先进制造技术的发展里程中英文内容摘要:
igital technology and manufacturing technology of the digital manufacturing technology, the fusion of forming the main content is (1) with QFDCADDDFXVMRPCAMCAE and molding and processing process simulation for the main technical backbone of upstream. (2) by NCNGCCNCDNCFMCPFMCFMSPFMSWeb based manufacturing, drawings, logistics and robot system of digital control technology of downstream. (3) to IGESSTEPERPMRP IIMISPDMTDM, engineering database and the Inter information support for the theme of the manufacturing technology group. The development of AMT 220 precision Precision hand refers to products, parts of the precision requirement increasingly high, On the other hand refers to products, parts and machining precision requirements. Machining precision and development can be divided into the precision machining, fine processing, nano machining, etc. At the beginning of the 20th century, ultraprecision processing error is 10 mu m, has reached LNM, l muon m. The chip manufacturing have socalled microelectronics SanChao (1) antioil, processing workshop dust particles diameter, number of particles l muon m ( m3, (2) ultra pure, chip material, its content detrimental impurities onebillionth of less than, (3) ultra precision machining precision, Dana meters. Obviously, advanced manufacturing technology, have no advanced electronic technology and equipment. The development of AMT focus Extreme refers to the work in extreme conditions or requirements of extreme products, thus also refers to this kind of product manufacturing technology extremely requirements. In high temperature and high pressure, hi gh humidity, strong magic field, strong corrosion under the working conditions, or have high hardness, flexibility, or in such requirements of geometric greatly, small and very thick, thin, grotesque. As industrialized countries of attention to a frontier science and technology microelectromechanical system (MEMS), the information in the field of applied molecular memory chip processing equipment。 , Life in the field of cloning technology, gene operating system, The military weapons precisionguided technology, precision technology, In the field of aerospace plane, miniature satellites, micro nano satellite ( kg), And medical robot, etc. The development of AMT automation In automatic control, automatic adjustment, automatic pensation and auto matic identification to selfstudy, selfanization, maintenance and repair, since the connotation of automatic control and is quite different. In the control theory of the system (Agent theory and method, based on the work control theory, control theory of plex system, etc.), control technology (intelligent detection, multimedia information detection, etc),。先进制造技术的发展里程中英文
相关推荐
磨损的万能上具”。 上件可以进行任意形式的紧密排料或套裁,使原材料得到充分利用。 (2)激光切割的效率高以 lmm厚的铝合金板为例切割速度可达 9 Om/m i n。 高效率使得单件加上成本成儿何级数地降低,甚至低于传统加上方法。 (3)激光切割无需刀具和模具在计算机控制下,可直接实现二维、三维上任意形状的板类和壳体类零件的柔性加上。 特别适用于新产品研制开发阶段的多品种、小批量的饭金类件的加上
季节里,我非常开心能够与新近人员一起度过快乐而充实的四天培训生活,在此期间,我们接受了财政专业知识、廉洁自律、依法行政、礼仪知识等多方面的教育。 对于我来说既是一次业务充电 ,又是一次工作助推,真可谓是 “ 带着问题来,满载成果归 ”。 下面我就根据此次学习培训的内容,谈谈自己在未来如何做好自己的本职工作,成为习主席所说的 “20 字好干部 ”。 一、明确理想信念 黑格尔说: “ 没有理想
组件安装的分项工程划分是按设备 类型进行 的。 本条文 保障组件安装符 合设计要求,阵列 安全、 美观。 布线系统指的是组件间的串并联线缆。 第 2款第 2项 组件抽检报告,是指组件在安装前,按批次抽查 10%,送交第三方 权威鉴定机构检测,出具的检测报告。 第 2款第 4项 光伏阵列组件相邻误差是指相邻两块组件间的误差,是保证组件在同一个平面 、 边框在同一直线 ,直线度可以通过。 第 2款第
传统 数控系统 传统数控系统采用专用的封闭体系结构的数控系统,如 FANUC 0系统、MITSUBISHI M50系统、 Siemens 810系统等。 由于其封闭的硬件软件结构,系统功能的扩展、改变和维修都比较困难,一般须由系统供应商进行。 目前,由于开放体系结构数控系统的发展,传统数控系统的市场正在受到挑战,已逐渐减小。 “PC嵌入 NC”结构的开放式数控系统
预制梁伸出的顶板上层和底板下层钢筋采用单面焊连接;预制梁伸出的其他构造钢筋可用铁丝绑扎。 、 安装预应力束道 为防止预应力筋与管道之间摩擦引起的应力 损失增加及改变预应力筋的受力,应严格控制预应力束道的位置。 束道在两预制梁端与现浇段相接处的位置偏差应控制在 2mm以内。 在现浇段中预埋与预制梁中同种材料的预应力束道(本次施工采用波纹管),须与预制梁段对应束道顺接,确保连接可靠,不漏浆。
其中 N —— 立杆的轴心压力设计值, N = —— 轴心受压立杆的稳定系数 ,由长细比 l0/i 查表得到; i —— 计算立杆的截面回转半径 (cm); i = A —— 立杆净截面面积 (cm2); A = W —— 立杆净截面抵抗矩 (cm3); W = —— 钢管立杆抗压强度计算值 (N/mm2); [f] —— 钢管立杆抗压强度设计值, [f] = ; l0 —— 计算长度 (m);