石油英语实用手册内容摘要:
m is intended to protect he senenvironment from poilution due to direct dischargeof drainge. 排放系统可避免直接排放引起的海洋环境污染。 36. Drain system consist of three system whichare closed drain system, open drain system andsewage disposal system. 排放系统由三部分组成:闭式排放系统、开式排放系统和垃圾处理系统。 37. Closed drain vessel will receives liquid from flare knockout drums emergency condition. 闭式排放罐应急接收来自火炬分液罐的液体。 38. Closed drain system iS not only used to collect oily liquid drainges, but also receive some gasdischarged from safety valve etc. 闭式排放罐系统不仅接收含油排放物,而且还接收来自安全阀等的气体。 39. The sewage is sent to sewage treatment unitor incinerators by gravity flow and treated by chemical processing method. 垃圾靠自重流至垃圾处理装置或焚烧器,用化学方法处理。 40. Flare system is intened to dispose surplus associated gas and natural gas safely. 火炬系统用于将多余的伴生气和天然气安全地进行处理。 41. Gas is burnt down safely from flare tip installed at the top of flare boom. 气体在火炬臂顶部的火炬头上安全地燃烧掉。 42. Fuel gas will flow to flare tip if fuel gas user is suddenly shutdown. 如果燃料气用户突然关断,燃料气将流到火炬头。 43. Heating medium is intended to supply heatsource to equipments and pipings on all platforms. 热介质是平台所有设备和管线的热源。 44. Heating medium in waste heat recovery unitis heat to 220℃,then it will be sent to varioususers. 热介质在废热回收装置中。 加热到 220℃,然后送到各用户。 45. Heating medium expansion vessel must besealed by nitrogen. 热介质膨胀罐必须由氮气密封。 46. If subsea flowline stops for a long time, thecrude in subsea flowline will be cooled and thecrude viscosity raises up. 如果海底输油管长时间停止工作,油管内原油冷却,粘度升高。 47. If crude transfer pump do not restart thesubsea flowline,water injection pump are used forrestart. 如果转输泵不能重新起动海底管线 , 应使用注水泵。 48. In mast instances, the water injection sys tem and production system are shut down for maintenance, but most of the utility system are kept on—line. 在大多数情况下,注水和生产系统的关断是为了维护,而公用系统保持在线操作。 49. Stop the vacuum pump, and then close the 2″ ball valve on nS seal water supply line. 停真空泵,然后关闭泵的密封水供应管线上的 2″球阀。 50. The production system shutdown includesshutdown of the crude handling systems and produced water handling systems. 生产系统的关断包括:原油处理系统和生产污水处理系统的关断。 51. Turn off the power to the electric dehydrators transformers. 切断至电脱水器变压器的电源。 52. Stop the flow of heating medium to theheater treater preheaters by closing the 4″ block valves on the shell—side inlet to the exchangers. 关闭换热器壳程进口上的 4″截止阀,以停止热介质流向处理器予热器。 53. Leave the shell—side outlet block valve of the exchanger open to allow thermal expansion and contraction of the heating medium fluid. 保持换热器壳程出口截止阀处于打开状态,以允许热介质流体的热胀冷缩。 54. Close the block valves for chemical injection at each in injction. 关闭各化学药剂注射点处的截止阀。 55. After all fuel gas users have been switchedto an alternate fuel supply, the fuel gas system canbe shutdown. 所有的燃料气用户转换为替代燃料后 , 燃料气系统就可以关断了 , 56. Open BDV1001 to depressurize the fuelgas system into the flare system. 打井 BDV1001,使燃料气系统泄压,气放至火炬系统。 57. Stop the supply of propane or fuel gas tothe flare pilot and flame front generater. 停止向火炬长明灯和焰锋发生器供丙烷或燃料气。 58. Stop the flow of purger gas to the flareheader by closing 1″ gate valve upstream of thepressure gage. 关闭压力表上的 1″ 闸阀 , 切断液压火炬管汇的吹扫气。 59. All controller and switch setting are shownon the Pamp。 I drawing, operators should beethroughly familiar with these drawings. 所有控制器和开关的设定值都表示在 PLJ图 上,操作者应对这些非常熟悉。 