图像压缩技术的研究及应用开题报告内容摘要:
a 10GB hard drive also can not store a few minutes of video images, it is necessary to press image data. In this paper,we investigate the method that using MATLAB Wavelet Transform for pression. Methods: The image was processed by wavelet transform, and then the information of low frenquency was retained and the information of high frenquency was home zero. Results: The quality of the first image pression was high, but the pression ratio was low. The pression ratio of the second time was higher,and the image quality was good. Conclusion: The method is simple, reliable and effective in image the puter technology and the rapid development of work technology, images, sound and other multimedia information recording, storage, transmission has been digitized, the huge amount of data brought to the storage and transmission of certain difficulties, digital image pression has bee a solution to the problem key technology. Over the last decade ,wavelet theory has bee a new direction in applied mathematics. As a mathematical tool, wavelet was quickly applied to the image and voice of many other fields. Wavelet transform is a signal of time scale analysis method, the characteristics of multiresolution analysis, and in time and frequency domain has the capacity of local signal characteristics, a fixed window size, its shape variable, time window and frequency window can change the timefrequency localization analysis, that low frequency high frequency resolution and time resolution, the high frequency part of the high time resolution and lower frequency resolution very suitable for detection of transient entrainment of the normal signal anomalies and show its ponents, so the microscope known as signal analysis. 2, Image Compression Coding Theory Coding process can be summarized as: Original image Mapping transformation Quantizer Entropy Coder data stream Mapping transformation reduces the correlation between image data, Make it more conducive to pression; Quantizer to map the data into a binary digital signal; Entropy code make that appeared on the probability of a large source of symbols assigned to the short code。 Small symbol on the probability assigned to a long code, there by reducing redundant data generated code. Data pression is divided into lossless and lossy pression. Lossless pression means that image data after pression can be pletely restored, restored the same image and original image, while lossless pression refers to the pressed image data while maintaining the characteristics of the original image under the premise of inevitable loss of part of the original image is not important information. The current image based on wavelet transform press gradually replaced the DCT and the other based on the coding technique, a new image pression international Biaozhun of choice, such as the most advanced image pression standard JPG2020 the core algorithm is wavelet transform. Wavelet Analysis Principles and Methods Wavelet analysis is currently applied mathematics and engineering disciplines in a fastgrowing new field. Wavelet is a small wave, small means it has the Decay。 wave refers to its volatility. With the increasing maturity of wavelet theory, wavelet analysis has bee very broad applications. Image processing is an important area of application of wavelet analysis, image processing has bee a useful tool. principle of wavelet transform image pression Wavelet transform for image pression the basic idea is: multiresolution deposition of the image, broken down into different space, different frequency subimage, and then pairs the image coefficients are encoded. Wavelet transform coefficient coding is the core for image pression, pression is the real coefficient quantization pression. Image after wavelet transform。图像压缩技术的研究及应用开题报告
相关推荐
天然气(含煤层气)项目、建设项目、铀矿等共 7 个部分。 《规程》明确了方案编制内容和格式的一般性要求,并按不同矿种、不同开采方式和不同活动类型土地复垦工作特点,明确了土地复垦方案编制的 7 项行业标准。 TD/ 土地复垦方案编制规程 第 1 部分:通则
人指挥; ( 4)公路上行驶必须遵守道路交通规则;运载易燃、易爆等危险物品时,应遵循有关规定,除必要的随车人员外,不得搭乘其他人员。 自卸汽车 除应遵循上述载重汽车的各条规定外,还应遵循下列规定: ( 1)发动机启动后应检查起翻装置,确保良好;严禁在驾驶室外进行操作,翻斗内严禁载人; (2)当装载高度超过高车厢拦板时,应平稳行驶,不得猛力加速,也不得紧急制动; ( 3)卸料起斗时,
和流量进行观测和记录。 井管使用完毕,井管可用人字桅杆借助钢丝绳、倒链、绞磨或卷扬机将井管徐徐拔出,将滤水井管洗去泥砂后储存备用,所留孔洞用砂砾填实,上部 50cm 深用粘性土填充夯实。 , 深井井点 深井井点降水是在深基坑的周围埋置深于基底的井管,通过设置在井管内的潜水电泵地下水抽出,使地下水位低 于坑底。 本法具有排水量大,降水深 (15m),不受吸程限制,排水效果好;井距大
教学目的和要求。 教学重 难 点: 学会创建文件夹。 教学过程 : 一、新课引入 、电影,这些资料在计算机里是怎样存放的呢。 提示课题 二、新 授 解释文件和文件夹是用来干什么的。 要吧分门别类地将文件放在不同文件夹中。 文件或文件夹的选择 A. 单个文件或文件夹的选择 B. 多个文件或文件夹的选择 讲方法一和方法二 C.选择 多个不连续的文件或文件夹。 重命名文件或文件夹 创建自己的文件夹。
括:工程名称、施工 单位、开工日期、计划竣工日期及施工质量安全负责人。 现场要有醒目的宣传标语、劳动保护标志、宣传教育栏。 各种机械设备上有安全警句和安全标志。 配电设施和闸刀必须全部设箱,有门、锁、防雨措施,护理齐全, 一机一闸,螺丝使用正确,接地保护安全可靠。 现场的计量器具配备齐全,注意保管。 现场库房的搭设应符合要求,库内不进水、不渗水,工具间整洁, 帐物相符。 施工用电线路立杆架设