服装厂生产流程内容摘要:

大的布料 英文: Generally speaking, for thicker fabric 如抓毛布,毛巾布等 英文: such as terry cloth, etc. 规定拉布高度不可超过 6 吋 英文: the stipulated height of spreading can’t be over 6 inches 厚度较薄及弹性较大的布料 英文: For thinner and stronger elasticity cloth 规定拉布高度不可超过 4 吋 英文: the stipulated height of spreading can’t be over 4 inches. 查片、配片 英文: Checking and matching of cutting pieces 为确保能给缝制车间提供 英文: In order to guarantee the accuracy of the measurement 尺寸准确及衫形稳定的裁片 英文: and the stable shape of the cutting pieces 裁剪后的每片裁片均必须 英文: The finished cutting pieces must be inspected 经过查验后才能进入缝制车间 英文: before they go to the sewing workshop. 查片台上必须附有该款的 英文: There must be patterns of the same styles of cutting pieces 每块裁片的纸样 英文: on the checking platform 查片员必须将裁片与纸样相比较 英文: The checkers of the cutting pieces must pare every cutting piece with its pattern 要求裁片的尺寸及形状必须 英文: The required size and the shape must be the same 与 纸样一致方为合格 英文: as that of the pattern. 经查片员查验过的裁片 英文: The checked cutting pieces must be sampled to be checked qualified 必须经过专业 QC 按 英文: through professional QC according to , 抽查合格后方可进入缝制车间 英文: after which they can go to the sewing workshop. 缝制 英文: Sewing 车间缝制采用挂杆式流水线作业方式 英文: Assembly line is adopted in the sewing workshop 流畅的流水线作业有助于 英文: Smooth assembly line helps to 提高工作的积极性 英文: Improve the enthusiasm of the work 使生产制程一目了然 英文: and make the sewing production procedure clear. 减少制程中出现问题的机率 英文: reduce the probability rate that goes wrong in the course of sewing. 流水线的操作由挂片开始 英文: The operation of the assembly line begins with hanging cutting pieces. 挂片员先检查裁片无误后 英文: After the cutting pieces are checked errorless, 将每扎主裁片用挂衣夹挂在 英文: every bundle of main cutting pieces is hung 流水线滑动杆上 英文: on the slide bar of the assembly line 辅料的分配按该扎主裁片的件数配制 英文: The distribution for the accessories depends on the number of the main cutting pieces, 如主麦、洗水麦等 英文: for example, the main label, the washing label, etc. 要求其数量及尺寸一定要与主裁片相配 英 文: They must match the main cutting pieces in quantity and size. 流水线上的衣车是按缝制工序的 英文: The sewing machine。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。