设备通用吊装方案内容摘要:
s selected. The Contractor‘ Rigging Supervisor has final responsibility for all operations. 不需要“绿色吊装检查单” 由吊车司机和现场起重工共同负责确定重物重量和吊车的位置,以使其放置在所选的工 作半径范围内。 吊装 主管 对所有操作负最终责任 Requiring a GREEN LIFT CHECKLIST The Crane Operator and the Qualified Field Rigger are jointly responsible for determining the load weight and placement of the crane so that it is set up within the operating radius 设 备 吊 装 方 案 程序编号 : WPMDA0042 版本 : 1 CNI 23 上海拜耳 MDA 项目部 9 /36 selected. The Qualified Field Rigging is responsible for filling out and signing the GREEN LIFT CHECKLIST. The Contractor‘s Rigging Supervisor has final responsibility for all operations. 需要“绿色吊装检查单的” 由吊车司机和现场起重工共同负责确定重物重量和吊车的位置,以使其放置在所选的工作半径范围内。 起重工负责填写绿色吊装检查单, 承包商的吊装主管对所有的 吊装负最终责任 . Responsible personnel for Mediumsize lift shall be: 中型设备吊装 责任人 Designer: Rigging engineer 设计: 吊装工程师 Checker: Rigging supervisor 检查: 吊装 主管 Reviewer: HSE superintent and Construction superintent 审核: HSE 主管 和施工 主管 Reviewer: Chief engineer on site 审核: 现场总工程师 Approver: Chief engineer on site or site manager 批准: 现场总工程师 或 现场经理 Responsible personnel for Largesize lift shall be: 大型设备吊装 责任人 Designer: Rigging engineer 设计: 吊装工程师 Checker: Rigging supervisor 检查: 吊装 主管 Reviewer: HSE superintent and Construction superintent 审核: HSE 主管和施工主管 Reviewer: Chief engineer on site 审核: 现场总工程师 Review and Comment: TJU ,TTCL and Bayer 审核与注释:监理 , 东洋与 拜耳 Approver: Site Manager or Project Manager 批准 : 现场 经理和项目经理 Note!!! Largersize and Mediumsize require a Crane Lift Permit (See ―Annex 4 设 备 吊 装 方 案 程序编号 : WPMDA0042 版本 : 1 CNI 23 上海拜耳 MDA 项目部 10 /36 Crane Lift Permit‖ of this document) 注意。 大中型设备吊装,需要有吊装作业许可(见本文见 “ 附录 4吊装作业许可” ) Note!!! See Annex 7 ―Rigging Classifications‖ of this document for quick references to lift classifications 注意。 设 要快速参考吊装分类,见本文件附录 7“吊装分类”。 5 Rigging Preparation 吊装准备 Technique Preparation 技术准备 LargerSize lifting 大型设备吊装 It is need to prepare special lifting method statement as the relative specification of SH/T 35152020 for largesize equipment. 大型设备应编制专项的吊装方案。 吊装方案的编制应遵守 SH/T 35152020 相关规定。 For there is no largesize equipment of this project, it is not necessary to describe in details. 由于本工程没有大型设备吊装,所以这里不做赘述 Mediumsize lift 中型设备吊装方案 Mediumsize lift only requires rigging drawing. Rigging drawing (See ―Annex 1 Typical Rigging Plot Plan‖ of this document for an example ) shall be detailed and include the following: 中型设备吊装只要求吊装图。 吊装图 (示例,见本文件“附录 1典型吊装平面布置图) 应该详细, 且 包括以下 内容: A scale plan view showing the locations of lifting equipment, lifted items and their relationship with any potential obstructions。 按比例绘制的平面布置图,示出设备位置和其潜在障碍物之间的关系 A scale elevation view that shows the relationship and clearances between the lifting equipment, lifted items, and potential obstructions。 按比例绘制的立面图,示出吊装设备,吊装项目及 其潜在的障碍物之间的关系及距离 Total weight to be lifted including load blocks and rigging gear。 包括吊钩和吊索具后的吊装重物的总重量 Lifting and tailing hookups in sufficient detail to show all shackle, sling, and spreader bar sizes, length ,capacities and configurations。 详细的吊索具连接图,示出所有卸 扣、吊索和平衡梁的规格、承载量和配置 A description of the configuration of the cranes indicating manufacturer, model 设 备 吊 装 方 案 程序编号 : WPMDA0042 版本 : 1 CNI 23 上海拜耳 MDA 项目部 11 /36 number, boom length, boom type ,auxiliary counterweights, parts of load line ,jib, length, type, offset, etc。 