八年级英语新目标下单项选择题专练:总结计划汇报设计纯word可编辑内容摘要:
A. good and good B. well and well C. better and better ( ) was hungry and she stopped something. A. eating B. eats C. to eat D. having ( )’t turn the radio, please. My father is now. A. on, asleep B. on, sleep C. off, sleeping D. off, slept ( ) did Ling Feng make the baby crying? A. stop B. to stopping C. stopping D. to stop ( ) old is this little baby? . A. It is only one little month old B. She is only one months C. He is only one month old D. It’s only one month ( )57. Igot up late. I go to school in a hurry. A. have B. have to C. has D. had to ( ) his pen at home. He wanted to borrow one. A. leave B. left C. fets D. fet ( )’d better your coat you. It’s cold there. A. bring…for B. take…for C. take… with D. bring… with ( ) told him run in the street. It was dangerous. A. doesn’t B. not C. didn’t D. not to ( ) film is interesting, I don’t like it. A. or B. but C. and D. so 4 ( ) that he sang . A. not any more B. not moreC. no more D. no again ( ) you the 100meter race? A. for B. in C. at D. to ( ) Ping dropped his stick. He stopped it. get C. gettingD. gets () won the race?’s100 meter ’’100 meter ( ) was difficult the boy’s relay. A. win B. winning C. to win D. won ( )67.—Who taught to write?—He learnt all by . A. him, him B. his, himself C. his, him D. him, himself ( ) is tall I. A. a little, than B. more, than C. as, as D. so, as ( )69. she swim when she was nine years old? A. Can B. Could C. Can’t D. If ( ) two balls from the top of the building. A. jumped B. dropped C. passed D. fell ( ) and his parents teachers in the same middle school. A. all are B. are all C. both are D. are both ( ) tries to study hard and catch up his classmates. A. to B. on C. in D. with ( ) was very tired but he went on machines. A. mending B. mend C. to mend D. mended ( ) passed the sticks the next runners the same time. A. on, to, in B. on, in, to C. on, to, at D. in, to, at ( ) didn’t Mr. Fat enjoy ?Can you the answer? A. himself, find out B. himself, find C. him, look for D. very much, find out ( )76. —Would you please look out of the window?—Sorry, I do it again. A. don’t…won’t B. not…won’t C. not to…mustn’t D. won’t…can’t ( ) found very difficult to learn English . A. it, good B. that, good C. it, well D. that, well ( ) you from seven to nine this morning? A. did, to B. do, do C. are, doing D. were, doing ( )79. —Why was Tom’s mother angry Tom?—Because he couldn’t pass the math。八年级英语新目标下单项选择题专练:总结计划汇报设计纯word可编辑
相关推荐
编码与解码分辨率: PAL: 176*144( QCIF), 352*288( CIF), 704*288( 2CIF), 528*384( DCIF),704*576( D1); NTSC: 176*120( QCIF), 352*240( CIF), 704*240( 2CIF), 528*320( DCIF),704*480( D1)。 视频输入: 1路( NTSC, PAL
连接 单挂耳机 HCS612/ TCD1(选配 ) 译员单元耳机 TCD2 项目 说明 型号 HCS612 颜色 黑 类型 单边单声道耳机 接头 立体声 阻抗 32Ω177。 10% 频响范围 2020KHz 电压 输入功率 2060mW 失真率 5% 备注:一般每台讨论同传一体机配一只 项目 说明 型号 TCD1 颜色 黑 嵌金属 类型 单边 单声道耳机 接头 立体声 阻抗 40Ω177。
盖全部听众 ( 5) 听众区的声压级应能满足总技术条件要求; ( 6) 各扬声器发出的声音到达听众区各点的时间差应小于 5~30ms。 ( 7) 便于安装、调试和维护。 ( 8) (五 )、系统设计中必须考虑的几个技术参数 包括:传声增益、语言清晰度、最大升压级。 1)传声增益 工程业主也许首先会问扩声系统能开到多响。 用什么技术参数来衡量呢。 这个问题在欧美各国用声音增益来表达( EASE
、鱼的体表: 引导学生用手触摸鱼的体表,较粘滑。 因为鱼体表覆盖鳞片,上有粘液。 鳞片和粘液对鱼的身体有保护作用,粘液可减小游泳时的阻力。 鱼的鳃: 请两位学生配合,轻轻掀开鳃盖,对发现的结构进行描述。 教师重点分析鳃呈鲜红色的原因和鳃的作用。 通过用吸管吸取一些墨汁慢慢滴在鱼口前方的实验观察,使学生掌握鱼的呼吸器官是鳃。 鱼的鳍: 提问:鱼靠什么运动。 请学生找一找鱼的背面
,加强对学生的思想教育,使学生真正认识到做操的重要性和必要性,培养学生重视做操、自觉做操、坚持做操、认真做操的良好习惯。 第二,体育教师要正确运用示范。 示范是体育教学的主要教学方法之 一,通过示范能使学生建立正确的动作表象。 因此,要求教师示范要清楚、准确、规范、优美。 第三,讲解要少而精。 我在广播操教学时的讲解,主要是结合我的示范动作,让 学生加深对动作的理解。 第四,口令要清楚、洪亮
析物理过程。 ⑤运用数学知识分析物理问题能力差,不能根据物理现象作出定性分析。 以下逐题分析答卷中存在的主要问题: 一、填空题:出错比较多是第 5,6,7,8,题,主要原因基础知识不扎实,对课本中要求记忆的内容没有很好的掌握。 二、选择题:学生失分较多是第 12,14,16,题,出错原因,概念理解不清,另外审题不认真。 有一部分同学选项没有看完就选了。 准确率当然不高。 三、实验题 第 24,