海洋工程英语词汇word版内容摘要:

lyses|有限元分析 fire alarm siren|火灾警笛 fire and gas detecting system|火灾 可燃气探测系统 fire control panel|消防控制盘 fire damper|防火风闸 fire door closer, fire proof door|防火门 fire extinguishing system|消防系统 fire fighting vessel, fire boat|消防船 fire fighting water, fire water|消防水 fire foam hydrant|消防泡沫栓 fire hose station, hose box|消防箱 fire monitor|消防炮 fire panel|火灾 可燃气报警显示盘 fire proof wall, fire wall|防火墙 fire protected plastic tiles|防火塑料地板 fire protection wall|防火墙 fire pump|消防两用泵 fire station|消防软管箱 fire water deluge system|大水量灭火系统 fire water hose rock|消防水软管 fire water hydrant|消防水栓 fire water jockey pump|消防水增压泵 fire water lift pump|消防水提升泵 fire water pump|消防水泵 fire water, foam monitor|消防炮(水或泡沫) fireman box|消防员箱 first aid kit|急救箱 first coat|底漆 first stage hydrocyclone|一级水力旋流器 first stage separator|一级分离器 fit up|坡口组对 fitter|组装工 fixed crude oil washing machine|固定式原油清洗机 fixed drilling platform|固定式钻井平台 fixed platform|固定式平台 fixed tower SPM|塔系泊 flame arrester|阻火器 flame cutting|火焰切割 flame cutting droplets and debris|火焰切 割形成的熔滴和料头 flame cutting machine|火焰切割机 flame cutting torch|火焰割枪 flammability limits|可燃度极限 flange|翼缘、法兰 flare assembly|火炬总成 flare boom|火炬臂 flare drum|闪蒸罐 flare pilot gas|火炬引燃器 flare scrubber|火炬分液器 flare tower|火炬塔 flat bar|扁钢 flat plate anode|扁阳极 flat welding|平焊 flaw|裂纹 flexible hose|柔性软管 floater controlled valve|浮球控制阀 floating cargo hose|浮式输油软管 floating loading hose|浮式装油软管 floating oil production and storage unit ( FPSU) |浮式生产储油装置 floating oil storage unit|浮式储油装置 floating production platform|浮式生产平台 floating production, storage and off loading tanker|浮式生产储油外输轮 floating state|飘浮状态 floppy disk|软盘 flow chart|流程图 flow indicator ( FI) |流量显示器 flow quantity recorder ( FQ) |累计流量计 flow switch|流量开关 flux|焊药 flux cored arc welding ( FCAW) |药芯焊 flux cored electrode|管状焊条 flux cored wire|药芯焊丝 foam extinguishing system|固定式泡沫灭火系统 foam monitor|泡沫炮 foam station|泡沫站 fog horn, fog signal|雾笛 folding bed|折叠床 folding chair|折叠椅 foot print|(尤指管件的)被交位置 foot valve|底阀 forecastle|艏楼 foreman|领班 fed steel ( FS) |锻钢 fork lift|铲车、叉车 forming|压制成型 forming of plates into tubular|由板卷成管 formula of carbon equivalent|碳当量公式 four way valve|四通阀 fracture toughness|断裂韧性 frame structure|梁格结构 free water knockout vessel|游离水分离器 fresh water pressure vessel|淡水压力罐 fresh water pump|淡水泵 fresh water tank with electric heater|淡 水罐(带加热器) friction coefficient|磨擦系数 fuel gas pressor package|燃气压缩机撬 fuel gas heater|燃料气加热器 fuel gas scrubber|燃气洗涤器 fuel gas treatment package|燃料气处理撬 fuel oil drain tank|燃料油排放罐 fuel pump|燃油泵 full coupling|全螺纹的接头 full peration weld|全熔透焊缝 funnel shaped guide|喇叭口状导向 furnace|熔炉、加热炉 fusible plug|易熔塞 fusion line|熔合线 gantry crane|龙门吊 gap gauge|间隙尺 gas bottle|气瓶 