microprocessor core, the device must be connected with the microprocessor, the device must be coordination between, so they need to connect on a lot, as if still analog circuit like the microprocessor and devices in the connection between the individual, the number of lines will be a little more surprising, therefore the introduction of the microprocessor bus Chong Each device Gong tong access connections, all devices 8 Shuju line all received eight public online, that is the equivalent of all devices together in parallel, but only this does not work, if there are two devices send data at the same time, a 0, a 1, then, whether the receiver received what is it? This situation is not allowed, so to be controlled by controlling the line, timesharing the device to work at any time only one device to send data (which can have multiple devices to receive both). Device39。 s data connection is known as the data bus, the device is called line of control all the control bus. Internal or external memory in the microcontroller and other devices have memory cells, the memory cell to be assigned addresses, you can use, distribution, of course, to address given in the form of electrical signals, and as more memory cells, so, for the address allocation The line is also more of these lines is called the address bus. 2, data, address, mand: The reason why these three together because of the nature of these three are the same the number, or are a string of 39。 0 39。 and 39。 139。 form the sequence. In other words, addresses, instructions are also data. Instruction: from single chip designer provides a number of monly used instructions with mnemonic we have a strict correspondence between the developer cannot be changed by the MCU. Address: the search for MCU internal, external storage units, input and output port based on the address of the internal unit value provided by the chip designer is good, cannot be changed, the external unit can be single chip developers to decide, but there are a number of address units is a must (see procedures for the implementation of the process). 3, P0 port, P2 and P3 of the second function I use: Beginners often on the P0 port, P2 and P3 port I use the second function puzzled that the second function and have a switch between the original function of the process, or have a directive, in fact, the port the second feature is automatic, do not need instructions to convert. Such as , respectively WR, RD signal, when the microchip processing machines external RAM or external I/O port, they are used as a second function, not as a generalpurpose I/O port used, so long as a microprocessor implementation of the MOVX instruction, there will be a corresponding signal sent from the or , no prior use of mands. In fact 39。 not as a generalpurpose I/O port use39。 is also not a 39。 no39。 but (user) 39。 not39。 as a generalpurpose I/O port to use. You can arrange the order of a SETB 39。 s instructions, and when the MCU execution to the instruction, the also make into a high, but users will not do so because this is usually will cause the system to collapse. 4, the program39。 s implementation: Reduction in power after the 8051 microcontroller within the program counter (PC) in the value of 0000 39。 , the process is always from the 000039。 units started, that is: the system must exist in ROM 0000 39。 this unit, and in 0000 39。 unit must be stored in a single instruction. 5, the stack: Stack is a region, is used to store data, there is no special about the region itself is a part of internal RAM, special access to its data storage and the way that the socalled 39。 advanced post out backward first out 39。 , and the stack has a special data transmission instructions that39。 PUSH 39。 and39。 POP 39。 , has a special expertise in its services unit, that is, the stack pointer SP, whenever a PUSH instruction execution, SP on (in the Based on the original value) automatically add 1, whenever the implementation of a POP instruction, SP will (on the basis of the original value) automatically by 1. As the SP values can be changed with the instructions, so long as the beginning of。有关单片机中英文翻译论文
相关推荐
人民在世界各地都更加扬眉吐气。 90 年来,不论国际风云如何变幻,不管遇到什么样的困难和挑战,中国共产党都无所畏惧,勇往直前,带领全国人民开拓进取谋发展,与时俱进创辉煌。 在步入 21 世纪新的历史时期,我们党为中国的繁荣昌盛,为和谐发展创造出更辉煌的业绩,演绎出中华民族更 灿烂的篇章。 我们党以实现中华民族伟大复兴为己任,带领全国人民走出了一条强国富民之路。 广大党员牢记党的宗旨
989的2.02%,迅速上升到1996年的3.21%,年增长率超过0.1%12,目前 全国糖尿病患者总数约4000万。 糖尿病给人类带来的危害巨大,包括 给患者造成生活上的不便以及肉体和精神上的痛苦,其并发症对健康和生命的威胁,甚至导 致残废和早亡,还能造成巨大的资金和资源上的浪费。 但糖尿病是一种可防可治之病,糖尿病的慢性并发症,也是可以预防和治疗的。 国外资料表明,糖尿病控制不 佳
英语作文题目 英语作文带翻译 关于新年的英语作文 英语作文万能句子 英语作文大全 初中英语作文 考研英语作文 英语六级作文 四级英语作文 小学英语 高中英语作文 大学英语作文 散文 感悟生活 爱情滋味 挚爱亲情 友情天地 青春校园 婚姻物语 河山雅韵 随笔小扎 初中作文 初中一年级作文 初中二年级作文
可以转化的。 胜不骄,败不馁。 失败往往是黎明前的黑暗,继之出现的就是成功的朝霞。 —— 霍奇斯 爱迪生发明电灯,历经了几万次失败,但他始终不气馁,最终发明了电灯。 威灵顿失败而不气馁,重整旗鼓打垮拿破仑。 (《失败是个未知数》) 越王勾贱先败后胜(卧薪尝胆)、吴王夫差先胜后败。 七、时间 时间就是生命,时间就是速度,时间就是力量。 郭沫若 时间就是生命。 无缘无故地耗费别人的时间,跟
貌、思想品格等方面逐步渗透,用自己的行为给他们树立榜样,对于我们班学生来说,我觉得他们在思想品德、行为习惯方这方面是非常优秀的。 教学方面 备课深入细致。 平时认真研究教材,多方参阅各种资料,力求深入理解教材,准确把握难重点。 在制定教学目的时,非常注意学生的实际情况,工作总结《工作总结》。 教案编写认真,并不断归纳总结经验教训。 狠抓基础知识和基本技能 范文最新推荐 12 由于我班学生基础较差
各样的处理方式。 这样,学生的朗读水平势必得不到提高。 老师缺乏示范小学生的模仿能力强,老师的示范往往收效很快。 但遗憾的是课堂里我忽视了这点,几乎没有示范读,学生自然收效甚微了。 反思二:写作指导不够 作文是用文字或口头语言表达思想感 情的活动,是对学生进行语文能力综合训练的重要方式,也是发展学生智力、创造力良好个性心理品质的重要途径。