办公自动化论文:高校oa系统的公文管理模块的设计和实现内容摘要:

g, and utilizing knowledge management to build a unify office system platform is required. But current OA system products are basically just general products that lack expansibility, and are not patible with the school’s current other systems. So there is a necessity to design an OA system that fits the school article uses the theory of knowledge management as guidance, applying work technology, database technology, data mining technology, and so on, proposes the design scheme of document management module in the OA system. The primary technologies that are adopted include jBPM workflow management system, Struts2 Framework, Spring Framework and Hibernate Framework. The article introduces the overall requirements of the system and selectively。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。