ahandbookofenglishforoffshoreoildrilling海洋石油钻井常用英语手册内容摘要:
is meters long. 落鱼长度 5. The fish top is at meters. 鱼顶位置 海洋石油钻井常用英语手册 _______________________________________________________________________ 第 11 页 共 46 页 第五节 Coring 取芯 1. Stop drilling for coring. 停钻准备取芯 2. Make up core bit. 接取芯钻头 3. What type of core bit is it? 这是什么 型号的取芯钻头 ? 4. Run in a diamond core bit. 下金刚石取芯钻头 5. Let’s drop the ball for coring. 可以投球取芯 6. The core has been broken off. 岩芯断了 7. Put the core in the boxes. 把岩芯装在岩芯盒里 8. Don’t brake suddenly. 不要猛刹车 9. Take out the core. 岩芯出筒 10. How long is the core? 岩芯多长 11. The core recovery is 98%. 岩芯收获率是 98% 12. Run in the core barrel again. 继续下岩芯筒 (或 : 取芯筒 ) 13. Run in hole core barrel. 下取芯筒 14. Drop ball. 投钢球 15. Recover core. 取出岩芯 16. Use same parameters as for core 1. 使用与 1取芯同样的参数 A Handbook of English for Offshore Oil Drilling _______________________________________________________________________ 第 12 页 共 46 页 第六节 Freeing Stuck Pipe 卡钻与解卡 1. The downhole problems are very plicated. 井下情况很复杂 2. The hole is tight. 遇阻了 3. Overpull while tripping out. 起钻遇卡 (overpull: 超拉力 ) 4. The formation is unstable. 地层不稳定 5. The wall caving is severe. 井壁垮塌严重 6. There are many return cuttings. 返出岩屑特别多 7. The mud returns have decreased. 返出泥浆减少 8. The hole is enlarged. 井眼扩大了 9. The pipe’s stuck. 卡钻了 10. Pull up to 150 tons. 上提 150吨 11. Slack off to 50 tons. 下放至 50吨 12. Ream down all the tight points. 在所有遇阻点进行划眼 13. The rotary table can’t rotate. 转盘转不动 14. Where is the sticking point? 卡点在哪里 15. Make a tensile test. 做拉伸试验 16. Back it off above the free point. 在卡点以上倒扣 17. Where is the backoff position? 脱扣位置在哪 18. Plug the well for side tracking. 打水泥塞侧钻 海洋石油钻井常用英语手册 _______________________________________________________________________ 第 13 页 共 46 页 第七节 Abnormal Well Condition and Well Control异常井况与压井 1. The mud is gas out. 泥浆有气侵 2. The pit has lowered quickly. 泥浆池液面下降很快 3. The hole lost returns. 井口不返泥浆 4. The returns are unstable. 返出泥浆量忽大忽小 5. Where’s the thief zone? 漏失层在哪里 6. Cut down the flow rate. 降低排量 7. Lower the mud density. 降低比重 8. Cut down the hydrostatic pressure. 减少静压 9. The gas smell is strong. 天然气味度很浓 10. There’s some trace of oil. 发现有油花 11. The pump pressure is fluctuating. 泵压不稳 12. It is a zone of abnormal pressure. 这是异常压力层 13. The hole (well) is kicking! 井涌啦 ! 14. Shut in the BOP! 关闭防喷器 15. Sound the general alarm quickly! 快发出综合警报 16. The stand pipe pressure is 10 kg/cm2. 立管压力 10公斤 /厘米 2 17. The casing pressure is 25 kg/cm2. 套压 2510公斤 /厘米 2 18. Fill out the kill sheet. 填写压井记录表 19. Kill the well. 压井 20. There’s a bination of lost returns and the kick. 又喷又漏 , 情况复杂 21. Reverse the gas out of the hole. 反循环排气 22. What’s the lag time? 迟到时间是多少 23. The well is now stable. 现在井眼已经稳定 A Handbook of English for Offshore Oil Drilling _______________________________________________________________________ 第 14 页 共 46 页 第八节 BOP and subsea Equipment 防喷器与水下设备 1. Cut off the 30” conductor. 割掉 30”隔水管 2. Weld on the 30” bottom flange. 焊接 30”法兰 3. Hoist and nipple up 30” diverter. 吊装 30”转喷器 4. Change the 5” pipe rams to 31/2” rams. 把这个 5”闸板换成 31/2” 5. Install blind ram. 安装防喷器的盲板芯子 6. Check the seal ring of the conductor. 检查隔水管密封圈 7. Cut off the lifting eye of the conductor. 切割隔水管耳环 8. Test BOP. 测试防喷器 9. Change annular BOP packing. 