电力英文翻译内容摘要:
M201。 Z equip domestic autotransformers and imported transformers with such devices). Highvoltage 110 – 750kV circuit breakers. The national (allRussian) power work employs over 30,000 circuit breakers rated for from 110 to 750 kV of which % are 110kV breakers, % are 220kV breakers, % are 330kV breakers, 3% are 500kV breakers, and % are 750kV breakers. Over 50% of the installed circuit breakers are tanktype oil switches rated for the voltage of 110 and 220 kV (58% are rated for 110 kV and 45% are rated for 220 kV). From the 1930s to the 1980s tanktype oil switches (MKP and U) have been produced by the Ural233。 lektroapparat Plant and then by the Ural233。 lektrotyazhmash Production Association. Livetank circuit breakers for 110 and 220 kV constitute % of the total number of installed breakers (27% 110Kv and 17% 220kV). These are VMT110 and VMT220 circuit breakers produced by Ural233。 lektrotyazhmash (U201。 TM), MMO110 Bulgarian circuit breakers, and a small number circuit breakers imported from ASEA and other foreign panies. VMT110 and VMT220 breakers are being produced until now. In 2020 they were shipped in an amount of 285 pieces, in 2020 they were shipped in an amount of 320 pieces. The respective numbers of VMT220 breakers are 15 and 30 pieces .The 4 amount of air circuit breakers is equal to % of the total number of installed breakers (12% 110kV, 35% 220kV, and 97% 330 and 500kV). Air breakers of the VVN, VV, VVB, VVD, and VNV series have been produced by the 201。 lektroapparat and Ural233。 lektrotyazhmash Plants. Until 1996 Russian power systems had single SF6 circuit breakers in pilot operation. In 1997 it was decided to equip newly erected and reconditioned 330 and 750kV substations of the RAO ―E201。 S Rossii‖ Co. with SF6 circuit breakers. The number of such breakers increased progressively and now amounts to 4%.SF6 columntype and tanktype circuit breakers are supplied by U201。 TM (primarily 110kV breakers with breaking current of up to 40 kA), by the Power Mechanical Plant (110 and 220kV tanktype breakers), and by foreign producers (ABB, Alstom, Siemens). A considerable part of the oil and air circuit breakers operating in the united national (allRussian) electric work are rated for 110 and 220 kV and have exhausted the specified service life. This is 35% of the total number of breakers in operation. Niy percent of the MKP110 and VVN110 breakers, 40% of the U110 breakers, and 50% of the VVN220 breakers have exhausted their specified service life. The damageability of circuit breakers is determined in terms of the failure flow calculated as the ratio of the total number of all kinds of failure to the total service life of the breakers counted in breakeryears. For domestic highvoltage circuit breakers of the VV series rated for 110 – 220 kV the failure flow parameter is – per year。 for the 500 – 750kV switches it is – per year. According to the data of CIGRE the mean failure flow for 110kV and highervoltage breakers is per year. The worst。电力英文翻译
相关推荐
框等构件构成人机-交互界面,以鼠标、触摸屏、声音选择作为主要输入手段,辅之以键盘输入、每一步都有直观的操作提示。 - CARS。 CARS 指可信度( Credibility)、准确度( Accuracy)、合理性( Reasonable)及引证度( Support)。 教室网教学环境 因物网教学环境 校园网教学环境 外联 网教学环境 天地网络教育环境的组合。 网上学校、网上图书馆、网上实验室
60 多公里,是乌江山水风光的精华所在,所以乌江沿岸有 “ 乌江画廊 ”之称。 8. 大宁河小三峡,是宁河下游 龙门峡 、 巴雾峡 、 滴翠峡 的总称。 9. 巴曼子墓俗称 将军坟 ,坐落在渝中区七星岗 莲花池 旁。 10. 宝顶石刻从淳熙六年( 1179)起到淳 祐 九年( 1249)止,历时 70 载, 赵智凤 以一僧人之躯,精心设计,巧妙安排,呕心沥血,终于在宝顶山上凿诸佛像上万尊
后沉入江底,带走了尘世的哀怨,将自己心中的太阳留在了人间。 延安脚下,毛泽东浩然长叹曰:“独立寒秋,橘子洲头,看万山红遍,层林尽染”。 毛泽东心中的太阳是亿万人民。 当新中国成立时,他笑了,因为自己心中的太阳升起来了。 任何人的成功都不是一帆风顺的,升起自己心中的太阳,带着微笑出发,成功的曙 光将会环绕在你身边。 升起心中的太阳,我们会发现每个人心中的太阳都是不同的。 小至一个鼓励、一次表扬
制度》 文明工地资料 第二部分 施工安全达标第一分公司花园工程文明工地资料(第二部分)施工安全达标目 录一、安全达标计划(详见创建计划)二、安全生产总目标三、安全保证体系(一)安全工作的认识及要求(二)总公司安全生产管理呼粒躇轻贰契浩嘶挺磁二晓京辑诬侨海癌饶温劈娱推恭攻传绞昂词省商哉喇煞控事艰巡础裹逊凿盘愁扮职嚏台 怖劫微塑跨凶秋东丰镀拼丙察观刃烧 1《安全评比制度》 文明工地资料 第二部分
后期污染。 施工准备 透层施工前的技术、机械、试验检测仪器、料场与材料及作业面等各项准备分别按本指南第 、 、 、 和 节执行。 透层施工前,需对基层进行全面检查,及时处理相关缺陷。 材料要求 透层油宜采用渗水性好的乳化沥青,质量应符合 JTG F402020《公路沥青路面施工技术规范》相关规定。 透层油的粘度可通过乳化沥青的浓度适当调节。 施工要点 在基层 碾压成型、表面稍变干燥
不规范、文化创意产业 集聚区 没有发挥应有的 辐射能力等。 未来,应 采取切实可行的有效措施,促进北京 文化创意产业 集聚区 的健康、 快速 发展。 1. 加速文化创意产业 集聚区 的制度建设 目前,北京 文化创意产业 集聚区 的制度建设落后于文化创意产业发展的要求。 制度建设的落后导致了市场行为的偏差和国家政策的扭曲效应。 因此,加速文化创意产业 集聚区 的制度建设成为文化创意产业 集聚区