英文版dl5031-1994电力建设施工及验收技术规范管道篇内容摘要:
pipe fittings, pipe accessories and valves General regulations Qualified certificate of manufacturer must be provided for pipes, pipe fittings, pipe accessories and valves, and corresponding indexes should be in concordance with active national or trade technical standards, Specification, material and technical parameter must be checked according to the design requirements prior to the using of any pipe, pipe fitting, pipe accessory and valve. Appearance inspection is required prior to the using of any pipe, pipe fitting, pipe accessory and valve, and the appearance demands are as following: Without any defects such as crack, shrinkage cavity, included slag, adhering sand, folding, missing welding, coldlap and so on。 The surface should be smoothness without any sharp scratches。 Concave depth should not be more than , and the Max. dimension should not be 5% more than the pipe perimeter, and not be more than 40mm, Spectrum reexamining is required and material marks should be made prior to the using of pipes, pipe fittings pipe accessories and valves which made of medium and low alloy steel. Checking of pies Following items must be to determine if they are in ac0dance with active national or trade technical standards prior to the construction of pipes which designing pressure is more than or equal to . Analysis results of chemical position。 Test results of mechanical property (tensile strength, yield strength and ratio of elongation)。 Test results of impact ductility for high pressure alloy steel pipes which wall thickness is more than or equal to 12mm。 Heat treatment condition or metallurgical phase analysis results of alloy steel pipes. Welding seam checking report must be examined prior to the using of seamed pipe which designing pressure is more than MPa. 6 Local defects such as scratches, concave cavities and corrodes on pipe surface should be checked。 pipe wall thickness which had been treated should not be less than the calculation wall thickness of straight pipe, and the checking report must be recorded and submitted. Thickness of no less than 3 cross sections should be measured and checked for medium or low alloy steel pipes which used as high pressure, and the recording is required. Qualified steel pipes should be stored according to their materials and specifications, to avoid corrosion. Checking of pipe fittings Following items must be checked to determine if they are in accordance with active national or trade technical standards prior to the pipe fittings used in the construction of medium or high pressure pipes: Analysis results of chemical position。 Heat treatment condition or metallurgical phase analysis results of alloy steel pipes。 Nondestructive flaw detection results of high pressure pipe fittings. Sealing surface of flange should be smooth and clean without radial groove, and air cavity, crack, burr or other defects that can reduce strength and connecting reliability are forbidden. Flanges with concave/convex surface or concave/convex ring should be snapped naturally, and the height of concave surface should not be less than the depth of notch. Supporting area of connecting bolts on flange end face should be parallel to the junction surface of flange, to insure even force acted on flange end surface when connecting. Dimensions of each part should be checked according to the design drawing and examined to determinate its conformity with flange on device to be connected, to ensure proper connection. Checking of pipe accessories Thread of bolts and nuts should Be undamaged without any defects such as scratches, burrs and etc. and the matching between bolt and nut should be in good condition without loosen or blocking. Each alloy steel bolt, which designing temperature is above 430 oC, and diameter is more than or equal to M30, should be numbered and its hardness should be checked, and unqualified one must not be used. Pad material of flange should be in concordance with the designing requirement. Table A5 in Appendix A can be used to select material in case of no concrete requirement provided. Asbestos rubber pad should be soft and pliant, without any aging or delaminating。 and any defect such as buckle and wrinkle is forbidden on surface. Visual inspection should be made for the surface of metal shim with leveling rule, the good contact is necessary and defects such as crack, burr, rust or coarse processing are not allowed。 and its hardness should be less than the flange39。 s. Radial scratch, loosen and other defects are all not allowed for the cladding metal and winding shim. Assembling dimension and welding type of steel structure of pipe supporting and suspending bracket should be concordance with the regulation of the code . Working surface of sliding bracket should be smooth and move flexibly without any blocking. Spring of pipe supporting and suspending bracket should be checked according to the article and of the code. Checking of valves Following examining is necessary prior to the installation of all types of valves: If padding material is in concordance with the requirement of design, and if padding method is correct or not. Sealing padding material can be selected according to the Table A6 in Appendix A in case of no design requirement provided。 Whether corrosion occurs on the valve stem wherever padding sealing。 If the action of switches are flexible and the indications are all correct。 Obvious manufacturing defect is forbidden on the appearance of casting valve. Tightness checking must be made prior to the installation of valve used as closed circuit element (acting as isolation), to check the tightness of joint surfaces between valve seat and valve core, valve cover and padding chamber. Water pressure, which times more than pressure marked on nameplat。英文版dl5031-1994电力建设施工及验收技术规范管道篇
相关推荐
时。 型腔数目的确定 最经济数目的确定,实质上是注塑件生产成本懂得经济核算,影响最经济型腔的因素 ,有技术参数和经济指标两个方面技术参数有锁模力,最小和最大注塑量,塑化能力,模板尺寸的和流速参数,这里只考虑注射机锁模力和最大注射量两个参数。 技术经济指标是从制品尺寸精度和经济效果考虑,对一模多腔整体嵌入式的注射模,影 响型腔的重要因素有如下四个: 1. 注射剂锁模力 2. 注射剂注射量
1 一、编制说明 (一)编制依据 新建铁路云 (昆明)至桂 (南宁)铁路 YGZQ3标招 标 、投标文件。 2.国家和铁道部现行的技术规范、客运专线暂行规定、规程、技 术指南和验收评定标准。 3.《中华人民共和国安全生产法》、《建设工程安全管理条例》和《铁路工程施工安全技术规程》等工程建设安全生产有关管理规定。 4.近年来铁路、客运专线等类似工程施工经验、施工工法、科技成果 及
ve been talking You have been sleeping since 132 have been to … ( 地方)……去过某过地方 have gone to …(地方) 去了某地还没回来 had better(not) do sth. 最好 (不要)做某事 133 have fun + doing 玩得高兴 134 have sth to do 有什么事要做 eg: I
顾等所有项目,可谓达到无所不保,无所不包的程度。 英国的社会保障覆盖了在英国工作的所有人,其主要内容集中在养老保险、医疗和福利方面,但每一方面的内容繁多,覆盖面广泛,保障水平高。 二是主要体 现公平原则。 为最大程度地增进社会福利,实现收入分配的 “怕累托最优 ”状态,英国的社会保障制度在对两个层次的保障(对所有人提供的基本保障和在这个基础上提供的与收入相联系的保障)水平上
主题: 学生资助 苗圃行动学生资助操作手册 Page 10 12/10/2020 季学期初三年级 7 月资助款在 6 月一起发给受助学生。 发放方式: ⑴ 资助金发放时间要求 :按月 直接发 放给受助学生,由受助学生在《附件五 - 受助学生生活费及学习用品费签收表 》签名。 ( 2) 有条件的学校可举行资助款发放仪式,目的是使民众 更多的 了解 苗圃行动资助计划。 三、所需要的各种材料及相关工作