轴承寿命分析外文翻译内容摘要:
nt minimal degree of damage. The rate of failure propagation is therefore important. If the degree of damage at test termination is consistent among test elements, the only variation between the experimental and theoretical lives is the lag in failure detection. In standard throughhardened bearing steels the failure propagation rate is quite rapid under endurance test conditions, and this is not a major factor, considering the typical dispersion of endurance test data and the degree of confidence obtained from statistical analysis. This may not, however, be the case with other experimental materials or with surfacehardened steels or steels produced by experimental techniques. Care must be used when evaluating these latter results and particularly when paring the experimental lives with those obtained from standard steel lots. The ultimate means of ensuring that an endurance test series was adequately controlled is the conduct of a posttest analysis. This detailed examination of all the tested bearings uses highmagnification optical inspection, highermagnification scanning electron microscopy, metallurgical and dimensional examinations, and chemical evaluations as required. The characteristics of the failures are examined to establish their origins and the residual surface conditions are evaluated for indications of extraneous effects that may have influenced the bearing life. This technique allows the experimenter to ensure that the data are indeed valid. The posttest analysis is, by definition, after the fact. To provide control throughout the test series and to eliminate all questionable areas, the experimenter should conduct a preliminary study whenever a bearing is removed from the test machine. In this portion of the investigation each bearing is examined optically at magnifications up to 30 for indications of improper or outofcontrol test parameters. Examples of the types of indications that can be observed are given 3 in Figs. . 2 .AVOIDING FAILURES The best way to handle bearing failures is to avoid them. This can be done in the selection process by recognizing critical performance characteristics. These include noise, starting and running torque, stiffness, nonrepetitive run out, and radial and axial play. In some applications, these items are so critical that specifying an ABEC level alone is not sufficient. Torque requirements are determined by the lubricant, retainer, raceway quality(roundness cross curvature and surface finish), and whether seals or shields are used. Lubricant viscosity must be selected carefully because inappropriate lubricant, especially in miniature bearings, causes excessive torque. Also, different lubricants have varying noise characteristics that should be matched to the application. For example, greases produce more noise than oil. Nonrepetitive run out(NRR)occurs during rotation as a random eccentricity between the inner and outer races, much like a cam action. NRR can be caused by retainer tolerance or eccentricities of the race ways and balls. Unlike repetitive run out, no pensation can be made for NRR. NRR is reflected in the cost of the bearing. It is mon in the industry to provide different bearing types and grades for specific applications. For example, a bearing with an NRR of less than is used when minimal run out is needed, such as in disk— drive spindle motors. Similarly,machine— tool spindles tolerate only minimal deflections to maintain precision cuts. Consequently, bearings are manufactured with low NRR just for machinetool applications. Contamination is unavoidable in many indus。轴承寿命分析外文翻译
相关推荐
的给定表面,形成连续完整的保护覆盖层,隔离腐蚀介质对基体的作用,达到防腐蚀的目的。 衬里用的橡胶品种主 要有:天然橡胶 (NR)、丁苯橡胶 (SBR)、氯丁橡胶 (CR)、丁基橡胶 (HR)等。 (三 )玻璃钢及衬里 玻璃钢衬里就是将玻璃钢糊制在金属的内表面上,以求对该设备进行防腐蚀保护,通常化工设备用的较多。 (四 )砖板衬里 用耐腐蚀胶泥衬砌耐腐蚀砖板在金属设备的内壁
定期检查、维修、保养记录。 七 、 要求 施工企业按上述内容及标准 施工 至一层模板支撑搭设完毕后,由建筑施工企业和监理企业对照 JGJ5999《建筑施工安全检查标准》和《建筑工程项目施工安全条件审查表》(附四)进行自我验收。 验收合格后,方可向 安监站书面提出《建筑工程项目施工安全条件验收申请》(附五)。 安监站接到申请后
熟化,石灰不能消解过早,否则熟石灰碱性降低,减缓与土的反应,从而降低灰土的强度;所选土种以粘土、亚粘土及轻亚粘土为宜;准确掌握灰土的配合比;施工时,将灰土或三合土混合均与并夯实,使彼此粘结为一体。 粘土等土中含有二氧化硅和氧化铝等酸性氧化物,能与石灰石在长期作用下反应,生成不溶性的水化硅酸钙和水化铝酸钙,使颗粒间的粘结力不断增强,灰土或三合土的强度及耐水性也不断提高。
C、题名 内容提要 桃园 世外桃源 D、废驰 风驰电掣 风声 谈笑风生 下列词语中,只有一个错别字的一组是 A、既使 针贬时弊 纰漏 置若罔闻 B、必竟 唉声叹 气 忸怩 如愿以偿 C、装潢 煮豆燃萁 赈济 流言飞语 D、勇跃 轻歌曼舞 峻工 怡笑大方 下列词语中,有两个错别字的一组是 A、诬告 缜密 矫健 鬼计多端 B、肆业 寒暄 枯躁 卑恭屈膝 C、 目 真 怪 渲染 逋欠 不辨黍麦 D
限的规定适用于小规模纳税人、银行、财务公司、信托投资公司、信用社,以及财政部和国家税务总局规定的其他纳税人。 不能按照固定期限纳税的,可以按次纳税。 17 纳税人以 1个月或者 1个季度为 1个纳税期的,自期满之日起 15日内申报纳税;以 1日、 3日、 5日、 10日或者 15日为 1个纳税期的,自期满之日起 5日内预缴税款,于次月 1日起 15日内申报纳税并结清上月应纳税款。
需要,增设配电接口并负责各自标段内的供电架设配置以及全部供电系统在施工期间的维护维修工作。 增加 .( 7) 海西高速公路网莆永线莆田段 路基土建工程 A A A A A6 标段施工招标项目专用本 (下册 ) 招标文件 — 8 — ( 7)临时供电含线外供电干线设施(含线路增容改造)、线内临时供电设施、变压器申请修建等内容,办理周期长、手续复杂、费用高。 承包人应充分调查