单片机英文翻译文献内容摘要:
lt by people like myself with varying backgrounds. We all had extensive experience in electronic engineering and were confident that that experience would stand us in good stead. This proved true, although we had some new things to learn. The most important of these was that transients must be treated correctly。 what would cause a harmless flash on the screen of a television set could lead to a serious error in a puter. As far as puting circuits were concerned, we found ourselves with an embarass de richess. For example, we could use vacuum tube diodes for gates as we did in the EDSAC or pentodes with control signals on both grids, a system widely used elsewhere. This sort of choice persisted and the term families of logic came into use. Those who have worked in the puter field will remember TTL, ECL and CMOS. Of these, CMOS has now bee dominant. In those early years, the IEE was still dominated by power engineering and we had to fight a number of major battles in order to get radio engineering along with the rapidly developing subject of in the IEE light current electrical recognised as an activity in its own right. I remember that we had some difficulty in anising a conference because the power engineers? ways of doing things were not our ways. A minor source of irritation was that all IEE published papers were expected to start with a lengthy statement of earlier practice, something difficult to do when there was no earlier practice Consolidation in the 1960s By the late 50s or early 1960s, the heroic pioneering stage was over and the puter field was starting up in real earnest. The number of puters in the world had increased and they were much more reliable than the very early ones . To those years we can ascribe the first steps in high level languages and the first operating systems. Experimental timesharing was beginning, and ultimately puter graphics was to e along. Above all, transistors began to replace vacuum tubes. This change presented a formidable challenge to the engineers of the day. They had to fet what they knew about circuits and start again. It can only be said that they measured up superbly well to the challenge and that the change could not have gone more smoothly. Soon it was found possible to put more than one transistor on the same bit of silicon, and this was the beginning of integrated circuits. As time went on, a sufficient level of integration was reached for one chip to acmodate enough transistors for a small number of gates or flip flops. This led to a range of chips known as the 7400 series. The gates and flip flops were independent of one another and each had its own pins. They could be connected by offchip wiring to make a puter or anything else. These chips made a new kind of puter possible. It was called a miniputer. It was something less that a mainframe, but still very powerful, and much more affordable. Instead of having one expensive mainframe for the whole anisation, a business or a university was able to have a miniputer for each major department. Before long miniputers began to spread and bee more powerful. The world was hungry for puting power and it had been very frustrating for industry not to be able to supply it on the scale required and at a reasonable cost. Miniputers transformed the situation. The fall in the cost of puting did not start with the miniputer。 it had always been that way. This was what I meant when I referred in my abstract to inflation in the puter industry ?going the other way?. As time goes on people get more for their money, not less. Research in Computer Hardware. The time that I am describing was a wonderful one for research in puter hardware. The user of the 7400 series could work at the gate and flipflop level and yet the overall level of integration was sufficient to give a degree of reliability far above that of discreet transistors. The researcher, in a university or elsewhere, could build any digital device that a fertile imagination could conjure up. In the Computer Laboratory we built the Cambridge CAP, a fullscale miniputer with fancy。单片机英文翻译文献
相关推荐
: 刘乃生 机筑工程大队 大队长 :黄凌峰 总工 :余志强 工程部张德强 财务部陈爱龙 综合部李兴双 试验室蔡以智 安质部李武伦 设物部黄伟 成本部杜宁 5 图 32 中铁二局新运工程大队哈大客运专线 TJ1 标 无砟道岔铺设 现场 施工组织机构图 、施工任务划分 由 一 工区负责 新鞍山车站无砟道岔的铺设任务。 、施工工期安排 、主要工程工期表 施工准备: 3 月 1 日至 4 月 24 日。
念为项目建设提供了必要的先决条件 本项目属于开发改造项目中城市棚户区改造部分。 项目在设计理念中,融入多种现代元素及地区深厚的文化底蕴。 在具体的设计中,通过具体的建筑手法,营造良好的居住氛围,有利于提升建设区域的商业价值;项目在设计中体现了建筑的生长概念,先 进的设计理念为项目建设提供了必要的先决条件。 本地区有实力雄厚,资质较高的专业施工队伍,能够保证工程建设进度和工程质量。 目前
,建筑面积 994 平方米,总工程造价为 1,391, 元。 该工程所需资金由以下 办法 筹措 :一 是出售现有场部及派出所办公用房及大院。 二是上级拨付派出所建房款 16 万元。 三是申请国家贫困林场基础设施建设专项资金。 该工程已于今年 10 月份开工,上冻之前已经完成基础及地下室部分工程,明年 4 月份继续施工, 5 月末 6 月初主体工程基本完工,然后进行内部装修,预计 7
石破碎,也能引起局部不稳定,在条件许可下避免与褶曲轴重合,以垂直穿越褶曲轴为宜。 隧道轴垂直穿过背斜时,隧道中间受到的岩层压力小, 两端岩层压力大,向斜则相反。 ( 4分) 工程建筑物的位置应尽力避开断层;特别是较大的断层。 应把工程建筑物位置选择在断层破碎带以外,通过断层带时,线路方向与断层走向要垂直。 ( 4 分) 2.简述常见土(砾石类土、砂类土、粘性土)的工程地质性质。 ( 12 分)