英语硕士论文开题报告样本翻译学方向开题报告论文内容摘要:
tute descriptive studies. Translation phenomena are accounted for with the help of norm. The case taken in this thesis is the Chinese classic The Dream of Red Mansions. Two English versions translated respectively by Yang Hsienyi and David Hawks are pared and observations are made in regard to their translation approaches. In this regard, my observations are limited to several aspects, I hope indepth observation and explanation will done in light of DTS. 2 Outline Development and major concepts of DTS In this part I will describe Holms’ basic map of DTS and the relationship between function, process and product. I will also discuss some important concepts such as pseudotranslation, multiple translation, translationese, norm etc. Methodolgy I will in this part discuss the methodology of DTS before I apply the same to the case study in this thesis with emphasis to be placed on semiotic approach and the concept norm. DTS in contrast to other theories A contrast st。英语硕士论文开题报告样本翻译学方向开题报告论文
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。
用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。