基础护理操作流程-精品完整版内容摘要:
k table and chair Change pillowcas Fold inward quilt end aligning mattress Assist patient to be in a cosy position Take off the soiled midsheet。 brush the plastic sheet and lift on the patient Take off the soiled bottom sheet to the lower shelf of the nursing cart。 brush the mattress。 bespread sheets in order Tray, drugs, apparatus, tourniquet, bolster, fixative bandage, apparatus holder Move holder to bed Prepare articles Check ?interpret Inquire upon defecation ? select vein 被套、带套床刷 Roll the patient to the other side 31 Prepare Standby Bed Tidy up after operation Prepare drugs Prepare for infusion Insert the needle Hang bottle on holder ?vent air in passway Put tourniquet and bolster in place Bind tourniquet ? sterilize skin? vent air again Ask patient to clench fist。 insert Fix apparatus on after being drops Regulate drops。 observe。 document Place bake tourniquet and bolster ? assist patient to be in a cosy position。 explain do’s and don’ts Smooth bed sheets ?dispose the soiled matters ?observe the patient and the drops Check Sterilize bottle closure。 check apparatus Join apparatuses。 shut off the regulator Insert a liitle more while blood present in the passaway Bottom sheet, quiltcover, pillowcase badding, and pillow d Prepare articles 32 Slip on pillocase Take articles to bed Bespread bottom sheet Bespread quilt cover Slip on quilt cover Move away the bedside table Move the chair to bed end。 place articles on the chair 被套、带套床刷 Perform on the chair Stand on right side of the bed。 place the pillow on bed backward the ward’s door Turn over and clean mattress and pad。 place back in order Bespread right part of bottom sheet。 wrap two corners Tuck the middle unwanted part。 bespread the left side Bespread left side to the bed end Shape cover into tubeshape along the bed two sides Bespread right side。 tuck the two ends under the pad Slip on cover to the two ends。 tie up 33 Prepare Anesthesia Bed Move back the bedside table and chair。 check the bed sheets Bottom sheet, quiltcover, pillowcase, two plastic sheets, two midsheets, anesthesia tray, covered bed brush Take articles to bed Make bed Bespread quilt cover Prepare articles Move away the bedside table Move chair to bed end。 place articles on chair Bespread the left side to the bed end Bespread the right part of the bottom sheet。 wrap the two corners Tuck the middle unwanted part Bespread the plastic sheet 4550cm off the bed head on the right Bespread midsheet。 tuck the unwanted part under pad Bespread the other plastic sheet and midsheet over bed head。 tuck unwanted part under the pad Bespread the other side in same order Slip on the cover to bed end。 tie up Turn over and clean mattess ad pad。 place back in order → 平卧薪尝卧薪尝 34 Enema Slip on pillowcase Slip on quilt cover Perform on the chair Place pillow erect on the bed head towards the ward’s door Move back the bedside table and chair。 place the anesthesia tray on the table。 move the chair to the bed end on the side with the quilt Pull down the quilt 15cm。 fold inward the two sides into tubeshape。 fold inward the quilt end along the bed end Fold up 3 times with opening towards the door In the tray: enema bucket, kidneybasin, anal tube, bumf, cotton swab, Vaseline, rubber sheet, rubber napkin, disposable rubber glove Prepare enema solution Take articles to bed Prepare articles Pour 1 2% soap solution or 500 100ml NS into the enema bucket Test the water temperature Articles for preparing the solution: large and smaller measuring cups, warm and cool water, water temperature gauge, gauze, 1 2%soap solution or NS Folding screen, evacution container Hang enema bucket on the infusion holder (4060cm to the anal)。 lubricate the anal tube Place the tray on the table and the evacuation container on the chair Check。 interpret。 close the window and door。 unfold the screen 35 Intravenous Phlebotomizing Tidy up after the operation Prepare for enema Enema Demand the patient to hold on for 510 minutes and then evacuate into the container or in the toilet Take off the rubber sheet and napkin。 smooth the bed sheets。 fold up the screen。 open the window and door Immerse the anal tube in the antiseptic solution Vent air from the tube。 expose the anal。 insert the tube 710cm into the anal Hold the anal in one hand and the other open the clamp Require the patient to take deep breath Finish enema。 clip on the clamp。 take down the enema bucket Get some bumf。 pull out the ananl tube Assist the patient to lie on the left side with the hip along the bed edge Pull the trousers down to the buttock。 bespread the rubber sheet and napkin Injection tray, syringe, hypodermic needle, tourniquet, bolster, blood container Take articles to bed Prepare articles Check。 interpret 平卧薪尝卧薪尝。基础护理操作流程-精品完整版
本资源仅提供20页预览,下载后可查看全文
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。
用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。
相关推荐
基金买卖服务产品销售协议书
回日单位基金资产净值下跌的风险及不能及时收回投资的流动性风险。 ( 2) 申购、赎回价格未知的风险 对于基金单位资产净值在自上一交易日至申购、赎回当日所发生的变化,投资人无法预知,因此投资协议编号: 人面临开放式基金的申购、赎回价格未知的风险。 ( 3) 机构运作风险 开放式基金由多个机构提供各种服务,这些机构的运作存在诸多风险,主要包括:系统运作风险、管理风险和经营风险等。 乙方在此郑重提醒
基础工程设计原理练习题及答案
) 当存在软弱下卧层时,桩基以下硬持力层厚度不宜小于 25. 竖向抗压承载桩,打入式预制方桩、打入式沉管灌注桩、 静压式预制方桩的含筋率大小顺序一般为: (A) 静压式预制方桩 (B) 打入式沉管灌注桩 (C) 打入式沉管灌注桩 (D) 静压式预制方桩 26. 受竖向荷载桩,关于桩端阻力荷载分担大小,越大。 (A) 长径比 l/d越小,桩土相对刚度越大; (B) 长径比 l/d越小
基础土方开挖、破桩头、砌砖胎模、垫层施工方案
在粗凿线标高断裂环上,用钢钎施以外力,将桩头凿断。 说明: 用起重机将断除的桩头混凝土吊离基坑。 步骤图7:吊离桩头说明: 顶面在快要凿到桩头设计标前,要以人工手工细凿找平,达到设计标高后清洗桩头并用塑料布覆盖,避免污染。 步骤图9:清洗桩头桩顶标高承台底标高( 基底标高)钢筋笼主筋10cm手工凿除范围步骤图8:人工修整10cm钢筋笼主筋细凿高程面承台底标高(