[friends老友记剧集英文剧本第二季内容摘要:
e? PHOEBE: It39。 s too soon to tell. She39。 s resting, which is a good sign. ROSS: How39。 s the hair? PHOEBE: I39。 m not gonna lie to you, Ross, it doesn39。 t look good. I put a clip on one side, which seems to have stopped the curling. JOEY: Can we see her? PHOEBE: Your hair looks too good, I think it would upset her. Ross, you e on in. (They go into the bedroom leaving Joey and Rachel alone.) JOEY: How39。 re you doing? RACHEL: I39。 m ok. JOEY: Ooh, that bad, huh? Look, I can sense when women are depressed and vulnerable. It39。 s one of my gifts. RACHEL: When I saw him get off that plane with her, I really thought I hit rock bottom. But today, it39。 s like there39。 s rock bottom, then 50 feet of crap, then me. JOEY: You gotta tell Ross how you feel. RACHEL: Come on. How can I just tell him? What about Julie? JOEY: What about her? They39。 ve only been going out for two weeks. Ross has been in love with you for like 10 years. RACHEL: I don39。 t know, I don39。 t know. JOEY: Look, Rache, Rache, I39。 ve been with my share of women. In fact, I39。 ve been with like a lot of people39。 s share of women. The point is, I39。 ve never felt about anyone the way Ross felt about you. CHANDLER: (entering, angry) Yo, paisan! Can I talk to you for a sec? Your tailor is a very bad man! JOEY: Frankie? What39。 re you talking about? ROSS: (entering from teh bedroom) Hey, what39。 s goin39。 on? CHANDLER: Joey39。 s tailor...took advantage of me. ROSS: What? JOEY: No way. I39。 ve been going to the guy for 12 years. CHANDLER: He said he was going to do my inseam, 圣城家园 中英双字幕《老友记》收藏版 Season 2 2 of 49 Pages and he ran his hand up my leg, and then, there was definite ROSS: what? CHANDLER: Cupping. JOEY: That39。 s how they do pants! First they go up one side, they move it over, they go up the other side, they move it back, and then they do the rear. What? Ross, Ross, would you tell him? Isn39。 t that how they measure pants? ROSS: Yes, yes it is. In prison! Whatsa matter with you? JOEY: What? That39。 s not? Oh my god. [Scene: Monica and Rachel39。 s, later that day. Monica is now out and about.] MONICA: Even Mary Tyler Moore would39。 ve been better. ROSS: I like it. I do, I think it39。 s a Ten. MONICA: Thank you. My hair is very amused. CHANDLER: Come on, Monica, things could be worse. You could get caught between the moon and New York City. I know it39。 s crazy, but it39。 s true. PHOEBE: Thank you. ROSS: Well, I gotta go. Bye. Bye, Rache. RACHEL: (sticking her head in from the balcony) Wait, are you leaving? ROSS: Yeah, that39。 s kinda what I meant by bye! RACHEL: Well, can I talk to you for a sec? ROSS: Okay. (goes out onto the balcony) JOEY: Hey, when the doctor does that hernia test... CHANDLER: That39。 s ok. [Out on the balcony] ROSS: What39。 s goin39。 on? RACHEL: Well, first of all, Paulo and I are not back together. It was just a stupid thing I did, and if I could go back in time and do it again, well, I wouldn39。 t. Um, second of all, what? (Ross laughs) ROSS: Ok. Well, before I say anything, I just need to know, is this one of those things where you break up with a guy, and then I tell you what I think, and then the next day you get back together with the guy, and I look like a plete idiot? RACHEL: No. Nononono. ROSS: Well, then, I think, I think the guy is scum. I hate him. I physically hate him. I always have. You are way too good to be with a guy like that. You deserve to be with someone who appreciates you, and who gets how funny and sweet and amazing, and adorable, and sexy you are, you know? Someone who wakes up every morning thinking Oh my god, I39。 