注塑模具使用手册内容摘要:
Core slides action order:the first( )return。 then ( )return。 at last( )retuen 行位复位动作: □在合模前完成; □在合模后进行; Cavity slides action: before mold closed after mold closed □前模( )组行位,在复位时,有动作次序要求:先( )复位,后( )复位;最后( )复位; The order of cavity slides return: the first( )return, then( )return。 at last( )return。 10 手册内容 三.模具维护保养 Operation and Maintenance A. 使用 模具注意事项 Operation notice: 检查注塑机的各项技术参数设定是否正常; Check the molding parameters were set properly. 装模前将注塑台(炮筒)后退; Retract the injection unit before mold mounting. 调整注塑机动定模板间间距,使其大于模厚; Adjust the distance between the platens: It must be larger than the mold thickness 按模具上向上标志“ ↑ ”所示,吊起模具放入动定模板之间,使模具的法兰先导入注塑机定模板上的定位孔中,再闭合机板,使模具紧贴于两机板之间。 Lift the mold with arrow sign“ ” upward and set it between the platens. Insert the locating ring into center hole of the fixed platen. 模 具侧边同机板侧边平行,用压板及螺丝固定模具于注塑机动定模板上。 Before clamping the mold onto both platens, ensure that the mold is not tilted side way. 锁模块后,进行开模、合模、试合模力,逐步调整锁模位置,逐渐升高锁模力并使连杆能够伸直。 严禁在闭模状态下增大锁模力,以免损坏模具。 Always check that P/L straps are removed before opening the mold. Check the clamping pressure by opening and closing the mold, increase the platen daylight slowly till the link rods fully extend. Never increase clamping pressure while mold is closed, else molding machine will be severely damaged. 11 手册内容 三.模具维护保养 Operation and Maintenance a) 依《模具资料》调节注 塑机顶出杆行程,使其恰当顶出产品。 Adjust the ejector stroke according to “Mold Date Sheet” and make sure the parts can be ejected properly. b) 依运水示意图连接运水。 Connect the cooling system as shown in the cooling diagram c) 依《工艺参数卡》为参照进行调机,直至啤出合格产品。 Adjust the machine settings with reference to “Molding Parameter” till quality parts are obtained. 模具是热唧嘴的,要专业人员来驳线并检查温控箱等是否运行正常。 If hot sprue are used. Operation of the temperature control must be checked. B. 维护保养 落模前,对照末件检查模具; Compare with the last shot and inspect the mold throughly before dismounting. 进行模具的外观检查保养; Inspect the mold’s external appearance and carry out maintenance: 清除模具外表面、分模面、型腔表面、导柱表面、顶针底面上的油污杂物,粉尘及锈斑; Clean up oil stains, dirts and rusts on the external surfaces, parting surfaces and cavity surfaces, guide pins and ejector pins. 严禁用任何硬物,特别是金属物清理模腔杂物; Never use hard objects to brush or scrap the mold cavities; 清理模具冷却水道,使其畅通,且无积水在内; Purge the water channels to free them from water and blockage; 12 手册内容 三.模具维护保养 Operation and Maintenance 进行模具的润滑检查;对模具的相对滑动 部分添加润滑油。 Grease and lubricate all sliding surfaces 进行模具结构件的检查; Check the mold structure. 检查模具的活动部分在动作时是否存在异常响声,各滑动部分运动是否灵活,动作时有无振动及卡死; Check for abnormal noise during movement, ensure sliding action are smooth. There should be no vibration and jamming. 检 查导柱、导套、顶针、滑块等有无严重磨损现象,模具的光、薄、细部位有无缺损、开裂、变形等;检查型腔表面及型芯有无刮花现象,缺陷有无增多,顶针和其它部位有无折断现象; Check for damages, cracks, deformations etc. in polished areas, thin or delicate parts. Check and report any scratches on the surfaces。注塑模具使用手册
相关推荐
面部(不含发际线) 小臂 前发际线 上臂 后发际线 小腿 比基尼 大腿 脐周 后腰 其他 本人是否有以下皮肤问题:是 否 黑色胎记 糖尿病 牛皮癣 湿疹 皮炎 皮肤癌 光敏性皮肤 一、 脱毛中由于个体差异及特异性可能出现的问题及注意事项如下: 1.脱毛时可出现轻微刺痛 红色丘疹周围发红,稍后可自行消退。 2.皮肤较黑者则可能出现水一过性红肿现象,少数会出现水疱 结痂 等,均为正常现象。
胸卡。 10 车 辆 管 理 无车牌 无学校统一制作的车牌车辆进入学校或停放在校内。 5 假车牌 使用非学校统一制作的车牌 10 校内骑车 在校园内骑车,或进入校门未及时下车,或未出校门 提前上车。 5 传达室门卫、宿舍管理员、学生会检查人员、学校教职工 车辆乱停乱放 5 发 式 服 饰 发型不符合要求 24小时内整改到位,补加 5分。 (每月上旬检查) 10 佩戴挂饰、配饰、化妆等 佩戴挂饰
录 . 模具保证 : 1 购置 模温机 (每台注塑机配一台) ,确保模具温度可控制;并精确控制产品 制造 工艺。 购买手持式红外线测温仪,以便随时监测模具温度。 2 寻找适合产品生产的模具温度 .尽力避免生产过程中 产品冷却不均匀,导致应力产生。 3 对结构复杂、产品壁厚不均匀的产品调整冷却时间,保证产品的充分冷却。 (例: B50 自动挡拉臂,提高模温,采取快打快出 ,既降低产品残余应力
............................................................. 208 第四节 国际税收协定 ........................................................................................... 208 第十五章 税收征收管理法 .............
g补 强。 其他的质量 100m kg其 他 则容器的自重为 1 2 9 2 1 1 .3m m m m m m m k g 人筒 封 接 补 强 其 他 试验充满水的质量 2m 由《水的重要物理性质表》得 C。 30 时水的密度为 3/ mkg ,所以2 4 5 . 2 3 9 9 5 . 7 4 5 0 3 5 . 5 1 1m V k g k g