ul8750最新英文版内容摘要:

. . . . . . . . . .46 Adhesive support test . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .47 Environmental tests . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .47 UL COPYRIGHTED MATERIAL – NOT AUTHORIZED FOR FURTHER REPRODUCTION OR DISTRIBUTION WITHOUT PERMISSION FROM UL Document Was Downloaded By jeanne han For Use By CHENGDU NETON OPTOELECTRONIC TECHNOLOGIES CO LTD 30232 : 6/27/2014 9:58 AM 4 UL 8750 OCTOBER 17, 2020 Mechanical strength tests for metal enclosures . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .51 Determination of lowvoltage, limitedenergy circuit status . . . . . . . . . . . . . . . . . . . . . . . . .51 Knockout secureness test . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .52 Thermal aging test . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .52 9 Markings . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .52A General . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .52A Identi174。 cation and ratings . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .53 Constructionrelated markings . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .54 APPENDIX A Standards for Components . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . A1 APPENDIX B Additional Requirements for Power Supplies that Comply with UL 609501 UL COPYRIGHTED MATERIAL – NOT AUTHORIZED FOR FURTHER REPRODUCTION OR DISTRIBUTION WITHOUT PERMISSION FROM UL Document Was Downloaded By jeanne han For Use By CHENGDU NETON OPTOELECTRONIC TECHNOLOGIES CO LTD 30232 : 6/27/2014 9:58 AM NOVEMBER 18, 2020 UL 8750 5 INTRODUCTION 1 Scope These requirements cover LED equipment that is an integral part of a luminaire or other lighting equipment and which operates in the visible light spectrum between 400 177。 700 nm. These requirements also cover the ponent parts of light emitting diode (LED) equipment, including LED drivers, controllers, arrays, modules, and packages as de174。 ned within this standard. These lighting products are intended for installation on branch circuits of 600 V nominal or less in accordance with the National Electrical Code (NEC), ANSI/NFPA 70, and for connection to isolated (nonutility connected) power sources such as generators, batteries, fuel cells, solar cells, and the like. LED equipment is utilized in lighting products that ply with the endproduct standards listed below. The requirements in this standard are intended to supplement those in other endproduct standards. Included are: a) Electric Signs, UL 48, b) Portable Electric Luminaires, UL 153, c) Underwater Luminaires and Submersible Junction Boxes, UL 676, d) Emergency Lighting and Power Equipment, UL 924, e) Stage and Studio Luminaires and Connector Strips, UL 1573, f) Track Lighting Systems, UL 1574, g) Luminaires, UL 1598, h) Direct PlugIn Nightlights, UL 1786, i) Low Voltage Landscape Lighting Systems, UL 1838, j) SelfBallasted Lamps and Lamp Adapters, UL 1993, k) Luminous Egress Path Marking Systems, UL 1994, and l) Low Voltage Lighting Systems, UL 2108. UL COPYRIGHTED MATERIAL – NOT AUTHORIZED FOR FURTHER REPRODUCTION OR DISTRIBUTION WITHOUT PERMISSION FROM UL Document Was Downloaded By jeanne han For Use By CHENGDU NETON OPTOELECTRONIC TECHNOLOGIES CO LTD 30232 : 6/27/2014 9:58 AM 6 UL 8750 NOVEMBER 18, 2020 2 General Components Except as indicated in this clause, a ponent of a product covered by this standard shall ply with the requirements for that ponent. See the Standards for Components appendix for a list of standards covering ponents generally used in the products covered by this standard. A ponent is not required to ply with a speci174。 c requirement that: a) Involves a feature or characteristic not required in the application of the ponent in the product covered by this standard, or b) Is superseded by a requirement in this standard. A ponent shall be used in accordance with its rating established for the intended conditions of use. Speci174。 c ponents are inplete in construction features or restricted in performance capabilities. Such ponents are intended for use only under limited conditions, such as certain temperatures not exceeding speci174。 ed limits, and shall be used only under those speci174。 c conditions. Units of measurement Except for conductor size, values stated without parentheses are the requirement. Values in parentheses are explanatory or approximate information. All values of voltage and current are true root mean square (rms) values unless otherwise indicated. For customary purposes wire sizes are in American Wire Gauge (AWG). Reference pub。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。