can总线协议外文翻译内容摘要:
type of frame is a Data Frame. This is used when a node transmits information to any or all other nodes in the system. Second is a Remote Frame, which is basically a Data Frame with the RTR bit set to signify it is a Remote Transmit Request. The other two frame types are for handling errors. One is called an Error Frame and one is called an Overload Frame. Error Frames are generated by nodes that detect any one of the many protocol errors defined by CAN. Overload errors are generated by nodes that require more time to process messages already received. Data Frames consist of fields that provide additional information about the message as defined by the CAN specification. Embedded in the Data Frames are Arbitration Fields, Control Fields, Data Fields, CRC Fields, a 2bit Acknowledge Field and an End of Frame. The Arbitration Field is used to prioritize messages on the bus. Since the CAN protocol defines a logical 0 as the dominant state, the lower the number in the arbitration field, the higher priority the message has on the bus. The arbitration field consists of 12bits (11 identifier bits and one RTR bit) or 32bits (29 identifier bits, 1bit to define the message as an extended data frame, an SRR bit which isunused, and an RTR bit), depending on whether Standard Frames or Extended Frames are being utilized. The current version of the CAN specification, version ,defines 29bit identifiers and calls them Extended Frames. Previous versions of the CAN specification defined 11bitidentifiers which are called Standard Frames. As described in the preceding section, the Remote Transmit Request (RTR) is used by a node when it requires information to be sent to it from another node. To acplish an RTR, a Remote Frame is sent with the identifier of the required Data Frame. The RTR bit in the Arbitration Field is utilized to differentiate between a Remote Frame and a Data Frame. If the RTR bit is recessive, then the message is a Remote Frame. If the RTR bit is dominant, the message is a Data Frame. The Control Field consists of six bits. The MSB is the IDE bit (signifies Extended Frame) 华北科技学院毕业设计 外文文献及译稿 第 5 页 共 10 页 which should be dominant for Standard Data Frames. This bit determines if the message is a Standard or Extended Frame. In Extended Frames, this bit is RB1 and it is next bit is RB0 and it is also reserved. The four LSBs are the Data Length Code (DLC) bits. The Data Length Code bits determine how many data bytes are included in the message. It should be noted that a Remote Frame has no data field, regardless of the value of the DLC bits. The Data Field consists of the number of data bytes described in the Data Length Code of the Control Field. The CRC Field consists of a 15bit CRC field and a CRC delimiter, and is used by receiving nodes to determine if transmission errors have occurred. The Acknowledge Field is utilized to indicate if the message was received correctly. Any node that has correctly received the message, regardless of whether the node processes or discards the data, puts a dominant bit on the bus in the ACK Slot bit time The last two message types are Error Frames and Overload Frames. When a node detects one of the many types of errors defined by the CAN protocol, an Error Frame occurs. Overload Frames tell the work that the node sending the Overload Frame is not ready to receive additional messages at this time, or that intermission has been violated. These errors will be discussed in more detail in the next section. Fast,。can总线协议外文翻译
相关推荐
视图 辅助视图 等轴视图 用以产生工程图的前视图。 (1) 进入工程图,同时打开已经存在的三维物体窗口,并 将这两个窗口并排,单击 按钮,在单击三维物体的某一个面作为基准面,如图 所示。 图 (2) 先在工程图单元上单击 按钮,在切换到三维物体窗口选取物体,此时在零件窗口的右下角会出现一个辅助窗口,显示此时工程图中视图的情况,选定不同的基 准面将会出现不同的视图,如图 所示。 图 (3)
转折剖面图( Aligned Section Cut)创建详解 该功能用于生成转折剖面图。 步骤如下: 1) 在剖面及剖视图工具条中选取 Aligned Section Cut。 2) 选取剖切线经过的圆和点。 3) 双击最后选取的圆或点。 4) 移动鼠标带动绿色框内视图至所需位置,点击鼠标左键,即生成所需的视图。 局部放大视图功能( Details) 局部放大图包括圆形局部放大视图(
不平的山路。 素材品析:不同肤色、不同国别、不同语言、不同信仰的人在奥运这一平台上互相学习、互相交流、和谐相处,这比拿金牌更精彩。 让我们彻底放弃“金牌情结”,轻松享受竞技带来的欢悦和快乐,去领悟美丽的奥林匹克真正的魅力 ,尽情享受世界的美好时刻。 25。 有一份赤子之情让我们热血沸腾 北京奥运会女子花剑个人 1/32 决赛在击剑馆进行,加拿大选手栾菊杰 13 比 9 战胜突尼斯选手伊娜
建筑图,只需修改箭头为建筑标记,同时将箭头大小的值改小一些。 此处的值为斜线的水平投影长度,国标要求斜线长 2~3mm。 其他所有参数均按公共参数设置,如果为机械图,箭头及其大小也不必改。 . askcad. 4D2W39。 T%U(o+Sx x (askcad. )是国内最专业 ,发展最快的 Aut oCAD设计讨论基地 ,论坛云集高手 ,提供 CAD的教程 ,练习 ,考试 ,软件下载
与 WTP 的通信完成后,业务线程终止,同时所有相关的资源被释放。 状态机的迁移在图四中用字母顺序和标点字符描述。 CAPWAP 协议状态迁移 这个部分描述了不同状态的迁移和引起这些状态迁移的 事件。 这部分没有讨论在DTLS 和 CAPWAP 指定状态之间的消息交互。 这些交互在 中会被涉及到。 Start to Idle (0):此状态迁移主要是当设备的初始化完成之后进行。 WTP:开始一个
可进一步发出终止合同的通知,如果第二份通知发出后的 42 天内仍未得到委托 人答复,可终止合同或自行暂停或继续暂停执行全部监理业务或部分监理业务。 委托人承担违约责任。 第三十六条 监理人由于非自己的原因而暂停或终止执行监理业务,其善后工作以及恢复执行监理业务的工作,应当视为额外工作,有权得到额外的报酬。 第三十七条 当委托人认为监理人无正当原因而又未履行监理义务时