海洋工程单词内容摘要:

ce | tank | ,构连舱 | | frame | angle | bow | plate | bow | | (指水下防雷的突出部分 ) | shell | test | cargo carrier | Marine (or ocean) engineering Words    船舶 海洋工程 英汉名词简编 第 10 页 共 93 页 船舶 海洋工程 英汉名词简编 第 10 页  共 93 页 Marine (or ocean) engineering Words cargo ship | carrier | | coaming | deck | floor | plan | recess | stiffener | | freeing port | plating | rail | | bulkhead | capacity | coal | oil | scuttle | | ,浮筒 | curve | tank | apparatus | ,救生器材 mine | | cavitation | | loss | of bearing metal | | system | | | joint | ,对接 weld | | line | (船体 ) C | 室 de luxe | plan | store | 用品库 | ,电缆 chain | layer | laying ship |n. length | (600呎 ,185,2米 ) ship | tank | mast | | | | | (热单位 ) | | follower | | ,梁拱 curve | ,梁拱曲线 of beam | Marine (or ocean) engineering Words    船舶 海洋工程 英汉名词简编 第 11 页 共 93 页 船舶 海洋工程 英汉名词简编 第 11 页  共 93 页 Marine (or ocean) engineering Words ratio | table | way | | | | dock | | ,轻舟 frame | beam | crane | end load | | | curve | plan | ship | | | | room store | (军舰 ) 39。 s bridge | ferry | arc air gouging | arc welding | equivalent | steel | and game room | | batten | (货舱 ) block | 车 boom | carrying capacity |n. deadweight | deck | derrick | door | elevator | handling | handling test | hatch | hold | hook | | plan | port | ,装货门 pump | space | storage factor | tank | tonnage | winch | wire | | | (载 )运 ,车辆 | ,载体 effect | | of propeller in metal patten | | davit | fall | Marine (or ocean) engineering Words    船舶 海洋工程 英汉名词简编 第 12 页 共 93 页 船舶 海洋工程 英汉名词简编 第 12 页  共 93 页 Marine (or ocean) engineering Words | 体船 | protection | | (铆钉缝 ) | criterion | number | tunnel | light | | ,电池 ,元件 method of assembling | double bottom | | wash | | ,漂心 block for shafting alignment | board | division | (散装货船 ) girder | ,主龙筋 (双底 ) keel | (单底 ) keelson | (单底 ) line | line bulkhead | line strip on berth | of buoyancy | of gravity | of gyration | ,环动中心 of immersion | ,浸水部分形心 of lateral resistance | of oscillation | of pressure | spot squaring method | | of moving parts | of shaft by indicators | 轴系校中 of shaft by light | of shaft by ruler and gauge |系校中 of shafting | of shafting by calculation method |校中 of shafting by direct connection |校中 of shafting by loading method |校中 or rotor | of berth | plane | | of floatation | casting of propeller | force | moment | pump | | flux | | of load line | of ship39。 s nationality | plate | | ,锚链 cable | Marine (or ocean) engineering Words    船舶 海洋工程 英汉名词简编 第 13 页 共 93 页 船舶 海洋工程 英汉名词简编 第 13 页  共 93 页 Marine (or ocean) engineering Words controller | drive | intermittent fillet weld | intermittent weld | link | locker | pipe | stopper | Trough | |n. well | of trim | of curvature | | ,海峡 bar | plate | | | ,电荷 equipment | house | room | table | of axial clearance | of dynamic balance of rotor | of play between piston and cylinder cover |余隙 of propeller pitch | of reference center line | of the tappet clearance | plate | ,花钢板 arrangement | of bearing clearance with lead | of propeller pitch | of surface in contact by marking pound |色油法 analysis | carrier | cleaning | | (产 )品 engineer | officer | steward | ,膳务长 Ofshore platform Engineering Corporation |n.(COPECO)中国海洋石油工业总公司 State Shipbuilding Corporation |n.(CSSC)中国船舶工业总公司 | ,颔线 | ,导缆钩 | ,团体 test | shear | spline | section | ,弓形剖面 cracking test |n环形镶块抗裂试验 . | theory | weld | | ,分类 dimensions | society | surveyor | deck | hawse slip | Marine (or ocean) engineering Words    船舶 海洋工程 英汉名词简编 第 14 页 共 93 页 船舶 海洋工程 英汉名词简编 第 14 页  共 93 页 Marine (or ocean) engineering Words water stern | | ,羊角 bow | ,曲线型艏 stem | ,曲线型艏 shelter decker | | welding | bunker | port | ,装煤门 scuttle | | ,围槛 angle | plate | submarine | submarine | | electrode | ,覆层焊条 | contrary rotating propeller | washer | | room | oil | | ,密码 ,暗码 ,符号 flag | | of expansion | of fi。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。