实用修造船英语手册内容摘要:

ylinder 4)排渣 Sludge discharge 5)反馈装置 Feedback device 制淡装置 Fresh water generator 6)舵 Rudder 焚烧炉 Incinerator 舵叶 Rudder blade 油水分离器 Oil water separator 舵杆 Rudder stock 1生活污水处理器 Sewage treat plant 上舵承 Rudder carrier 1大气冷凝器 Atmosphere condenser 35 36 热水井 Cascade and inspection(hot well) 5)主机燃油供给泵 Main engine fuel oil supply pump 滑油自清滤器 The automatic backflash lubricating oil filter 6)主机燃油增压泵 Main engine fuel oil booster pump 燃油单元 Fuel oil unit 7)主机十字头泵 Main engine cross head pump 1)主机燃油单元 Fuel oil unit of 8)付机海水泵 Generator engine sea water pump 2)付机燃油单元 Fuel oil unit of 9)付机缸套水泵 Generator engine cylinder cooling water pump 3)粘度计 Viscosity controller 10)锅炉给水泵 Feed water pump of boiler 泵 Pump 11)锅炉燃油泵 Fuel oil pump of boiler 1)主机滑油泵 Main engine lubricating oil 12)分油机供给 Fuel oil supply pump of 船舶英语实用手册 第 11 页码共 35 页 pump 泵 purifier 2)主机缸套水泵 Main engine cylinder cooling water pump 13)制淡海水泵 Sea water pump of fresh water generator 3)主机缸套水预热泵 Main engine cylinder cooling water preheating pump 14)压载泵 Ballast pump 4)主机海水泵 Main engine sea water pump 15)舱底消防泵 Bilge and fire pump 37 38 17)油渣泵 Sludge oil pump 柴油澄清舱 Diesel oil setting tank 18)柴油输送泵 Diesel oil transport pump 燃油日用柜 Fuel oil daily tank 19)燃油油输送泵 Fuel oil transport pump 燃油澄清舱 Fuel oil setting tank 20)汽缸油输送泵 Cylinder oil transport pump 滑油澄清舱 Lubricating oil setting tank 21)淡水输送泵 Fresh water transport pump 滑油储藏舱 Lubricating oil store tank 22)热水循环泵 Hot water circulating pump 滑油循环舱 Lubricating oil circulating tank 23)饮水日用泵 Drinking water pump 燃油溢油舱 Fuel oil overflow tank 舱底消防总用泵 Bilge, fire and pump 燃油油渣舱 Fuel oil sludge tank 喷淋泵 Sprinkling pump 10 燃油深舱 Fuel oil deep tank 停泊海水泵 Harbor sea water pump 11 滑油污油舱 Lubricating dirty oil tank 12 滑油溢油舱 Lubricating oil overflow tank 二、各种舱(箱)柜 All kinds of tank 13 滑油油渣打舱 Lubricating oil sludge tank 柴油日用柜 Diesel oil daily tank 14 主机淡水膨胀水箱 fresh water expansion tank 15 付机淡水膨胀水箱 fresh water expansion tank 39 40 1淡水压力柜 Fresh water pressure tank 滑油系统 Lubricating oil piping system 1热水压力柜 Hot water pressure tank 燃油系统 Fuel oil piping system 1饮水压力柜 Drinking water pressure tank 海水系统 Sea water piping system 1淡水舱 Fresh water tank 缸套水系统 Cylinder cooling water 船舶英语实用手册 第 12 页码共 35 页 piping system 饮水舱 Drinking water tank 启动空气系统 Start air piping system 2锅炉水舱 Boiler water tank 控 制空气系统 Control air piping system 2分油机工作水箱 Purify operating water tank 排气系统 Exhaust piping system 2汽缸油日用柜 Cylinder oil daily tank 日用供水系统 Daily water piping system 2尾管滑油重力柜 Gravity tank of tube oil 蒸汽系统 Steam piping system 2排气水封箱 Exhaust seal water tank 10 、锅炉给水和凝水系统 Feed water and condensate of boiler piping system 2蒸馏水水舱 Distilling water tank 1燃油净油系统 Fuel oil purified piping system 2污水井 Bilge well 1燃油输送系统 Fuel oil transport piping system 三、各种管系系统 All kinds of pipes 33 41 舵销 Rudder pintle 1滑油净油系统 Lubricating oil purified piping system 舵杆衬套 rudder stock liner 1滑油输送系统 Lubricating oil transport piping system 舵杆轴套 Sleeve for rudder stock 1舱底压载系统 Ballast and bilge water piping system 舵销承衬套 Bush for rudder pintle 四 、仪表类 Instructions 舵销轴套 Sleeve for rudder pintle 压力表 Pressure gauge 上舵承底座 Rudder carrier seat 真空表 Vacuum gauge 舵销承座 Pintle bearing 温度计 Thermometer 舵杆承座 Rudder stock bearing 吨位表 DWT gauge 挡圈 Retaining ring 遥测表 Distant survey gauge 舵柄 Tiller 液全器 Level switch 7)舵角 The angle of rudder 空压机 Air pressor 1)主空压机 Emergency air pressor 2)应急空压机 42 43 传感器 Sensor 1机控室 Engine control room 五、其它 Others 1台虎钳 Vise (=vice) 船舶英语实用手册 第 13 页码共 35 页 风机 Fan 1表铜截止阀 Bronze close valve 防海 生物装置 Antifoul STM plant 1表铜截止止回阀 Bronze check valve 泡沫柜 Air foam tank 1铸铁截止阀 Cast iron stop valve 中间轴 Middle shaft 1铸铁截止止回阀 Cast iron check and stop valve 尾轴 Propeller shaft 1调节阀 Adjustable valve 螺旋桨 Propeller 1溢流阀、安全阀 Relief valve 中间轴承 Line shaft bearing 减压阀 Reducing valve 泡沫灭火机 Foam fire extinguisher 六、材料 Material 饮水消毒装置 Sterilizer plant 管子 Pipe 主配电板 Main switch board 无缝钢管 Seamless steel pipe (tube) 1机舱集控台 Engine room control console 紫铜管 Purple copper pipe 44 45 铁法兰 Iron flange 1支架(马脚) Clamp 铜法兰 Copper flange 1油漆 Paint 盲板法兰 Blindflange 备件 Spare parts 螺丝(螺栓) Bolt 双头螺丝 Stud 七、生产工具 Produce tool 螺帽(螺母) Nut 图纸 Drawing 不锈钢螺丝 Stainless steel bolt 活络钣 Adjustable spanner 1垫片(床) Gasket 令司板(梅花钣) Ring spanner 1橡皮床 Gum gasket 开口钣 Open – ender spanner 1纸箔床 Paper copper gasket 管子钳 Pipe wrench 1紫铜床 Purple copper gasket 凿子 Chisel 1石墨床 Black lead gasket 锒头 Hammer 1青铅床 Black lead gasket 锉刀 File 1佛纳 Feeler gauge 螺丝刀 Screwdriver 46 47 油漆滚筒 Paint roller 首先请检查安装说明和电气绝缘 1油漆刷子 Paint brush Please check the condition of installation and insulation first 1钢锯 Hacksaw 我们准备将油水分离器动转 1套筒扳手 Socket spanner Now we will run the oilywater separator 船舶英语实用手册 第 14 页码共 35 页 1手电筒 Torch 请检查动转情况 1钻。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。