20xx年新编电线电缆行业词汇中英文对照内容摘要:
袋 purse 四层聚酯漆包扁铜电磁线 quadruple polyestercoated rectangular copper mag wire 人造丝包铜线 rayoncovered copper conductor 浇包、铸勺、浇铸桶 pouring ladle 浇包、铸勺、浇铸桶 pouringladle 挤包绝缘电力电缆 power cable with extruded insulation 漆包线漆膜针孔 pinhole of insulation of enamelled wire 油性漆包线漆 plain enamel 平面式绕包头 [纸包头 ] plane lapping head 平面式绕包机 plane type lapping machine 塑料薄膜包线 plastic film covered wire 塑料包覆光纤、塑料包层光纤 plasticclad fiber 聚酰胺漆包线 polyamide enamelled wire 聚酰胺 (酰 )亚胺漆包铜圆线 polyamideimide enamelled round copper wire 聚酰胺 酰亚胺漆包线 polyamideimide enamelled wire 聚酯漆包铜扁线 polyester enamelled rectangular copper wire 聚酯漆包线 polyester enamelled wire 聚酯漆包扁铜电磁线 polyestercoated rectangular copper mag wire 聚酯漆包圆铜电磁线 polyestercoated round copper mag wire 聚酯漆包矩形铜电磁线 polyestercoated square copper mag wire 聚酯玻璃丝包扁铜电磁线 polyesterglassfibercovered rectangular copper mag wire 聚酯玻璃丝包圆铜电磁线 polyesterglassfibercovered round copper mag wire 聚 酯玻璃丝包矩形铜电磁线 polyesterglassfibercovered square copper mag wire 聚酰亚胺漆包铜扁线 polyesterimide enamelled rectangular copper wire 聚酰亚胺漆包铝圆线 polyesterimide enamelled round aluminium wire 聚酰亚胺 /聚酰胺复合漆包铝圆线 polyesterimide enamelled round aluminium wire overcoated with polyamide 聚酰亚胺漆包铜圆线 polyesterimide enamelled round copper wire 聚酰亚胺 /聚酰胺复合漆包铜圆线 polyesterimide enamelled round copper wire overcoated with polyamide 聚酰亚胺漆包线 polyesterimide enamelled wire 聚酰亚胺 /聚酰胺复合漆包铝圆线 polyesterimide overcoated with polyamideimide enamelled round aluminium wire 聚酰亚胺 /聚酰胺复合漆包铜圆线 polyesterimide overcoated with polyamideimide enamelled round coper wire 字形绕包聚乙烯护套 polyethylene sheath of figure8 formation 聚酰亚胺漆包铜扁线 polyimide enamelled rectangular copper wire 聚酰亚胺漆包铜圆线 polyimide enamelled round copper wire 聚酰亚胺漆包线 polyimide enamelled wire 聚合物包层光纤 polymerclad fiber 聚硅氧烷包层光纤 polysiloxane cladding fiber 聚砜及聚缩醛漆包线 polysulfone and polyacetalcoated wire 聚氨酯漆包线 polyurethane enamelled wire 聚氨酯漆包圆铜电磁线 polyurethanecoated round copper mag wire 聚氨酯 尼龙丝包圆铜电磁线 polyurethanenyloncoated round copper mag wire 缩醛漆包铜扁线 polyvinyl acetal enamelled rectangular copper wire 缩醛漆包铝圆线 polyvinyl acetal enamelled round aluminium wire 缩醛漆包铜圆线 polyvinyl acetal enamelled round copper wire 缩醛漆包 线 polyvinyl formal enamelled wire 高强度缩醛漆包铜圆线 polyvinylformal enamelled round copper wire with high mechanical properties 缩醛漆包线 polyvinylacetal enamelled wire 包装 packaging 包装等级 packaging level 包装机 packaging machine 包装用线盘 packaging reel 包装标准 packaging standard 包装箱 packingcase 纸包机 papare covering machine 纸包扁铜绕组线 paper covered rectangular copper winding wire) 纸包扁线 paper covered rectangular wire 纸包圆线 paper covered round wire 纸包头 paper covering head 纸包机 paper covering machine 纸包头 paper lapper 纸 (带绕 )包 paper lapping 纸包纱包联合机 paper lapping and cotton covering machine 纸包头 paper lapping head 纸包机 paper lapping machine 纸包工序 paper lapping operation 纸带 (绕包 )绝缘 paper ribbon insulation 纸带 (绕包 )绝缘 paper tape insulating 纸包 paper taping 纸包机 paper taping machine 纸包头 paper wrapping head 纸铝箔纵包机 paperaluminiumfoil applicator 漆包纸绝缘电缆 [电磁线 ] papercore enamelled type cable 纸包铜线 papercovered copper conductor 纸包扁铜电磁线 papercovered rectangular copper mag wire 纸包圆铜电磁线 papercovered round copper mag wire 纸包矩 形铜电磁线 papercovered square copper mag wire 纸包线 papercovered wire 纸绝缘铅包的 paperinsulated lead covered 纸包头 papper lapper 无磁性漆包线 nonmagic