步进式加热炉技术附件内容摘要:
.............................................................................................. m/s Drive motor unit power驱动马达功率 ................................................................... KW Mainly characteristics for each roller handling units are: 每组功能区段辊道主要参数如下: ITEM 编号 Roller table frame length (mm) 辊道长度 Number of rollers (Pcs) 辊子数量 Approximate pitch (mm) 辊子近似间距 A1 6480 7 1080 A2 12020 12 1080 A3 12840 13 1080 A4 12020 12 1080 A5 12840 13 1080 A6 12020 12 1080 A7 12840 13 1080 A8 12020 12 1080 A fixed stopper is provided at the end of the roller table A8. Each roller handling units will be control by Variable Frequency Devices (VFD). 辊道 A8末端设有终端挡板。 各段装料辊道采用分组变频调速控制。 Final characteristics will be decided by parties during basic 方讨论确定。 The slab meant to be charged into furnace is prepositioned on the slab charging table. The charging machine pushes the slab forward for squaring it perpendicular to the furnace longitudinal axis. The charging operation itself is described under point – charging machine. 准备装入到加热炉的板坯先在装料辊道上预定位,然后装钢机向前推动板坯,以使板坯与炉子轴线垂直。 这个装料操作将在下面的装钢机一节中具体描述。 Charging machine 装钢机 Description 描述 Please refer to drawing 17 3027 A 0120 4 P 0001 Charging machine 参见图纸 17 3027A01204P0001 装钢机 Charging machines in front of the furnaces 1,2 and 3 are same. The type of machine we are proposing is based on equipment we have already supplied to other customers. 三座炉子的装钢机相同,这种结构型式的装钢机,已经成功的在其它项目中得到应用。 It consist in built transfer car, which made of a braced type horizontal rectangular shape / D – HANDAN ANNEX 2 Section A / 6 structure equipped with idle wheels at each corner and running at the front on 2 rails laid on beams fixed on the civil work and at the back inside a U profile fixed to the civil work on the ground. 它由一个带托臂的活动台车和两组固定轨道构成。 台车是一种带支撑的牢固的平行四边形框架结构,前部两边配备 2 个从动轮,从动轮在分别固 定于基础上的 2 条轨道上运动;后部两边也配备 2个从动轮,这组从动轮在分别固定于基础上的 2个 U型结构轨道上运动。 On the car are hinged 4 fingers which front part are nearly horizontal. Rotating axis of each finger is around one horizontal shaft placed perpendicular to the axis of the furnace. The rotation movement of the fingers, which function is to lift or lay down the product to be handled, is through hydraulic cylinders placed at the rear part of the fingers in a nearly vertical position. The lifting of the fingers is carried out by actuator hydraulically synchronised. Each actuator is used for 1 fingers. Each finger includes supporting plates bolted to the finger. 在台车框架上铰接有 4 个托臂,托臂接触板坯的部分几乎是水平的。 每个托臂的旋转轴线都在与炉子轴线垂直的一个水平面上,托臂的旋转运动完成板坯的提升或下降功能,它通过位于托臂后部几乎与之垂直的液压缸完成。 每 1 个托臂的运动由一个液压缸驱动。 每个托臂包括锚固在托臂上的支撑底板。 The lifting position control of the fingers is made through limit switches or proximity switches and linear transducer. 托 臂的提升位置控制通过限位开关 /或接近开关及线形位移传感器完成。 When handling one product for a single row charging in the furnace, 4 fingers of both parts are lifted together. When handling one product for a double rows charging in the furnace, 2 fingers of each parts are operated independently and only fingers of the part holding a product is operated. 当单排装料时, 4 个托臂同时提升。 当双排装料时,两侧各 2 个托臂分别操作,只有装坯料的 2个托臂有抬起动作,另 2个托臂处于下位。 Drive, forward or backward of transfer car is through two rack and pinion drives placed on the sides of the car. The two pinions of car are connected through a speed reducer to one single electrical motor placed either at the side or in the middle of the frame. The position control is made through encoder. 