外文翻译--选择最佳工具几何形状和切削条件利用表面粗糙度预测模型端铣内容摘要:
order linear model, developed from the above functional relationship using least squares method, can be represented as follows: Y1 = Y−∈ =b0x0 +b1x1+b2x2+b3x3 +b4x4 (3) where Y1 is the estimated response based on the firstorder equation, Y is the measured surface roughness on a logarithmic scale, x0 = 1 (dummy variable), x1, x2, x3 and x4 are logarithmic transformations of cutting speed, feed rate, radial rake angle and nose radius respectively, ∈ is the experimental error and b values are the estimates of corresponding parameters. The general second order polynomial response is as given below: Y2 = Y−∈ =b0x0 +b1x1+b2x2 +b3x3+b4x4 +b12x1x2 +b23x2x3 +b14x1x4 +b24x2x4 +b13x1x3 +b34x3x4 +b11x21 +b22x22 +b33x23 +b44x24 (4) where Y2 is the estimated response based on the second order equation. The parameters, . b0, b1, b2, b3, b4, b12, b23, b14, etc. are to be estimated by the method of least squares. Validity of the selected model used for optimizing the process parameters has been tested with the help of statistical tests, such as Ftest, chi square test, etc. [10]. Optimization using geic algorithms Most of the researchers have used traditional optimization techniques for solving machining problems. The traditional methods of optimization and search do not fare well over a broad spectrum of problem domains. Traditional techniques are not efficient when the practical search space is too large. These algorithms are not robust. They are inclined to obtain a local optimal solution. Numerous constraints and number of passes make the machining optimization problem more plicated. So, it was decided to employ geic algorithms as an optimization technique. GA e under the class of nontraditional search and optimization techniques. GA are different from traditional optimization techniques in the following ways: work with a coding of the parameter set, not the parameter themselves. search from a population of points and not a single point. use information of fitness function, not derivatives or other auxiliary knowledge. use probabilistic transition rules not deterministic rules. is very likely that the expected GA solution will be the global solution. Geic algorithms (GA) form a class of adaptive heuristics based on principles derived from the dynamics of natural population geics. The searching process simulates the natural evaluation of biological creatures and turns out to be an intelligent exploitation of a random search. The mechanics of a GA is simple, involving copying of binary strings. Simplicity of operation and putational efficiency are the two main attractions of the geic algorithmic approach. The putations are carried out in three stages to get a result in one generation or iteration. The three stages are reproduction, crossover and mutation. In order to use GA to solve any problem, the variable is typically encoded into a string (binary coding) or chromosome structure which represents a possible solution to the given problem. GA begin with a population of strings (individuals) created at random. The fitness of each individual string is evaluated with respect to the given objective function. Then this initial population is operated on by three main operators – reproduction cross over and mutation – to create, hopefully, a better population. Highly fit individuals or solutions are given the opportunity to reproduce by exchanging pieces of their geic information, in the crossover procedure, with other highly fit individuals. This produces new “offspring” solutions, which share some characteristics taken from both the parents. Mutation is often applied after crossover by altering some genes (. bits) in the offspring. The offspring can either replace the whole population (generational approach) or replace less fit individuals (steady state approach). This new population is further evaluated and tested for some termination criteria. The reproductioncross over mutation evaluation cycle is repeated until the termination criteria are met. 4 Experimental details For developing models on the basis of experimental data, careful planning of experimentation is essential. The factors considered for experimentation and analysis were cutting speed, feed rate, radial rake angle and nose radius. Experimental design The design of experimentation has a major affect on the number of experiments needed. Therefore it is essential to have a well designed set of experiments. The range of values of each factor was set at three different levels, namely low, medium and high as shown in Table 1. Based on this, a total number of 81 experiments (full factorial design), each having a bination of different levels of factors, as shown in Table 2, were carried out. The variables were coded by taking into account the capacity and limiting cutting conditions of the milling machine. The coded values of variables, to be used in Eqs. 3 and 4, were obtained from the following transforming equations: where x1 is the coded value of cutting speed (S), x2 is the coded value of the feed rate ( f ), x3 is the coded value of radial rake angle(α ) and x4 is the coded value of nose radius (r). Experimentation A high precision „Rambaudi Rammatic 500‟ CNC milling machine, with a vertical milling head, was used for experimentation. The control system is a CNC FIDIA12 pact. The cutting tools, used for the experimentation, were solid coated carbide end mill cutters of different radial rake angles and nose radii (WIDIA: DIA20 X FL38 X OAL 102 MM). The tools are coated with TiAlN coating. The hardness, density and transverse rupture strength are 1570 HV 30, gm/cm3 and 3800 N/mm2 respectively. AISI 1045 steel specimens of 100 75 mm and 20 mm thickness were used in the present study. All the specimens were annealed, by hold。外文翻译--选择最佳工具几何形状和切削条件利用表面粗糙度预测模型端铣
相关推荐
...........错误 !未定义书签。 . . 校核总传热系数 ..........................................................错误 !未定义书签。 计算管程和壳程的压强降并校核 ....................................错误 !未定义书签。 管程压强降的计算 .........................
年级语文上册教案全 集(全)人教版 思考 :《乡愁》以 _________、 _________、 _________、 _________分别构成四节诗的核心,而这一切无不一层深似一层地揭示出了“乡愁”的底蕴,最难抑、最伤感的“乡愁”,莫过于这“一湾浅浅的海峡”。 作者以 _________、 __________象征祖国,又充分运用了强烈的 ________手法,含蓄、委婉地把
当壳体育 U 型换热管有温差时,不会产生热应力,且 U 型管出现泄露只能将漏管端头堵上,不能更换管子。 填料函式换热设备的特点与浮头式较为相似,结构简单,制造方便,但填料处易泄露。 根据以上对各种类型换热器的经济性分析和结构总结综合考虑选用固定管板式换热设备。 固定管板式换热器的工艺设计计算 确定物理参数 首先 ,根据两种介质的流量,进出口温度、操作压力等算出换热器所需传递的热量。
在这种时代气氛下产生的《维特》,不只述说出了年轻的资产阶级的理想,揭示了它与社会现实之间的矛盾,并让多愁善感、愤世嫉俗的主人公为这理想的破灭而悲伤哭泣,愤而自杀,以示抗议。 维特用自己 的死亡,把自己对当时社会诸种清规戒律的厌恶和反抗推到了极致,从而完成了一个社会叛逆者形象的自我塑造。 很多青 年在《维特》中照见了自己的影子。 《维特》反映了欧洲在法国大革命前夕的社会阶级矛盾的激化
电路图如图所示: 3 图 2 声控控制电路 MIC 接收到足够的声强时,电路产生谐振并输 出一个微弱脉冲,从而将声音信号转换为电信信号。 MIC 输出信号是一个非常微弱的信号,为了后续电路能够对声强信号进行处理,必须加入信号放大电路。 图中所示信号放大电路是由电阻 R1— R T T2和 C1— C3构成,电路中采用了双三极管构成的放大电路,这样可以使电路的放大的倍数比单管当打电路的倍数增加
9 届奥林匹克运动会组织委员会关于第 29 届奥运会会徽的活动策划,在 2020 年举行的第六届中国最佳公共关系案例大赛 中获得“中国杰出公共关系大奖”( 2020- 2020 年度)。 该案例是在精心策划基础上付诸实施的。 会徽发布前, 北京奥组委根据北京在举办大型活动方面取得的经验,聘请国内外大型活动和奥林匹克策划专家,组成核心创意国际团队,就北京奥运会会徽发布方式进行讨论。