gas cutting|气割 gas cutting machine with magic wheels|磁轮式气割机 gas detector|可燃气体探测器 gas export facility|天然气外输设施 gas injection module|注气组块 gas metal arc welding ( GMAW) |熔化极气体保护焊 gas pore|气孔 gas processing plant|天然气处理厂 gas shielded arc welding|气体保护电弧焊 gas tungsten metal arc welding ( GTAW)|钨极气体保护焊(含氩弧焊) gas turbine generator set|燃气轮发电机组 gas turbine power generator|燃气轮机发电机 gas welding|气焊 gasket|垫圈 gate valve|闸阀 geophysical survey vessel|物探船 girth weld|环缝 global positioning system ( GPS) |全球定位系统 globe valve ( normally closed) |截止阀(常闭) glycerin|甘油 gouging|气刨 graphite crucible|石墨坩埚 grating|格栅 gravity damper|重力风闸 gravity platform|重力式平台 gravity type foundation|重力式基础 grind|打磨 grinding|打磨(名词) grinding machine|砂轮机 grit|石英砂 groove|熔池 groove angle|坡口角 guard filter|保护滤器 guide funnel|导向喇叭口 guide structure|导向结构 gusset|节点板、筋板 guyed tower platform|拉索塔平台 H shape|H 型钢 half nipple|一端带螺纹的接头 halogenated hydrocarbon cylinder|卤化烃瓶 halogenated hydrocarbon fire extinguishing system|卤化烃灭火系统 halogenated hydrocarbon local panel|卤化烃就地控制盘 hammer|锤子 hand operated pump|手动泵 hand winch|手动缆绳车 handrail|栏 杆 hard hat|安全帽 hazardous area|危险区 heat affected zones ( HAZ) |热影响区 heat detector|热探测器 heat exchanger|热交换器 heat medium drain tank|热介质排放罐 heat number|炉号 heat traced pipeline|伴热管线 heat treater|加热器处理器 heat treatment|热处理 heater|加热器 heater treater|热处理器 heater treater feed pump|热处理器供液泵 heating medium boiler package|热介质锅炉撬 heating medium circulating package|热介质 循环撬 heating medium collection tank|热介质收集罐 heating medium diesel daily tank|热介质柴油日用罐 heating medium drain pump|热介质排放泵 heating medium drain tank|热介质排放罐 heating medium expansion vessel|热介质膨胀罐 heating medium make up pump|热介质再启动泵 heating medium oil, thermal oil|传热介质油 heating medium storage tank|热介质油储存罐 heating , ventilation and air conditioning system ( HAV) |采暖、通风、空调系统 heave wall section|厚壁段 heavy can|节点加厚段 heavy wall pipe|厚壁管 helideck|直升机甲板 helmet|安全帽、焊接面罩 hex head bolt|六角头螺栓 high concentration gas alarm|高浓度可燃气报警 high low|错皮 high pressure condensate tank|高压凝析油罐 high pressure flare|高压火炬 high pressure separator ( HP separator)|高压分离器 high strength steel|高强度钢 high, low pressure switch ( PSHL) |高 低压开关 histogram|(统计用)直方图 hold|待定 hold point|(检验的)停点 holiday detector|气孔探测仪 horizontal distance|水平距离 horizontal welding|横焊 hose|软管 hose assembly|软管总成 hose connection|软管接头 hose reel|软管轮 hot dip galvanizing|热浸锌 hot water pressure vessel with electric heater|热水压力罐(带加热器) hot work|明火作业 human life and property|人民生命财产 hydrant|消火栓 hydraulic pile driving hammer|液压打桩锤 hydraulic press|液压机 hydraulic test|水压试验 hydrostatic test|水压试验 hyperbaric diving system = pressurized diving system|高压潜水系统。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。