初中生英语作文范文10篇内容摘要:

d time with these subjects and they found out the worst report was from these subjects‟ teachers. And what about boys? Of course, most boys‟ heart are in math, chemistry and physics. So boys always get good grades in these subjects. But most boys dislike Chinese or art. Perhaps they think Chinese and art are really boring. Boys and girls both like English. So English is the most popular subject in 2020. At last, what‟s your favorite subject? You could write a letter to tell us. ⑤ People help with each other, it is the greatest thing in the world. We should give our love to people who need help. It was a nice day. A blind person Ben walked with a walking stick. When he was walking down the street, a little boy tumbled because of banana skin. Maybe there is something wrong with his legs. So the little boy cried and sat on the floor. Although Ben can‟t see anything, he walked to the little boy. Ben wanted to help the boy. So Ben said,” Don‟t cry. Let me help you.” The little boy was very happy. Ben carried the little boy on the back. The little boy help Ben, too. So they were very happy. If you see someone needs help, please help him. I‟m sure you will be very happy. ⑥ Dear Friend Thank You For your Love Dear friend Lucy, thank you for your love. We get on well with each other in daytoday lives. As for my friend, you always help me with my study. When I have a few difficulties, you always encourage me to get over difficulties. Do you remembe。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。