台车框架的向前、向后运动是通过放置于两侧的两个齿轮齿条驱动的,齿轮通过万向节连至电机驱动的减速器 , 电机 减速机单元位于框架的侧面或中间。 台车 框架的定位控制, 由编码器完成。 The machine should be able, in exceptional circumstances to withdraw a product from the furnace. This would only be done under manual mode under the responsibility of the operator. 在特殊情况下,装钢机能将板坯从炉内取出。 这种功能只能由操作者手动完成。 The machine is designed for the heaviest slab (40 tons) and the individual overloading on each arm due to the dimension tolerances of the slab is taken into account. 装钢机按提升最重的板坯( 40 吨)设计,并考虑到板坯的尺寸公差所带来的单个装钢臂的超载能力。 The lubrication of the bearings is connected to the central greasing station. The lubrication of the pinion and rack is manual and the regularly control is described in the / D – HANDAN ANNEX 2 Section A / 7 maintenance manual. 除齿轮齿条及轨道采用人工手动润滑外,其余运动部位采用集中润滑。 Main characteristics主要特性参数 Number of lifting fingers提升托臂数量 ............................................................................ 4 Finger steel grade托臂材质 .................................................................................... Q345B Finger thickness about 托臂厚度大约 ..................................................................... 100mm Arm supporting plates steel grade 托臂支撑钢板材质 ......................................... Cr18Ni8 Total lifting stroke最大提升行程 ............................................................................ 220mm Lifting drive unit提升驱动 单元 ........................................................................... 4 Cylinder Total transfer stroke about 最大平移行程大约 ................................................... 4,230 mm Transfer Speed平移速度 ........................................................................... max. 600 mm/s Transfer drive unit 平移驱动 单元 ........................................................... 1 Electrical motor Reducer tooth 减速机齿面 ................................................................................... Hard face Drive motor unit power驱动电机功率 ...................................................................... 90 kW Cycletime of the charging machine 装钢机运行周期 ...................................... 41 seconds Description of positioning and charging operation 定位和装料操作描述 The positioning a。步进式加热炉技术附件
相关推荐
木模 板,楞木 50 100 间距 500,垫梁 50 100 间距 800,钢管支撑间距 1000,水平拉杆 1800 配一道。 施工操作 要点: 施工前,应对有关操作人员进行培训及技术安全交底,并进行试组装,明确具体的操作顺序及步骤,明确质量标准及各项具体要求。 .14 . 安装前,模板、楞木等逐件检查,只有符合质量标准及要求的才能使用。 安装时,管理人员必须在场
据电流变化控制进尺或发现钻杆摇晃或难钻时,放慢进尺,防止桩孔偏斜、钻杆位移、钻具损坏等。 根据钻机塔身上的进尺标记,成孔到达设计深度,停止钻进。 ( 5)灌注及拔管:钻孔至设计桩底标高后,停止钻进。 通过砼运输车把混合料输送至钻杆芯 管内,钻杆芯管充满混合料后开始灌注,边灌注边拔管,每根桩的投料量应不少于设计灌注量。 钻杆采用静止提拔,泵送量应与拔管速度相配合且拔管连续
五、 屋比屋智能影音设计小组 向您展示您即将拥有的完美家庭影院整 体方案。 分为:环境声学处理方案及建筑美学装修方案。 (在不影响环境声学处理方案的前提下,与您进一步探讨视听室的装饰风格)。 六、方案实施( 屋比屋 委派给您的项目经理将为您解决过程中的一切事宜)。 七、完成整体方案后,调试的过程我们将会准备:信号测试碟、信号发生器、万用表、阻抗表、相位仪、参考级耳机、频谱分析仪。
( 10 分) 广告媒体宣传费用控制不好,超标 扣 35 分 促销信息(如快讯、 POP 等)费用过高 扣 35 分 促销赠品预算不准,造成赠品积压 扣 35 分 考核人签名: 日期: 步步高商业连锁有限责任公司 编号 BBG/RS11 发布 日期 文件名称 门店员工绩效考核方案 版次 11 页码 12/23 附表 7 门店行政助理月度考核表 姓名: 门店: 岗位: 考核时段: 总得分: 考核
就是永恒价值优势 设计优势,就是生活质量优势 景观优势,就是生命健康优势 管理优势,就是生活品味优势 空中华尔兹: 自然而来的气质,华尔兹的生活等级 享受,没有不可逾越的极限 所谓完美的习惯,是舒适空间的 心情定格。 临江花园: 经典生活品质 风景中的舞台 美林别墅: 源欧美经典 纯自然空间 住原味别墅 赏园林艺术 淡雅 怡景 温馨 自然 钱江时代: 核心时代,核心生活 核心位置 创意空间