更换万能防喷器芯子 10. Full pressure test the ram preventers. 对闸板防喷器进行全压试压 11. Test annular BOP at 2500psi. 万能防喷器试压至 2500psi 12. Check annular pressure. 检查环形空间压力 13. Confirm the angle of the guide base. 确定基板角度 14. The thread is covered with the quickrelease protectors. 已戴好快 卸护丝 15. Establish the guide lines. 装导向绳 16. Connect the TGB running tool. 接临时导向基板送入工具 17. Land the TGB to sea. 下临时导向基板到海底 18. Retrieve the running tool. 退出送入工具 19. Run the BOP and risers. 下防喷器和隔水管 20. Pick up the marine riser. 吊出隔水管 21. Pick up the slip joint. 起伸缩节 22. Adjust the riser tensioners. 调整隔水管张力 23. Function test the diverter system. 对防喷器系统进行功能测试 24. Retrieve the pin connector. 取出销钉连接器 25. Move the BOP to the moonpool door. 将防喷器移到园井甲板的活动门上 26. Run the test plug. 下试压塞 27. Close the upper pipe ram. 关上部钻杆闸板防喷器 28. Open the kill line valve. 开 压井管线阀 29. The pensation capacity is 400000 pounds. 补偿能力是 400千磅 30. The locking load is 1000000 pounds. 锁紧负荷 1000千磅 31. Support the riser. 接隔水管支撑环 32. Remove the hose bundles. 卸下垮接软管 33. Assure the selfcontrolled rotation. 保证自控转动 34. Set the LMRP on the test pump. 将下部防喷器插入 总成座放到试压桩上 35. Connect the flex joint to the riser. 连接隔水管与挠性接头 36. Land the BOP onto the well head. 座防喷器到井口头 37. Run the subsea TV for monitoring. 下水下电视观察 海洋石油钻井常用英语手册 _______________________________________________________________________ 第 15 页 共 46 页 38. Remove all the riser running tools. 取出所有的隔水管送入工具 39. BOP carrier. 防喷器叉车 40. Lower the universal guide frame. 下放万能导向架 41. Paint mark the top 6 meters of 30” conductor white. 在 30”隔水管的顶部6米处用白漆涂上记号 42. Check adequate length for guidelines. 检查导向绳的长度是否足够 43. Move temporary guide base (TGB) into moonpool. 将临时导向基板到园井甲板 44. Test pull to check connection. 试拉检查连接 45. Grease TGB and running tool as required. 按要求给导向基板及下入工具上黄油 46. Test fit TGB and running tool. 用下入工具试临时导向基板连接 47. Check for junk inside shoe joint. 检查浮鞋内有无落物 48. Pick up 30” conductor handling slings and shackles. 吊上下 30”导管的索具和卸扣 49. Is slope indicator properly mounted? 水平仪是否装好 ? 50. Ensure subsea TV is in good condition. 确保水下电视处于良好的状态 51. Place BOP stack on the test pump. 将防喷器组放在试压桩上 52. Check condition of all 30” casing connectors. 检查所有 30”套管接头的情况 53. Replace Orings as required. 按需要 , 更换 O 性密封圈 54. Attach slope i。ahandbookofenglishforoffshoreoildrilling海洋石油钻井常用英语手册
相关推荐
自主完成指定任务的智能网络系统。 无线传感网综合了传感器技术、嵌入式技术、无线通信技术等。 典型的传感网络一般由传感器节点、网关节点、传输网络和远程监控中心四部分构成。 通过各种微型传 感器节点对各种环境信息进行感知检测,经过初步的分析处理之后通过自组多跳的方式传送到汇聚节点,然后将经过嵌入计算模块处理的信息传送到监控中心。 无线传感网作为一种集成了感知、控制盒无线通信的新型的无线网络
020)19 号《关于人防工程易地建设费收费标准的补充通知》、 市价费发 (2020)204 号《转发关于人防工程易地建设费收费标准的补充通知》、市人防函( 2020) 27 号《西安市人民防空办公室关于贯彻执行人防工程建设规定和易地建设 费标准的函》。 建设单位领取《定、验线单》送西安市勘测院定、验线,提交定线成果 3份( 1份原件, 2份复印件);
限度的节省市场推广成本 通过网络进行市场拓展,给产品做广告花费极低,利用商城的宣传作用,带动网店产品的销售,最大限度地节省了网店的推广成本。 小投入大产出 通过网络营销,将产品推广到全世界,吸纳更多的用户订单。 三、 功能简介 商城系统 商城系统的前台 商城系统的前台是网络用户访问访问商城的集中入口,网络用户可以在这里查询商品和网店;网店店主可以在这里发布广告,包括竞价广告、固定广告等等
20石 Ф 10内 绑扎 板制安 地沟盖板 m DN80PVC 排水管安装 (粘接 ) DN80 排水管 m 2 二、足球场 挖土方 运距 7km 三类土 m3 水泥稳定碎 (砾 )石 合料 水泥含 量 8% 厚度 15cm m2 河源市第一、二中学运动场改造及附属配套设施采购招标文件 招标编号: HYJJ2020HG030101 19 人工洒水 粗细改性石油沥青混凝土 青混凝土 粗粒式 60厚
显微镜、 NanoXP 纳米压入仪、超高真空镀膜 /成分及应力分析、划痕仪、压入仪、摩擦磨损仪等分析测试设备。 五、 师资力量 “无机非金属材料工程”专业教学的依托单位新材料研究室和表面工程研究室,师 资水平起点高, 现有教授 11 人(其中博士导师 8 人),副教授 6 人,其中 16 人具有博士学位。 表 2 师资力量 导 师 职 称 研 究 方 向 乔冠军 教授、博导 先进陶瓷及其力学行为