enamelled wire 非组合包套 nonintegral jacket 漆包层数 number of enamel coats 缺陷数、 (漆包线 )、针孔数 number of faults 尼龙丝包圆铜 电磁线 nylonfibercovered round copper mag wire 油基漆、油性漆包线漆 oilbase enamel 油性漆包线 oleo resinous enamelled wire 油性漆包线 oleoresin enamelled wire 油树脂漆、油性漆包线漆 oleoresinous enamel 油树脂漆、油性漆包线漆 oleoresinous varnish 疏绕、间隙绕包 open lapping 正反向绕包、正反向绞合 oppositedirection lapping 松包光纤光缆 optical fiber cable with fibers loosely packaged 紧包光纤光缆 optical fiber cable with fibers tightly packaged 挤包实体绝缘多芯电缆 multicore cable for extruded solid insulation 多头同心包带机 multiple head concentric taping machine (漆包机的 )导轮组 multiple sheave 镍包铜线、镀镍铜线 nickel coated copper conductor 镀镍铜线、镍包铜线 nickelclad copper wire 镀镍铜线、镍包铜线 nickelcoated copper wire 镀镍铜包钢线 nickelcoated copperclad steel wire 包层不圆度 noncircularity of cladding 用金属包 metal 金属包覆导体 metal clad conductor 金属包覆层 metal cover layer 金属包层 metal covering 金属包层芳族聚酰胺纤维 metalclad aramid fiber 金属包覆电缆 metalclad cable 金属包覆导体 metalclad conductor 卷边纵包金属护套布线电缆 metalclad wiring cable 金属包带 metallic cover tape 改性聚酯漆包铜圆线 modified polyester enamelled round copper wire 低损耗 FEP 包 层石英光纤 low loss FEPclad silica fiber 行李、皮箱、皮包 luggage 电磁线、漆包线 mag wire 匹配包层光纤 matched cladding fiber 月牙板式钢带绕包头 linktype tape wrapping head 单层纸 simplex paper 单层滚筒七头拉线机 single deck 7 heads type machine 单层环氧漆包圆铜电磁线 single epoxycoated round copper mag wire 单层金属编织机 single tier type wire braiding machine 单层的 singlelayer 单层电缆 singlelayer cable 单层绞线 singlelayer strand 单层纸包圆铜电磁线 singlepapercovered round copper mag wire 单层纸 singleply paper 单层纸 singlewire paper 单层 monolayer 钢带铠装电缆 tape armoured cable 钢带铠装 steel tape armour 钢带铠装电缆 steel tape armoured cable 钢带铠装 steel tape armouring 钢带铠装机 steel tape armouring machine 钢带铠装电缆 steeltape armoured cable 铅包钢带铠装、铅套加钢铠装 .(leadsheath,steeltaped) 铅包钢带铠装、铅套加钢带铠装 leadsheath,steeltaped 内钢带铠装电缆 internal steeltape armoured cable 双钢带铠装 double tape armour 双层钢带铠装 double layer of steeltape armour(.) 涂层钢带铠装电缆 coated steel tape armoured 钢带铠装电缆 bandarmoured cable 单螺杆挤出机 single screw extruder 焦烧、早期硫化 (挤出机筒内 ) scorching(in extruder cylinder) 螺杆式挤出机 screw extruder 半导体材料挤出机 semic。20xx年新编电线电缆行业词汇中英文对照
相关推荐
霹刮菇畜押减求碧唉孜拔绿解弟瓜吠鼓予兆匙思卞蓄诉妖演喳磨描翟侗闪拆蚀盎湃着袖铃裳疤瞎试苹绎喊劣佬殊数段收寥氏奠辱蹿赔棵艘好奖懊兹 第十五条 绿化、照明、交通工程质量检查要点 … ..80xx集团市政工程质量监督、控制要点及考核管理办法目录总则编制目的 ……………………………………. .4 基本原则 ………………………………………4 适用范围 ……………………………………. .4 质量监督
( 2)阿拉伯数字应一个一个地写,不得连笔写。 ( 3)所有以元为单位的阿拉伯数字,除表示单价等情况外,一律填写到角分;无角分的,角位和分位可写 “00” ;有角无分的,分位应写 “0” ,代替。 4.各种原始凭证的填制应当及时,并按规定的程序及时送交财会部门,由财会部门加以审核,并据以填制记账凭证。 5.各种原始凭证不能随意涂改、刮擦、挖补。 在凭证填写错误需要更改时
................................................................................................. 117 第 四 卷 ...........................................................................................
ssional, t echnical m and under t he cor ect leader ship, bot h f rom an overall perspective, emphasis on int egrit y, and ear nest ly implem ent t he relevant laws and r egulations, st rict ly act
,每超耗1m3开挖量按照 300 元 /m3 对 二衬 班组进行处罚;对每节余 1m3开挖量按照 300元 /m3 对 二衬 班组进行奖励。 局部 因地质原因 等各种客观原因造成超挖、砼超耗 ,架子队需提供地质素描、原因说明、相应围 岩照片等资料报“项目部开挖控制领导小组” ,经 同意 后核减一定的方量。 ( 2)项目部对架子队管理人员月度考核 ①根据架子队上报的隧道超欠挖断面图、超欠挖计算表
安装横撑龙骨,水平调正固定后,进行中间质量验收检查,待设备及电气配管的安装,全部该做的隐蔽工程完成后并由甲方验收后方可封板。 ( 4)轻钢龙骨顶棚骨架施工,先高后低 ,主龙骨间距和吊杆间距一般控制在800 ㎜~ 1000 ㎜之间,吊顶次龙骨间距为 300 ㎜,横撑龙骨的间距为 600 ㎜,吊杆直径为 8 ㎜,吊杆应垂直吊挂,旋紧双面丝扣,外露铁件必须刷二度防锈漆