m with Rachel. You know, someone who makes you feel good, the way I am with Julie. Was there a second of all? RACHEL: No, I think that was the whole all. [Cut back inside, Joey is on the phone.] JOEY: I swear to god, Dad. That39。 s not how they measure pants. CLOSING CREDITS [Scene: Central Perk, Julie is wanting to get her hair cut from Phoebe.] JULIE: I was thinking of doing it a little shorter, you know, like Andy McDowell39。 s new haircut? PHOEBE: You wanna do it right now? JULIE: Great! (Julie leaves) PHOEBE: (to Rachel) Ok, I just wanna be really sure this time. Andy McDowell39。 s the girl from Four Weddings and a Funeral, right? RACHEL: No. No no no no no. That39。 s Rodney McDowell. Andy McDowell is the guy from Pla of the Apes. PHOEBE: Oh, yeah. Ok, thank you. RACHEL: You39。 re wele. END 202 The One With the Breast Milk [Scene: Monica and Rachel39。 s, Carol and Susan are showing off Ben to the gang.] MONICA: (entering from her bedroom carrying a present) Ok, these were unbelievably expensive, and I know he39。 s gonna grow out of them in like, 20 minutes, but I couldn39。 t resist. (There a little pair of Nike shoes.) PHOEBE: Oh, look at these! Hey, Ben. Just do it. (Ben starts to cry) Oh my god, oh, ok, was that too much pressure for him? SUSAN: Oh, is he hungry already? CAROL: I guess so. (Carol starts to breast feed Ben.) CHANDLER: You know, it39。 s... (sees the feeding taking place next to him) something funny about sneakers. I39。 ll be right back. (Goes into the kitchen) JOEY: (joins him) I gotta get one, too. ROSS: (following them into the kitchen) What are you guys doing? CHANDLER: We39。 re just hanging out by the spoons. Ladle? ROSS: Look, would you guys grow up? That is the most natural beautiful thing in the world. JOEY: Yeah, we know, but there39。 s a baby suckin39。 on it. ROSS: This is my son having lunch, ok? It39。 s gonna happen a lot, so you39。 d better get used to it. Now if you have any problem with it, if you39。 re unfortable, just ask questions. Carol39。 s fine with it, now e on. (They go back into the living room) CHANDLER: Carol, Carol? I was just wondering if Joey could ask you a question about breastfeeding? CAROL: Sure. JOEY: Uh, does it hurt? CAROL: It did at first, but not。[friends老友记剧集英文剧本第二季
相关推荐
、《儿子与情人》 : AA、《洪堡的礼物》 B、《窥视者》 C、《儿子与情人》 D、《家长的没落》 ,就是为使人恢复对生活的感觉,就是为使人感受事物,使石头显出石头的质感。 艺术的目的是要人感觉到事物,而不是仅仅知道事物。 艺术的技巧就是使对象陌生,使形式变得困难,增加感觉的难度和时间长度,因为感觉过程本身就是审美目的,必须设法延长。 ”这是谁的著名论断: CA、高尔基 B、罗伯 — 格里耶 C
“手不释卷”讲的是三国时期吴国大将吕蒙的故事。 ( ) “袅”字共有 11 笔。 ( ) 三、日积月累 写出三个与战争有关的成语 写出你在本册中学到的袁枚写的一句诗。 《梅花魂》一文中,作者通过几个事例表达了外祖父对祖国的思念之情,请你用简短的语言写出其中的两个来。 (一共不超过 20 个字) 《那片绿绿的爬山虎》中有一些含义深刻的语句,请你写出一句来。 四、连一连 《两个铁球同时着地》 罗丹
系(教研室) 主任(签字): 注:任务书应该附在已完成的毕业设计(论文)的首页。 北京航空航天大学毕业设计 (论文 ) 本人声明 我声明,本论文及其研究工作 是由本人在导师指导下独立完成的,在完成论文时所利用的一切资料均已在参考文献中列出。 作者: 签字: 时间: 2020 年 月 北京航空航天大学毕业设计 (论文 ) 第 I 页 论文 题目 作 者: 指导教师: 摘 要 关键词:
程质量。 4)工程部职责 对施工进度实施有效管理,从计划进度、实施进度和进度调整等多方面进行控制,确保项目如期完工。 具体负责工程项目的技术管理工作,完成现场的验收、检查工作。 负责编制施工大纲,并确定施工大纲是否符合工程实际需要。 对各班组的施工组织设计和施工方案进行审核检查,协调各班组施工方案上的矛盾冲突。 对各专业班组的深化图进行审核协调,避免发生设计与施工的矛盾而造成不必要的返工。
买方检验员在卖方制造场所进行检验时,卖方有责任提供给买方检验员一个安全的工作环境,并且告知其潜在的危险。 如果检验员认为工作环境不安全,检验员可以不履行其工作。 卖方工作人员在买方施工现场进行服务时,应该遵守买方施工现场的 “安全 /环境管理规定 ”,听从买方施工现场安全工程师的指挥。 卖方用于包装货物的包装材料应是符合环境要求的包装材料 山西国电 XX 风电工程