汽车零部件中英文对照词典内容摘要:

e ring 半梯形环 half keystone ring 矩形环 rectangular ring 油环 oil control ring 开槽油环 slotted oil control ring 螺旋弹簧加载双坡口油环 coil spring loaded slotted oil control ring 涨环 expander 双坡口油环 double bevelled oil control ring 内上坡口 internal bevel top 内下坡口 internal bevel bottom 边缘坡口油环 bevelledege oil control ring 刮油环 scrapper ring 钩形环 napier ring 镀铬活塞环 chrome plated piston ring 活塞衬环 piston ring expander 活塞环槽 piston ring groove 活塞环区 ring zone 活塞环岸 piston ring land 活塞环内表面 back of ring 曲柄连杆机构 connecting rod 中心曲柄连杆机构 centrallocated connecting rod 偏心曲柄连杆机构 offset connecting rod 铰接曲柄边杆机构 hinged connecting rod 连杆 connecting rod 连杆小头 connecting rod small end 连杆大头 connnecting rod big end 连杆杆身 connecting rod shank 副连杆 slave connecting rod 叉形连杆 forkandblade connecting rod 主连杆 main connecting rod 方形连杆 boxed rod 绞链式连杆 hinged type connecting rod 活节式连 杆 articulated connecting rod 连杆盖 connecting rod cap 连杆轴承 connecting rod bearing 曲轴 crankshaft 整体式曲轴 onepiece crankshaft 组合式曲轴 assembled crankshaft 右侧曲轴 righthand crankshaft 左侧曲轴 lefthand crankshaft 改变行程的曲轴 stroked crankshaft 曲轴前端 crankshaft front end 曲轴主轴颈 crankshaft main journal 轴颈重叠度 shaft journal overlap 圆角 fillet 主轴承 main bearing 曲轴止推轴承 crankshaft thrust bearing 薄臂轴瓦 thin wall bearing shell 曲轴油道 crankshaft oil passage 曲柄 crank 曲柄臂 crank arm 曲柄销 crank pin 轴套 bush 曲柄转角 crank angle 曲柄半径 crank radius 抛油圈 oil slander 角度轮 degree wheel 动平衡机 dynamic balancer 平衡重 balancer weight 扭振减振器 torshional vibration damper 扭振平衡器 torsion balancer 谐振平衡器 harmonic balancer 振动平衡器 vibration balancer 曲轴链轮 crankshaft sprocket 转子轴颈 rotor journal 偏 心轴 eccentric shaft 曲轴箱 crankcase 闭式曲轴箱通风装置 closedcrankcase ventilating system 飞轮 flywheel 飞轮齿圈 flywheel ring gear 飞轮芯棒 cantilever 飞轮芯轴 flywheel spindle 飞轮的惯量矩 flywheel moment of inertia 飞轮标记 flywheel mark 当量系统 equivalent system 当量轴长 equivalent shaft length 一级往复惯性力 reciprocating inertia force,1st order 二级往复贯性力 reciprocating inertia force, 2nd order 离心惯性力 centrifugal inertia force 配气机构 valve gear 凸轮轴 camshaft 凸轮 cam 整体式凸轮轴 onepiece camshaft 组合式凸轮轴 assembled camshaft 凸轮轴驱动机构 camshaft drive 赛车用凸轮轴 race camshaft 凸轮轴轴颈 camshaft bearing journal 凸轮轴轴承 camshaft bearing 凸轮轴偏心轮 camshaft eccentric 凸轮轴链轮 camshaft sprocket 凸轮轴正时齿轮 camshaft timing gear 凸轮轴齿轮 camshaft gear wheel 进口凸轮 inlet cam 排气凸轮 exhaust cam 快升凸轮 quick lift cam 快升缓降凸轮 quick lift gradual clsing cam 凸轮轮廓 cam contour 凸轮包角 cam angle 凸轮升程 camlobe lift 凸轮尖 cam nose 凸轮从动件 cam follower 齿轮传动机构 gear drive 正时齿轮 timing gear 链传动机构 chain drive 链轮 sprocket wheel 链轮盘 chain sprocket 正时链条 timing chain 带齿皮带 toothed timing belt 链条 张紧轮 chain tension gear 半速齿轮 half speed