文献检索期末作业报告内容摘要:

为提高国民的生活居住品质 ,解决目前我国在住宅厨卫领域存在的问题 ,在中华人民共和国科学技术部下达的国科发计字 [2020]190 号“关于十一五国家科技支撑计划建筑节能关键研究与示范等项目的批复”的文件中 ,将“厨房卫生间污染控制与环境功能改善技术研究”课题列入十一五国家科技支撑计划项目“城镇人居环境改善与保障关键技术研究”中。 1检索工具名称: 欧洲专利局的专利数据库 【专利】 检索策略: Title=air pollution control and Date=2020 命中结果总数: 17 检索结果列表: TAN FEI。 LI dust absorption and smoke reduction system for prevention and control of air pollution . CN103301703 [P] ― 20200918 摘要: The invention relates to a set of flue dust absorption and smoke reduction system for prevention and control of air pollution. According to a design concept, mainly, an automatic recovery purification miscellaneous drain system is installed at the bottom of a flue 20. The system can purify used water in a sewage collection well 13 into usable reclaimed water. Then by pressurizing a water supply pump 15 and a water supply pipeline 19, the reclaimed water is conveyed to a water injector 7 installed at the top of the flue 20, and the water is jetted in a rotary way to form a water curtain 8. Under the circumstance of not influencing the circulation of gas in the flue, the water curtain 8 adsorbs, sticks, and hangs various tiny particulate matters in the burnt gas. The mixed water (containing the tiny particulate matters) formed by the water curtain is stored in a water tank 9, and is then brought into the purification miscellaneous drain system through a recovery pipeline 2 to undergo water recycling. Thus, the design can greatly reduce the spread of the tiny particulate matters into air from the flue and prevents environmental pollution. To save water, the system is equipped with automatic supply water source devices 12 to 18. 1检索工具名称: EBSCOhost 学术资源 【期 刊】 检索策略: Title= air pollution control or TITLE= air pollution and Date=2020 and LIMITE to Full Text and LIMITE to References Available, Business Source Premier,2020 命中结果总数 43 检索结果列表: Thurber, Mark C.)Platt, Lauren Slaski, AlexanderGupta, Rajesh Miller, Grant , To Promote Adoption of Household Health Technologies, Think Beyond Health[J]. Air pollution Resource Services 2020,24(3). 摘要: Health risks from poor malaria control, unsafe water, and indoor air pollution are responsible for an important share of the global disease burdenand they can be addressed by efficacious household health technologies that have existed for decades. However, coverage rates of these products among populations at risk remain disappointingly low. We conducted a review of the medical and public health literatures and found that health considerations alone are rarely sufficient motivation for households to adopt and use these technologies. In light of these findings, we argue that health education and persuasion campaigns by themselves are unlikely to be adequate. Instead, health policymakers and professionals must understand what users value beyond health and possibly reengineer health technologies with these concerns in mind. Copyright of American Journal of Public Health is the property of American Public Health Association and its content may not be copied or ed to multiple sites or posted to a listserv without the copyright holder39。 s express written permission. However, users may print, download, or articles for individual use. This abstract may be abridged. No warranty is given a。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。