住宅楼的建筑强电电气设计毕业论文外文翻译内容摘要:
tion principle ( 1) in the schematic design stage can use unit index method。 In the preliminary design and construction drawing design stage, appropriate USES need coefficient method. In this design, the design of each stage are can use unit index method. ( 2) electric equipment sets more, the equipment capacity difference between, appropriate USES need coefficient method, are used for main distribution of load calculation. ( 3) electric equipment sets less, the equipment capacity of difference between the binomial method used in a trunk and distribution board (box) load calculation. This design choose classification posite indicator load calculation. Need to factor: Kd = load curve maximum active load/rated load Need coefficient is a prehensive coefficient, it marks the electric equipment group of putting into operation, from the power supply work practical to use power and electric equipment group equipment power ratio. Civil building is mon need coefficient method. The need to coefficient method, we should first make sure that electric equipment group of plant capacity. Electric equipment nameplate, indicated capacity for rated capacity. The same type of electric equipment into a group, namely electric equipment group. Electric equipment group of total capacity is not necessarily the equipment rated capacity of the direct additive, but must first put their conversion for unified duty under the rated capacity, adding only. After conversion system unified regulation system and the capacity of the set is called equipment capacity, namely for Pc. Need coefficient method of putation formula is as follows: Electric equipment group of active and reactive power and apparent putation load: PkP tc (21) QkQ tc (22) 22 ccc QPS (23) 3380cj SI (24) Need coefficient value is in a certain range according to the statistical method to determine, its accuracy of load calculation has important significance. However, due to many factors, need coefficient table can only be given by the remended value, which requires the designer according to design experience and circumstances to choose a more appropriate value. residential distribution design requirements Residential distribution design must meet the residents39。 safety, convenience and beautiful basic conditions, namely should do the power supply reliability and to ensure that the power supply quality. As far as possible do limit simple and have a certain flexibility。 Ensure safe operation, convenient maintenance. To ensure that the power supply quality and to ensure that the power supply voltage quality and to ensure that the power supply frequency quality. Residential distribution design, first of all to consider residential load levels, household electricity consumption and electricity metering method, then, to determine the distribution system mode, the reasonable choice of line protection appliances. distribution line protection Residential distribution line protection is to prevent personal by electric shock. Avoid personal by electric shock generally has two kinds: one kind is called prevent direct contact with the electric protection, referred to as to prevent direct contact with the protection or prevent borrow shock protection. This refers to the electric Gas lines and equipment under normal working conditions, personal contact machine electric shock caused by the person. Another kind is the room and contact electric protection, referred to as anti indirect contact protection or prevent indirect contact protection. This refers to the electric circuit and equipment can be exposed conductive part, under normal circumstances it is not conductive in fault cases, due to the insulation damage cause electrical equipment can be exposed conductive parts, such as shell charged. When personal touch charged shell, can cause casualties. Used to prevent touch fault cases charged electric circuit and equipment shell, casing or other exposed conductive part can be caused by electrical accident personal protection, called anti indirect shock protection. Residence in the main distribution line protection: short circuit protection, overload protection and grounding protection. Residence in the distribution line protection content, mainly through the inside the building or indoor wiring ark or distribution box of circuit breaker to achieve. When the choice should be paid attention to: 1, to determine the selection of the circuit breaker rated voltage and rated frequency, 2, the rated current should be equal to or greater than the control loop of the maximum working current, but also her under certain conditions of current。 3, should meet cutoff condition of dynamic stability and thermal stability, select the circuit breaker off short circuit current yes onoff ability。 4, should also consider the use of circuit breaker place of external conditions, main consideration electrical equipment installation height and damp environment, if the electrical installation in the special environment, should choose and adapt to the environment of the special electrical. In addition, due to a residential household, household used in lighting and household appliances is residential line final protection object, so, in the determination of the distribution system and the choice of circuit breaker, should as far as possible in a indoor shortcircuit protection, only cut off the fault circuit or indoor function power supply circuit, and do not affect other household normal power supply. Distribution circuit between the superior and the subordinate action time limit should be selective, each part with as much as possible to realize. 3 electric lighting system design electric lighting overview An overview of lighting In the modern residential design, lighting has practical significance, also have。住宅楼的建筑强电电气设计毕业论文外文翻译
相关推荐
业论文 8 师的主要追求。 建筑美学的基本特征就表现在技术与艺术的结合。 因此建筑的艺术属性在国际上早已形成公论。 在欧洲, “ 艺术 ” 或 “ 美术 ” 这一概念向来就包括绘画、雕塑、建筑这三大门类。 建筑具有韵律的美。 它被誉为 “ 石头的史诗 ” 、 “ 凝固的音乐 ” 等等。 歌德对于斯特拉斯堡的吟叹,雨果对于巴黎圣母院的讴歌以及黑格尔、谢林、施莱格尔等美学大师都对建筑的韵味赞美有加。
,转为特许分销商或根据情况经申请转为县级经销商。 3、当月销售额超过15万元时,当月奖励3%;当月销售额超过20万元时,当月奖励5%。 二、县级经销商 零度企划 百度成功 零公里工作室 1、县级经销商(区域独家)首期进货5万元以上,进货价格为零售价的45%;年度销售额不低于50万元。 2、试销期3个月,3个月的总销售额不低于10万元,低于10万元时公司有权取消独家经销权,转为特许分销 商。 3
精车半精车φ29 φ290 φ24 φ240 115(单边)(单边)1140 1150 32(单边)(单边)310 320 5(单边)(单边)60 50 3703700 1).工序005是铣端面和钻中心孔,可采用专用夹具在X53K铣床上加工;2).工序125是粗车、半精车、车螺纹各工序的工步数不多,成批生产,不要求很高的生产率,故选用卧式车床能够满足使用要求,又由于要求的精度较高
意义及其对会计人员 、注册会计师的 影响 和提出的新要求,有必要对两者之间的联系与区别进行具体的分析。 会计准则与会计制度的联系 都属于会计行政法规 我国的会计准则和会计制度都是由国家财政部门根据《中华人民共和国会计法》及国家其他有关法律和法规组织制定和发布实施的,因此它们都是同一层次的部门行政法规,都具有同等的 法律 效力。 都是指导会计工作的 规范 第 2 页 共 8 页
龄小不了几岁的学生心里更是没底。 再加上他们一些同学的不配合,戏谑探究的目光更让我不知所措,语无伦次。 站在六十多人的最前面没有成为主角的兴奋的 感,唯有感到孤独。 因为这边九月底有个省里的联查,所以新学期各个教研组都要有听课、评课的活动。 没几天活动就从我们这些大学生和新入编的教师开始,很郁闷的是我是语文教研组第一个吃螃蟹的人,并且那天才上午告诉我,叫我下午放学后留一个班听我的课。