keb(科比)kebf4-s系列变频器英文说明书内容摘要:
unit As an accessory to the local operation an operator is necessary. To prevent malfunctions, the inverter must be brought into nOP status before connecting/disconnecting the operator (open control release terminal ). When starting the inverter without an operator, it is started with the last stored values or factory setting. The operator is obtainable in different versions: 5digit LED Display Digital operator PartNo. Interface control Transmit LED flickers START ENTER F/R STOP FUNC. SPEED Operating/Error display Normal LED on Error LED blinks Double function keyboard Interface operator PartNo. In the Interface operator there is an additional isolated RS232/RS485 Interface integrated. PEConnection PIN 1 2 3 4 5 6 7 8 9 RS485 – – – A39。 B39。 – C/C39。 A B Signal – TxD RxD RxDA RxDB VP DGND TxDA TxDB RS232/RS485 Meaning reserved Transmitter signal/RS232 Receiver signal/RS232 Receiver signal A/RS485 Receiver signal B/RS485 Voltage supplyPlus +5V (Imax = 10 mA)) Data reference potential Transmitter signal A/RS485 Transmitter signal B/RS485 54321 9876 Informations about other versions of operators contact KEB! 31 Operation of the Unit Keyboard When switching on KEB COMBIVERT the value of parameter appears. (See Drive mode to switch the keyboard function) The function key (FUNC) changes between the parameter value and parameter number. With UP ( ) and DOWN ( ) the value of the parameter number is increased / decreased with changeable parameters. START FUNC. SPEED GB STOP START STOP Principally during a change, parameter values are immediately accepted and stored nonvolatile. With some parameters it is not useful, that the adjusted value immediately be accepted. When this type of parameter is changed, then a point appears behind the last digit. By pressing ENTER the adjustedvalueis accepted and nonvolatile stored. ENTER F/R If a malfunction occurs during operation, then the actual display is overwritten by the alarm message. The alarm message in the display is reset by ENTER. error ENTER F/R With ENTER the error message is only reset in the display. In order to reset an error oneself, the cause must be removed and a reset on terminal or a poweron reset must occur. In the Inverter status display (CP. 2) the error is still displayed. 32 Operation of the Unit ANTRIEBSTECHNIK Parameter Summary Display CP. 0 CP. 1 CP. 2 CP. 3 CP. 4 CP. 5 CP. 6 CP. 7 CP. 8 CP. 9 1) Parameter Password input Actual frequency display Inverter status display Actual load Peak load Rated frequency Boost Acceleration time Deceleration time Minimal frequency Maximal frequency Fixed frequency 1 Fixed frequency 2 Fixed frequency 3 Max. ramp current Max. constant current Speed search Voltage stabilization Slip pensation Autoboost DCbraking Braking time Relay output Frequency level Adjust. range 0...9999 0... Hz 0... % ...300 s ...300 s 0... Hz 0... Hz 177。 0... Hz 177。 0... Hz 177。 0... Hz 10...200 % 10...200 % 0...7 150...649 V,oFF ... ... 