ehs手册ehsmanual内容摘要:
6 of 40 It is the user’s responsibility to check that this printed document reflects the lasted edition. 无受控章的文件为非受控文件,使用者有责任检查打印的文件为最新版本。 This “Environment, Health and Safety (EHS) Management System Manual” was piled on order of the site management and introduced on June 2020. The management has appointed a Management Representative for the implementation and ongoing development of the EHS Management System (EHSMS). The appointment letter of Management Representative refers to Attachment 4 of this manual. This EHS Management System Manual describes the elements of the environmental health and safety management system (EHSMS) adopted and implemented in China Campus located at 2333 PangJin Road, Wujiang Economic Develop Area, Jiangsu Province, China. It defines the anization, policies, responsibilities and authorities of those who manage, perform and verify works affecting environment, health and safety and the effective implementation of this EHS management system. The EHS Department in consultation with the Management Representative (MR) is responsible for preparing and revising the EHSMS manual and also for making it available in the China Campus EHS WEB page. It is the responsibility of the EHS Department to maintain a list of the distribution of EHSMS Manual. Revisions to the Manual are reviewed by the Management Representative, and approved by GM. The manual will be made available in the China Campus EHS Web page, which is available for all China Campus work users. If printed, document is uncontrolled and it is user’s responsibility to check that the document reflects the latest version. The new revisions will be marked. These revisions will be incorporated in the Change History of the manual and summary of revisions will be notified to the members of the EHS Committee through by the EHS Department. The read message received by EHS to the is the acknowledgement from the members for having received information about the revision to these documents. They are responsible to seek information from China Campus EHS Web page for implementation of EHSMS. In case of Organizational changes with respect to EHS Committee (Cross Function Team) (see Attachments 2 and 3) they have to hand over the manual, relevant records and information on EHSMS to his/her successor and inform the Management Representative or EHS Department about the same. SCOPE ` ****工业设备制造有限公司 Title: 文件名称 环境、职业健康 和 安全管理 体系 手册 EHS Management System Manual Doc 文件编 号 : Rev 版本 号 : 0 Page 页码 : 7 of 40 It is the user’s responsibility to check that this printed document reflects the lasted edition. 无受控章的文件为非受控文件,使用者有责任检查打印的文件为最新版本。 ****(China) Industrial Equipment Manufacturing Co., Ltd. located at*****, China will be covered under the EHSMS. DEFINITIONS CIEM – ****(China) Industrial Equipment Manufacturing Co., Ltd China Campus– ****(China) Industrial Equipment Manufacturing Co., Ltd EHS – Environmental, Health and Safety EHSMS Environmental Health amp。 Safety Management System GM – General Manager EHS MR – EHS Management Representative EPB – Local Environment Protection Bureau General Description China Campus has established an EHSMS, which is designed to meet the ISO 14001:2020 and OHSAS18001:2020 EHSMS standards. The EHSMS implementation ensures that all necessary procedures and work instructions are in place as a necessary documented part of the work process. It ensures that activities and processes consistently conform to standards, necessary records are retained and activities performed to achieve continually improvement. The following are the elements that have been implemented in China Campus to meet the standards. ` ****工业设备制造有限公司 Title: 文件名称 环境、职业健康 和 安全管理 体系 手册 EHS Management System Manual Doc 文件编 号 : Rev 版本 号 : 0 Page 页码 : 8 of 40 It is the user’s responsibility to check that this printed document reflects the lasted edition. 无受控章的文件为非受控文件,使用者有责任检查打印的文件为最新版本。 EHSMS 环境、职业健康和安全方针 China Campus 的环境、职业健康和安全方针应同 IR 总公司的环境、职业健康和安全方针的要求相一致。 该方针由 China Campus 总经理签署。 本手册所附的【环境、职业健康安全方针】根据IR 总公司要求及公司的重大环境因素 /职业健康安全危害来制定 , 旨在实现我公司的环境、职业健康安全目标,持续改善环境、职业健康和安全绩效 /行为。 China Cam。ehs手册ehsmanual
相关推荐
烈求知欲。 四、课程内容与课时分配 序号 教学任务 工作情境 实践项目 参考学时 1 骨髓象检验基础理论 骨髓象检查概述 现代造血理 论 正常血细胞形态学 骨髓象检查方法、报告单填写 项目一、骨髓标本的采集、涂片、瑞氏染色 项目二、骨髓中各系各阶段细胞正常形态识别 项目三、正常骨髓象检查,书写骨髓报告单 理论:10 实践: 7 2 红细胞疾病及其检验 真性红细胞增多症 贫血概述 铁代谢障碍性疾病
点, 的存储空间。 分布式操作系统:分布式操作系统是集群存储的灵魂所在,所有对集群存储的操作都经由分布式操作系统统一调度和分发,分散到集群存储各个存储节点上完成。 使用分布式操作系统带来的好处,就是各个节点之间没有任何区别,没有主次、功能上的区别,所有存储节点功能完全一致,这样才能真正做到性能最优。 而且在全分EMCIsilon 存储测试 ~ 3 ~ 布的系统下,任何一个存储节点出现故障
实验一 MAX+ plusI的使用 1实验二 组合电路设计 4实验三 VHDL的并行语句 6实验四 计数器及时序电路设计 9实验犯谍笔挺兹脑嚏荔敏印足虾椿晨君灌屎土饿毛饺俄 撼背饲转换檬麦予角刷革由唉讨篱收屈遵滚声碍颗辖踊卞西摊仁稼奋饲搜洒蚁狱纳乡皑料赦肥培 ( 9) 延时精确测量。 若要精确测量电路的输入与输出的延时,可选择主菜单MAX+ plusII\timing analyzer。
设单位、施工单位及设备安装单位来往的文件等。 ( 6)、公司下发的各种文件。 ( 7)、工程监理过程照片及录相资料。 (十六)、安全监理制度 工程监理单位和监理工程师应当按法律、法规和工程建设强制性标准实 施监理,并对 建设工程安全生产承担监理责任。 根据《建设工程安全生产管 理条理》,制定如下安全监理制度: 监理人员应强化安全意识,熟悉安全常识。 施工准备阶段的安全监理工作: ( 1)
单 位 检 查 评 定 记 录 监理(建设)单位 验收记录 一 般 项 目 7.管道的支、吊架 条 8.阀门及其他部件的安装 条 9.系统排气阀和排水阀 条 10. PVCU、 PPR 和 PEX 等非金属管道的安装 条 条 11. 管 道 安 装 的 允 许 偏 差 项目 允许偏偏差 实 测 值 坐 标 架空及 地沟 室外 25mm