混凝土工程质量检试验计划inspectionandtestingplanforconcreteworkquality内容摘要:
nspection record for rebar fabrication and inspection, Request for acceptance inspection of xxxxxx material. 6 Steel Rebar Connection Type, specification, quantity and location of rebar of longitudinal tension application。 Rebar connecting method, location, quantity, and percentage of connecting area etc.。 type, specification, quantity, spacing of hoop reinforcement and lateral reinforcement。 specification, quantity and location of embedded items/ ponent. Visual Check, inspect with ruler, check quality certificate, mechanical property test report of the connections, etc. C X X Record of construction inspection (general application), rebar connection testing report. 7 Steel Rebar Acceptance Inspection Type, specification, quantity and location of rebar of longitudinal tension application。 Rebar connection method, Connector location, quantity, and percentage of connecting area, etc.。 Type, specification, quantity, spacing of hoop and lateral reinforcement。 specification, quantity and location of embedded items/ ponent. Visual Check, inspect with ruler, B X X X Divisional/subdivisional work inspection record。 xxxxxx inspection record. Batch acceptance inspection record for rebar installation, Request for acceptance inspection of xxxxxx material。 Work coverup inspection record. 8 Formplate Configuration Formplate and its support should meet the construction load with enough carrying capacity as per the engineering to the actual application。 Rigidity and stability should meet the requirement. Review contractor’s construction proposal B X X X Form of Request for Review/Approval of Construction Organization Plan 9 Formplate Erection Per construction requirement, isolating agent should not contaminate rebar and concrete interface, no mortar leaking in the formplate joint, arch camber should follow design requirement, no miss of precast holes in formplate, installation deviation should meet code request. Visual inspection, ruler metering, level gauging or pull wire ruler inspection. C X X Construction inspection record (for general application) 10 Formplate acceptance inspection Per construction requirement, isolating agent should not contaminate rebar and concrete interface, no mortar leaking in the formplate joint, arch camber should follow design requirement, no miss of precast holes in formplate, installation deviation should meet code request. Visual inspection, ruler metering, level gauging or pull wire ruler inspection. B X X X Divisional/subdivisional work inspection record。 preinspection record。 formplate erection acceptance batch inspection record。 Form of acceptance batch inspection on precast ponents of formplate. 11 Concrete Agitation (Readymix concrete transportation) Document for ining material and inspection, engineering document on mixing proportion meet code requirement。 deviation of material for each weight meet engineering requirement. Material testing report and calculation sheet of total content of chloride and alkali。 material quality certificate。 water quality testing report。 mixing proportion engineering document。 raw material weighing. B X X X Application of concrete pour。 verification document for concrete mixing proportion, shipping notification of premixed concrete。 notification of mixing proportion. 12 Concrete Pouring Concrete strength grade meets design requirement。 keep testing coupon as per required。 Total time period for shipping, pouring and time interval should not exceed the initial setting time of concrete。 Curing measures should be taken timely as per the technical proposal and Code requirement upon pletion of each pour. Check the construction record and the coupon strength test report. B X X X Application of concrete pour。 verification document for concrete mixing proportion, shipping notification of premixed concrete, notification of mixing proportion. 13 Witness Sampling of Concrete In accordance with local requirement Witness the sampling, and delivering to laboratory in a reliable manner. B X X X Witness record 14 Treatment of Concrete Construction Joint Define the construction joint as per engineering requirement and the construction technical proposal. Carryout the joint treatment as per the construction technical proposal. Observe and check the construction record C X Divisional/subdivisional work inspection record。 preinspection record。 Request for acceptance inspection of xxxxxx material 15 Formplate Removal Deforming strength meets the engineering and code requirement。 carryout deforming and its support as per the sequence stipulated in the construction technical proposal. Check the co。混凝土工程质量检试验计划inspectionandtestingplanforconcreteworkquality
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。
用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。