gear 正时齿轮刻印记号 timing gear punch mark 气门 valve 进气过程 intake process 换气过程 gas exchange process 扫气过程 scavenging process 给气比 delivery ratio 分层充气 stratified charge 充量系数 volumetric efficiency 涡流比 swirl rate 进气涡流 intake swirl 螺旋进气道进气 helical duct intake 导流屏式气门进气 masked valve intake 切向进气道进气 tangential duct intake 进气紊流 intake trubulence 进气提前角 intake advance angle 进气持续角 intake duration angle 进气迟后角 intake lag angle 进面值 timearea value 气门升程 valve lift 气门正时 valve timing 扫气口面积 scavenging port area 菌形气门 mashroom valve, poppet valve 钠冷却气门 sodium filled valve(natrium cooled valve) 双气门 dual valve 进气门 intake valve (suction valve,inlet valve) 排气门 exhaust valve 顶置气门 overhead valve 侧置气门 side valve 倾斜气门 inclined overhead valve 直立气门 vertical overhead valve 套筒式滑阀 sleeve valve 气门机构 valve gear 直接式气门驱动机构 direct valve gear 间接式气门驱动机构 indirect valve gear 气门杆 valve stem 加大气门杆 oversize valve stem 气门头 valve head 气门工作面 valve face 气门边限 valve margin 气门弹簧座 valvespring retainer 气门锁片 valve key 气门间隙调节螺钉 valve lash adjusting screw 气门旋转器 valve rotator 气门室 valve cage 气门油封 valve oil seal 气门口 valve port 气门座 valve seat 气门座镶圈(嵌镶式气门座圈) valve seat insert(valve seat ring) 气门座锥角 valve seat angle 气门座宽度 valve seat width 气门挺 杆 valve tappet(valve lifter) 液力挺杆 hydraulic tappet(lifter) 无间隙挺杆 zerorush tappet (nonclearance tappet) 筒形挺杆 barrel type tappet 油压挺杆 ooil tappet 滚轮挺杆 roller tappet(lifter) 挺杆转位 tappet rotation 排气门挺杆 exhaust valve lifter 气门导管 valve guide 气门杆导管 stem guide 气门重叠度 stem overlap 气门开启持续时间 valve duration 气门正时标记 valve timing sign 气门弹簧 valve spring 气门内弹簧 inner valve spring 气门外弹簧 outer valve spring 刚性缓冲弹簧 stiff buffer spring 上紧弹簧 energizing spring 防振气门弹簧 nonsurging spring 弹簧座圈 spring retainer 蝶形弹簧 belleville spring 滚柱 roller 气门室盖 valve chamber cover 摇臂 rocker arm 高升程摇臂 high lift rocker arm 摇臂轴 rocker arm shaft 推杆 pushrod 摇臂支架 rocker arm bracket 气门摇臂室罩 valve rocker chamber cover 导向轮 guide wheel 导杆 slide bar 导轨 slide rail 张紧轮 tensioning wheel 链条张紧调节装置 assembly chain tension adjuster 张紧带轮 tensioning pulley 传动带张紧装置 belt tensioner 同步驱动皮带 synchronous belt 同步驱动皮轮 synchronous belt pulley 供油系 fuel system 控制燃烧系统 controlled bustion system 反湿气装置 antipercolator 电子燃油喷射 electronic fuel injection 蒸气回收装置 vapor recovery system 燃油蒸气回收系统 fuel vapor recovery system 液体回收装置 liquid withdrawal system 恒量净化管 constant purge line 碳罐净化管 canister purge line 供油量 fuel delivery 循环供油量 fuel delivery per cycle 额定供油量 rated fuel delivery 怠速供油量 idling speed fuel delivery 供油规律 fuel supply rate curve 油量调节装置 fuel control unit 供油提前角 fuel supply advance angle 进油计量 inlet metering 几何供油行程 geom。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。