吊车配置说明,示出制造厂家、型号、吊臂长度、吊臂类型、辅助配重、荷载绳部件、辅臂、长度、类型和 偏差等 Crane capacities based on the actual working radii and the crane configuration。 基于实际工作半径和吊车配置的吊车 额定 起重量 A description of the placement of crane mats, lead men, guy lines, earth fill, or any other item required for safe execution of the lift。 吊车垫块、回填区域或任何 安全执行吊装所需的其他物项的布置说明 A description of any ―holds‖ that must be placed on existing plant structures or equipment that would interfere with the lift plan。 对可能影响吊装方案的现有装置结构或设备的必须 用 “占用”说明 A detail written description that adequately description any part of the lift not made clear by the drawing。 一份 详细书面说明充分描述图纸未陈述清楚的吊装的 其他 部分的 If necessary, a ―Rigging Interference Drawings‖(See ―Annex 2 Rigging Interference Drawing‖ of this document for an example), showing foundations and equipment that shall be removed or not installed until after a heavy lift operation, shall be required。 如果必要,还应该有一份“吊装干扰图” (示例,见本文件“附录 2吊装干扰图 ),来示出在吊装前需要拆除或吊装作业后才安装的基础和设备等 If crane placement and boom clearance are not critical, a ―Rigging Data Sheet‖ shall be acceptable (See ―Annex 3 Rigging Data Sheet‖ of this document for an example). This data sheet contains all of the elements listed above except the plan and elevation views. The execution of the lift shall not deviate from the rigging plan and specification. 如果吊车布置和吊臂距离不是很关键,一份“吊装数据表”(示例,见本文件“附 录 3吊装数据表)是可以接受的。 此数据表包含除平面图和立体图以外的所有要素 Smallsize lift 小型设备吊装 Requiring a GREEN LIFT CHECKLIST rigging only required GREEN LIFT CHECKLIST 需要绿色检查单的设备吊装只需要绿色吊装检查单 Don‘t requiring a GREEN LIFT CHECKLIST rigging required nothing 不需要 设 备 吊 装 方 案 程序编号 : WPMDA0042 版本 : 1 CNI 23 上海拜耳 MDA 项目部 12 /36 绿色检查单的设备吊装什么也不需要 Personnel Preparation 人员准备 Rigging Personnel 吊装人员 CRANE OPERATOR: A qualified person who is trained and experienced in the used, the capabilities, and all of the functions of a series of cranes, and With qualification certificate for special operation 吊车司机:经过培训,对某一系列吊车的使用有一定经验的合格人员,并持有特殊工种操作证。 QUALIFIED FIELD RIGGER Have training, Onpost qualification certificate for special operation。 合格的现场 起重工 :经过培训,有上岗资格证和特。设备通用吊装方案
相关推荐
对食品的需求的不同,对设施农业的重视程度和生产形式的选择也不尽相同。 我国是人口众多的农业大国,解决食品安全和 “三农”问题始终是十分重要的问题。 在耕地资源、水资源和农业能源相对短缺的条件下,要想保证食品安全,解决“三农”问题,增加农民收入,大力发展设施农业,实行农业高度集约化经营,应是我国农业发展道路的战略性选择之一。 同时发展有中国特色的设施农业是我国农业的战略性任务。 (一)
2020 届服装设计 专业毕业设计作品汇报演出在迎宾大道校区体育馆隆重上演,共展示了 180套休闲服饰,并由 27 位中外专业模特倾情演绎,学生获得了宝贵的实战锻炼机会,对推动服装教学改革、实施“卓越工程师培养计划”有着重要的现实意义。 此外学院还印制了精美的毕业设计作品集,对宣传我院的教学水平和教学质量起到了促进作用。 毕业设计环节的成功对促进学院专业教学质量的提高产生积极的作用。 四
行 100 K县支行 50 三、活动内容 在活动期间,合作双方将在以下方面提供优惠: 〈一〉 XX 证券提供以下优惠 XX 证券为工行营销发展的新增有效客户提供最大优惠开立沪深证券账户、短信服务、理财讲座、投资分析等方面的服务。 XX 证券及各县营业网点对工行合作营销的新增有效客户在佣金费率方面提供优惠支持。 (保证不高于其他券商费率水 平) XX
标准以表格的形式对点 检对象设备进行了 “五定 ” 点检标准的主要内容包括: 点检部位、点检项目、点检内容;点检方法、设备点检状态;点检结果的判断基准;点检周期;点检分工。 点检标准的主要内容 (1)点检部位与项目 设备可能发生故障和劣化并且需按点检管理的地方。 基大分类为 “部位 ”,小分类为 “项目 ” 点检标准的主要内容 (2)点检内容 点检内容主要包括以下十大要素;
电阻、触点电阻自动测试 ; 不带保持线圈电磁接触器的吸合电压、释放电压、吸合延时时间、释放延时时间、线圈电阻、触点电阻自动测试 ; 电空接触器的吸合电压、释放电压、吸合风压、释放风压、吸合延时时间、释放延时时间、线圈电阻、触点电阻自动测试 ; 完成内燃机车差动继电器、过流继电器、接地继电器、空转继电器、制动过流继电器吸合电流及释放电流,线圈电阻、触点电阻自动测试。 ⑱ 完成内燃机车中间继电器