60. Cross check the process variables as shown on local instruments with the values shown in the control room On the control panels. 检查流程变量的现 场仪表指示值,并和中控室内控制盘上的显示值进行比较。 it is necessary to clime the deaerator tower for any reason, note the direction of the wind before proceeding. 如有必要登上脱氧塔 , 此之前一定要注意风向。 62. Check controller setpoints against the val ues show on the Pamp。 I drawings to be sure they are correct. 检验控制盘 (器 )的设定值 , 并确认其值与 PSlI图上的值一致。 63. If the ambient temperature falls below15℃, the line heat tracing systems should be turnedon. 如环境温度降到 15℃,管线的伴热系统将应投入使用。 64. Sample the crude oil flowing to the cargotpnks regularly to ensure the BSamp。 .W content is adequate. 定期在至货油舱的原油管线上取样,以确保 BS 和 W(杂质和水 )含量符合。 65. Check the level of the chemicals in the chemical storage tanks. Refill the tanks as re quired. 检查化学药剂罐中药剂的液位,根据需要向罐内加药。 66. If the pressure drop across the filter exceeds the vendor39。 s remendation, put the standby filter On—Iine and replace the filter elements. 如果滤器两边的压降超过厂家的推荐值,将备用滤器投入使用,脏滤器停止使用,并更换其过滤元件。 67. Check the operation of the firewater systemperiodically tO ensure that it is always in good working order. 定期检查消防水系统,以保证该系统随时处于良好的工作状态。 68. The deoiling tank operation only partially automated and requires special operator attention. 除油舱的操作仅仅是部分自动,因此要求操作者给予特别注意。 69. The waste water pump can be restarted after an adequate level has been eestablished in thedeoiling tank. 除油舱内重新建立合适的液位后 , 污水泵可以重新起动。 70. Normally two of the waste water pumps operate continously and the third pump is a spare. 正常情况下,两台污水泵连续运转,第三台备用。 open the SDV for the deoiling tankentering the fill phase before closing the SDV forthe tank entering the settling phase. 要在关闭进入沉降阶段的除油舱的 SDV之前,先打开进入充填阶段的除油舱的 SDV。 72. If the level is too high, drain the liquidfrom the vessel by opening one of the vessel manualdrain valves. 如果液位过高 , 打开容器的一个手动排放阀排液。 二 . The equipment of storage and loading 储输装置 1 Words and Phrases单词及短语 1. access hatch 甲板舱口 2. access up/ down 甲板上 / 下走道 3. after peak tank 艉尖舱 4. after winch 船尾绞车 5. air releaser 除气器 6. automatic drainer 自。石油英语实用手册
相关推荐
公司 199 李立平 男 四川省西充县鑫力建筑工程有限责任公司 200 杨绍春 男 四川宏扬建筑集团有限公司 附件三 四川省建筑业企业优秀项目经理 名单 序号 姓名 性别 单位 1 张海铭 男 四川中成煤炭建设(集团)有限责任公司 2 黄平 男 四川中成煤炭建设(集团)有限责任公司 3 陈林 男 四川中成煤炭建设(集团)有限责任公司 4 郑尚军 男 四川中成煤炭建设(集团)有限责任公司 5
同志担任,成员由园区规划局、公安分局、经济发展局、 XX 镇安监站相关工作人员 组成,并邀请 XX消防支队领导参加。 加大检查力度,规范危险化学品和易燃易爆物品生产经营活动。 8 月 22 日至 23 日,检查组共检查危险化学品和易燃易爆物品单位 10 家,出动执法检查车次 2 台 /次,出动执法人员 8 人次,下达执法文书 10 份,发现安全隐患 68条。 对检查中发现的问题要求负责人立即整改
+55m 三跨预应力砼变截面连续梁桥,航道通航孔跨度净高、净宽均能满足上述通航要求。 广州市广园东路延长线工程 YA5 标段投标文件 施工组织设计 4 本 工程场地所处的区域位于我国东南沿海地震带的中段。 途经河流主要为东江北干流和仙村涌,路线经过河段顺直,河水受潮水顶托,具一日两涨两落特点,为中等潮汐地带。 主要工程数量 钻孔灌注桩: 干处钻孔桩: C25Ф 桩共长 6553m、 C25Ф
—— 桩径为 850mm 的回旋 钻孔灌注桩基价、截面积; V900、 A900 —— 桩径为 900mm 的回旋钻孔灌注桩基价、截面积。 12 / 81 常用桩径可按下表系数计算。 计算项 目桩径 ( mm) 依据项 目桩径 ( mm) 系数 计算项 目桩径 ( mm) 依据项 目桩径 ( mm) 系数 计算项 目桩径 ( mm) 依据项 目桩径 ( mm) 系数 350 300 950
部所有成员的 安全 奖罚 3. 编制依据 . 《电力建设安全施工管理规定》 、 《电力安全生产工作条例》 4. 定义 一、 造成事故的责任划分 无工作票进行作业和违章作业造成事故,工作许可人负主要责任,工作负责人和事故责任人负直接责任。 若擅自无票工作造成事故,事故责任人负主要和直接责任。 作业前不验电、不接地造成事故,工作负责人负主要责任,工作班组成员负直接责任。
工应分成几个班组连续作业。 施工机具1. 卷扬机和提土桶,用于材料和弃土的垂直运输以及供施工人员上下工作使用。 2. 护壁钢模板。 83. 潜水泵。 4. 鼓风机、空压机和送风管。 5. 镐、锹、土筐等挖运工具, 若遇到硬土或岩石, 尚需风镐、潜孔钻或爆破器材。 6. 插捣工具,用于插捣护壁砼。 7. 应急软爬梯。 8. 照明灯、对讲机、电铃等。 开挖支护施工1.