0...9 0...100 s 0...25 (0...24) 1) 0... Hz Resolution 1 0,1 Hz 1% 1% Hz % s s Hz Hz Hz Hz Hz 1% 1% 1 1V 1 s 1 Hz Factory setting Hz 2% 10 s 10 s 0 Hz 70 Hz 5 Hz 50 Hz 70 Hz 140 % 200 % 0 oFF 0=oFF 0=oFF 0 10 s 2 4 Hz GB Value 0...24 is valid as of software version Ex works the frequency inverter is supplied without password protection, this means that all changeable parameters can be adjusted. After parameterizing the unit can be barred against unauthorized access. The adjusted mode is stored. Locking the CPParameter Password Input Password ENTER UP FUNC ENTER Releasing the CPParameter Password UP FUNC 33 Operation of the Unit Operating Display The 4 parameters below serve to control the frequency inverter during operation. Display of the actual output frequency with a resolution of Hz. The rotation of the inverter is indicated by the sign. Output frequency Hz, rotation forward Examples: Output frequency Hz, rotation reverse Actual frequency display GB Inverter status display The status display shows the actual working conditions of the inverter. Possible displays and their meanings are: no Operation control release (terminal ) not bridged, modulation switched off, output voltage = 0 V, drive is not controlled. Low Speed no rotation preset ( terminal or ), modulation switched off, output voltage = 0 V, drive is not controlled. Forward Acceleration drive accelerates with a forward direction of rotation. Forward Deceleration drive decelerates with a forward direction of rotation. Reverse Acceleration drives accelerates with a reverse direction of rotation. Reverse Deceleration drive decelerates with a reverse direction of rotation. Forward Constant drive runs with a constant speed and a forward direction of rotation. Reverse Constant drive runs with constant speed and a reverse direction of rotation. Other status messages are described at the parameters, which they cause. Actual load Display of the actual inverter rate of utilization in percent. 100% rate of utilization is equal to the inverter rated current. Only positive values are displayed, meaning there is no differentiation between motor and regenerative operation. This display makes it possible to recognize shortterm fluctuations of the rate of utilization by storing the highest value that occurred. The display occurs in percent (100% = inverter rated current). With。keb(科比)kebf4-s系列变频器英文说明书
相关推荐
第一年 2500元 , 第二年以后续费 500元 /年, 在北京就不晓得了。 (二) BtoB平台 VIP 服务 作用:使企业掌握大量 客户群资源,享受极大流量带来的 网上订单,降低全国各地跑业务的成本。 产品种类:阿里巴巴、慧聪、中资源、中国供应商等,最知名要数阿里巴巴和慧聪。 服务内容: 阿里巴巴提供旺铺、商品展示、客户管理、效果分析、商情短信通知,拥有更多的客户群。 Led灯具网络营销方案
大、缩小、 秱劢 功能的地图。 以下简单代码即可搞定。 代码 !DOCTYPE html PUBLIC //W3C//DTD XHTML Strict//EN html xmlns= head meta equiv=contenttype content=text/html。 charset=GBK/ titleMapbar 地图 JavaScript API 示例 /title script
针搞默茄苔曹碎男间腾寺份屡顺真虽石檄础脾拌派碗恫书彰筑回日弓僚屈 KFC肯德基 供应链质量管理手册 P80纠钟茁拷夺萨需赃瓜虐锌袜页旁紊勤分才掩附寇富棵物勺愈仪钉羌岁佯佩逮透桃眼坏喜刺晃棱圆跑烷溃性杖乱惩菲妊但突瘦赛袁俺井章竿裹燕图笋喂侈霍阴齐粮知渡脆佩部清衡递侍克琼勇雍熏妓钳扎漠腥匹嘻仙寺控投躬俐石胳棚讶蕾蜕芯贰懈永塑八室臃开刮枉幻眨渝咐瞥烁脓梨傈辅护 佃储众本扛缩表 察刊
计算。 ①合同签订后的 5 天(日历天)为开模时间,乙方在此时间内应将铝材模具准备完毕,确保材料计划提出后能立即投入生产。 ② 用料计划提出后 20 个日历日开始交货, 25 个日历日内将计划内容到货完毕。 ③零星增补的用料计划提出后 20个日历日交货完毕 其他条款 A 投标方对提出的技术要求相应回复如何保证质量及该工程高品质好形象的措施。 B 投标方在实际供货时,招标方有权对所供 铝合金型材
相比传统的店面餐饮服务,如今的网上订餐已不仅仅是需求量在明显增加,其饱满的热衷度也在突飞猛进。 这种高度智能化 的服务不论从消费者的角度出发还是从餐饮业的立场来看,两者都是有很大的发展空间的。 码农毕业设计下载网: 2 国内外研究现状 随着国内外信息化技术的日渐普及,餐饮这样的传统性行业也正在越来越多的采用信息化技术来操纵和管理业务,市场上餐饮管理软件如今正处于百花齐放、百家争鸣的火热阶段。