2215300mw火力发电厂设计电气工程及其自动化毕业论文外文文献内容摘要:

on the construction scale and pletion time, with proposal on the number and capacity of units to be installed. In selecting power plant sites, full consideration shall be given to the outgoing conditions for connection with the grid when the power plants reach the planned capacity. Arrangement of Main Building The main buildings should be arranged in the order of boiler house, coal bunker bay, deaerator bay (or bined coal bunker and deaerator bay) and turbine, and their size should not exceed those of the reference design for main buildings for units of the same category. When it is deemed reasonable after technical and economic justification and according to the actual project conditions, other new forms of arrangement that can control project cost and 7 favorable to operation, maintenance and construction can also be adopted. The parable building volume of main building shall not exceed data of reference design of main buildings for units of the same category. In nonseverely cold regions, boilers should be in open or semiopen arrangement. In areas with severe cold or strong sandstorm, tower type boilers should be tightly enclosed with outer wall boards, and nontower type boilers shall either be tightly enclose with outer wall boards or be arranged indoor according to the equipment features and actual condition of the project. In regions with proper climate conditions, boilers with good sealing can be arranged without top partment and rain shield. Boiler Equipment and Systems The type selection of boiler equipment and technical requirements shall be as specified in “Technical Specification for Coal Fired Power Plant Boiler” SD2681988. The type of the boiler equipment must be suited to the quality characteristics of the coal used and the allowable variation of the coal quality in the current specifications. The physical and chemical tests and analyses of the coal and its ash shall be performed to obtain the normal and abnormal characteristic data of the coal quality. The pressure drop from the superheater outlet of the large capacity boiler to the turbine inlet shall be 5% of the rated inlet steam pressure of the turbine. For the unit with subcritical and below parameters, the rated steam temperature at the superheater outlet shall be 3℃ higher than the rated inlet steam temperature of the turbine. At rated conditions, the pressure drops of the cold reheat steam piping, reheater and hot reheat steam piping shall be %~%. 5%, %~% respectively, of the HP turbine exhaust steam pressure at the operation conditions. The rated steam temperature at the reheater outlet shall be 2℃ higher than the rated inlet steam temperature of the IP turbine. The design of the pulverizing system for boiler bustion and equipment shall be in accordance with the design of the boiler proper and its safety protection monitoring system and shall conform with the specifications is “Antiexplosive Directories of Pulverized Coal Boiler Combustion Chamber of Fossil fuel power plant” DL345. 8 外文文献译文 2 在电力系统保护中自适应继电保护的进步 摘要 在美国 配电系统被认为是存在的最复杂的机器之一。 电气现象,在这样一个复杂的系统,可以造成严重的自我伤害。 这就需要防止损坏保护方案。 直到最近,有一个安全的能力提供动力 和需求之间的差距。 因此,这些保护方案集中在可靠性上允许的断开线,变压器或其它设备隔离发生故障的元件的目的。 而在某些情况下,断开是没有必要的。 另一个极端的可靠性要求安全性。 这方面的可靠性要求仅用于保护预定区域内的故障保护装置的操作。 这里有一个权衡,可靠的保护方案无疑将会防止损坏,很容易出现不必要的操作,这可能会导致级联中断。 安全计划不会不必要的操作,继电器无法正常运行时 ,该系统零件容易出现损坏。 基于微处理器的 继电 计划,重点是可以实现的混合动力可靠性通过自适应中继。 自适应继电保护 介绍保障计划调整设置和 /或系统 当时的条件基础上的操作逻辑。 这些调整可以帮助避免继电器的误动作。 调整可包括,但不限于,事后分析 的 数据记录 了 在整个系统中的通信以及改变继电器的参数。 几个概念 将 被 要讨论 ,其中之一将被实施,以证明新的工具可用的 价 值。 电力系统 历史 配电 在美国 可以追溯到 1882 年 9 月 4 日,托马斯 爱迪生在曼哈顿下城开珍珠街站。 供电范围 约四分之一平方英里,这直流电 ( DC) 系统,主要用于 在 纽约的金融区的 照明。 爱迪生 表明, 来自 中央发电站, 这是 能够高效地提供电力 的。 直流系统的问题是,最终消费者必须位于几英里范围内的发电站。 问题是 ,使用这种类型的分布的低电压导致更高的电流和用于分发的电力线的较严重的损失。 这迫使发电厂小,效率降低,这意味着,只有在人口稠密地区的小型配电系统将是有效的。 在分配系统中的电压保持恒定 , 线中流过的电流 , 取决于 在用 的负载。 与用于分发的电力线相关的损失随 着 通过线路 电流 的平方。 因此 , 如果 电流 通过 两倍线路 , 实际上线路损失 四倍。 当时 , 爱迪生开始实施他的系统,是没有办法轻易改变的电压直流系统。 能够改变分布线 的电压 将允许在传输过程中减少电流 ,这 就 是被开发 中的 交流电系 9 统。 交流允许变压器增加电压所需的传输 , 降低电压水平 , 安 全的为最终消费者使用 ,这大大减少了损失的远距离输送电力。 尼古拉 特斯拉是交流 电 技术及多相分布概念 的先 驱。 配电 、交流和直流系统 的 竞争策略 ,导致 普遍周知的电流的战役。 托马斯 爱迪生 ,拥有直流系统 专利 ,认为交流和与之关联的高电压是不安全的。 然而 ,与此同时 ,乔治西屋是 建设 交流输电线路 绵延 数英里。 这 一点, 连同尼古拉 特斯拉在其他方面的发展 项目的一个电动机的开发 ,导致了交流系统的最终胜利。 交流 电的这一胜利 导致了 在 配电系统我们 今天有 大型发电站在高电压 下 长距离传递能量 ,与原。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。