某家用电器公司0901生产计划控制程序(编辑修改稿)内容摘要:
tion worksheet and issue new production worksheet to live up to the customer39。 s requirements. 编制生产计划的依据 Foundation of the Production Plan Formulation 市场销售部提供的销售计划和发运信息单。 The shipment information notice and the sales plan provided by the Marketing Department 总成材料明细表、生产车间的设备明细、各种消耗定额、零件下料工艺和定额、包装工艺和各种工艺文件,由制造部、工程技术部提供。 The assembly material breakdown, equipment list in the workshop, various consumption rating, parts ingredient process amp。 rating, packing process and all other process documents, which are provided by the Manufacture Engineering Department, Engineering amp。 Technical Department and the Equipment Department 各生产零件的生产工时定额、生产车间和班组人员,制造部提供。 The Manufacture Engineering Department will supply the fixed work hours for the various parts and personnel in the workshop and each work team. 制造部、采购物流部、市场销售部对本部门当月实际完成情况和完成情况的预测,由各部门每月 25日报制造部生产计划员。 The actual acplishment and the forecast for the current month of the Manufacture Engineering Department, the Purchase amp。 Logistics Department and the Marketing Department will be provided to the production planner in the Manufacture Engineering Department by the 25th each month. 每天销售数、交付数和库存结存数清单,每天 9:00完成,由仓库管理员负责。 每月销售计划、销售计划完成、发交计划、发交计划完成和库存结存统计报表,每月 26日由市场销售部负责。 The list of daily sales, delivery and inventory balance will be finished by the warehouse keeper at 9:00 each day. The monthly sales plan, acplishment of sales plan and distribution and submission plans, the statistic summary of the inventory balance will be done by the 26th by the Marketing Department. 编制生产计划的项目和要求 The Items and Requirements for Compiling the Production Plan 编制制造部月度生产作业计划。 Formulation of the Monthly Production Operation Plan for the Manufacture Engineering Department 编制安全库存量。 由生产计划员按 4个月滚动计划编制。 The Formulation of Safety Inventory will be made by the production planner per the fourmonth rolling plan. 月度计划的平衡和调整 The Balance and Readjustment of Monthly Plan 本月 25日下达的月度分日计划,作为各部门为下月工作进行布置任务和实施工作的依据。 The daybased monthly plan will be issued on the 25th in the。某家用电器公司0901生产计划控制程序(编辑修改稿)
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。
用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。