电信信令报告_实习总结_总结汇报_实用文档内容摘要:
ER RESPONSE CLOSE REQUEST OPEN CONFIRM Routing Info Response ( 1) MAP OPEN REQUEST:在两个 MAP 业务用户之间建立 MAP 对话 _________________________________________________________________ | ******** | MAP_OpenReqEvent 10001011 00000000 | Dialog ID: 0x008B (对话 ID) 00000000 | Invoke ID: 0x00 (调用 ID) 00000001 | Network ID: 0x01 (网络 ID) 00000101 | Application context value: locInfoRetrieval (0x05)(应用关系值) 00000011 | Application context version: version3 (0x03)(应用关系版本) ******** | Serve Reference (业务参考) 00000001 | module: 0x01 (模块号: 0x01) 00010100 00000000 | Office: 0x0014 (局号: 0x0014) ******** | Sequence number: 0x00001CC9(序号) 00000001 | PdTi indicator: 0x01 00110000 | PdTi value: 0x30 ******** | Destination address (目的地址) 0 | Reserved for national use: 0x00 (保留作国际用途) 0 | Routing indicator: Route on GT (0x00)(路由标记) 0100 | Global title indicator: global title includes translation type, numbering plan, encoding scheme and nature of address indicator (0x04) (全局码指示符) 1 | SSN indicator: 0x01 (子系统号码) 0 | Point code indicator: 0x00(点编码标记) ******** | Signalling point code: 00 00 00 (Hex)(信令点编码) 00000110 | Subsystem number: HLR (Home Location Register) (0x06) (子系统号码:归属地寄存器) ******** | Global Title 4 ( GT4) 00000000 | Translation type: 0x00(转换类型) 0001 | Numbering plan: ISDN/telephony numbering plan (Remendations and ) (0x01) (编号计划) 0001 | Encoding Scheme: BCD, odd number of digits (0x01) (编码方案) 0 | free: 0x00 0000100 | Nature of Address Indicator: international number (0x04) (地址属性:网络号码) ******** | Global title address information: 8618802090002FFFFFFFFF (全局码地址消息) ******** | Destination reference: Reserved (22 Bytes)(目的地参考) 00000001 | Originating address flag: 0x01(源地址标记) ******** | Originating address (源地址) 0 | Reserved for national use: 0x00(保留作国际用途) 0 | Routing indicator: Route on GT (0x00)(路由指示符) 0100 | Global title indicator: global title includes translation type, numbering plan, encoding scheme and nature of address indicator (0x04)(全局码指示符) 1 | SSN indicator: 0x01 (子系统号码) 0 | Point code indicator: 0x00(点编码标记) ******** | Signalling point code: 00 00 00 (Hex)(信令点编码) 00001000 | Subsystem number: MSC (Mobile Switching Centre) (0x08) (子系统号码:移动交换中心) ******** | Global Title 4 ( GT4) 00000000 | Translation type: 0x00(转换类型) 0001 | Numbering plan: ISDN/telephony numbering plan (Remendations and ) (0x01) (编号计划) 0010 | Encoding Scheme: BCD, even number of digits (0x02) (编码方案) 0 | free: 0x00 0000100 | Nature of Address Indicator: international number (0x04) (地址属性:网络号码) ******** | Global title address information: 8618802020FFFFFFFFFFFF (全局码地址消息) ******** | Originating reference: Reserved (22 Bytes)(起源地参考) 00000000 | emptyNumFg: 0x00 00000000 | Net id: 0x00 (网号) ******** | Specific information: Reserved (33 Bytes)(特殊信息) __________________|______________________________________________ 0000000000h: 8B 00 00 01 05 03 01 14 00 C9 1C 00 00 01 30 12 0000000010h: 00 00 00 06 00 11 04 68 81 08 02 09 00 F2 FF FF 0000000020h: FF FF 00 00 00 00 00 00 00 00 00 00 00 00 00 00 0000000030h: 00 00 00 00 00 00 00 00 01 12 00 00 00 08 00 12 0000000040h: 04 68 81 08 02 10 FF FF FF FF FF FF 00 00 00 00 0000000050h: 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 0000000060h: 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 0000000070h: 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 00 0000000080h: 00 00 00 00 00 ( 2) Send Routing Info Request:发送路由信息请求 _________________________________________________________________ | ******** | MAP_Send_Routing_Information Request 10001011 00000000 | Dialog ID: 0x008B (对话 ID) 00000001 | Invoke ID: 0x01 (调用 ID) 00010110 | OpCode: 0x16 (操作码) 00000000 | LinkIdFg: 0x00 (链接 ID标记) 00000000 | LinkId: 0x00 (链接 ID) 00000000 | Message Segment: 0x00(信息段) 00000000 | Last Message: 0x00 (最终信息) 00100111 00000000 | BuffLen: 0x0027 (缓冲器长度) ******** | SendRoutingInfoArg (发送路由信息暗语) ******** | MSISDN 10010001 | ISDN Address Attribute( ISDN地址属性) 1 | extension: no extension (0x01)(附加属性) 001 | nature of address indicator: international number (0x01) (地址属性:网络号码) 0001 | numbering plan indicator: ISDN/Telephony Numbering Plan (0x01) (编号计划) ******** | ISDN String:8618802090002F( ISDN串) ********。电信信令报告_实习总结_总结汇报_实用文档
相关推荐
制度》及《安全操作规程》,将安全管理、安全工作规范化、制度化。 (2) 每周四车间工段长、技术员、班组长进行“自查自纠”,其目的在于将不安全因素及时发现、及时处理。 在检查中所发现的安全隐患落实到人,必须在规定期限内完成。 (3) 公司实施每周星期五“5S”活动,由不同工序、不同车间人员组成的“5S”检查领导小组,对车间所有设备、工艺指标、卫生等影响安全生产的因素逐一排查
Kbit/s不受限的数字信息属于下面哪种业务。 ( 1分) A. 分组交换承载业务 B. 电路交换承载业务 C. 帧方式承载业务 D. 以上都不是 正确答案: B 24. 在我国 U口的接口码型是( )。 ( 1分) A. 2B+D B. AMI C. HDB3 D. 2B1Q 正确答案: D 25. 1993年,欧洲电信标准化组织 ETSI颁布了 V5接口标准,作为本地交换机和( )之间的接口
户、商业大客户和战略大客户服务计划成本。 对服务成本指标进行管理,可进行查询、修改、增加、删除等操作; 服务成本预算与核算 预算服务成本; 对成本进行核算; 统计分析服务成本。 服务成本统计:按性质分,有走访成本、亲情服务成本、优惠成本;按客 户类别分,有集团大客户、重要大客户、商业大客户和战略大 客户成本;按大客户经理统计。 本模块工作量的统计均取自大客户经理工作日志的数据。 XX
~ 65 田埂 (坎 )制作 平原区 田埂 现有标准 内容规定 根据稻田田埂的设计标准,引用现有标准内容为《土地开发整理项目规划设计规范》( TD/T10122020)中的 梯田田坎设计。 梯田田坎设计 TD/T10122020 梯田田坎设计原则 a)安全稳定。 b)占地少。 c)用工省。 d)因地制宜选用田坎材料。 梯田设计要素 梯田田面宽 B,田坎外侧坡度α,原地面坡度θ,田坎高 H(见图
场指挥中心 辖区市 政府联防联控协调机制 市卫生局 机场 CD C 注: 接上页,续下页 通报 飞机所属航空公司 通知 通知 安排转运车分别将 对飞机和转运车辆、隔离室、留观室进行终末消毒 症状者送隔离室 密切接触者送留观室 其他乘客送专用通道进行检疫 甲型 H 1 N1 流感疫情处置流程图 ( 辖区市政府联防联控协调机制 ) 国际航班 机场 辖区市 政府 联防联控 协调机制 报告 省
全部使用和不使用的灵活配置;对深加工转出进行标示。 调拨管理 在库房间调拨物料,生产车间内调拨在线多余原料、在加工厂间调拨在线多余原料。 审批生效过后记录库存流水账或在线流水账。 计量单位 建立计量单位,在相关计量单位之间建立度量衡关系。 物料 档案 建立企业的物料资料,支持多图片。 可以对本厂物料和加工物料进行分别管理,并对报税物料和非保税物料进行标示,设置多个领发料计量单位