结构工程师必读书籍内容摘要:

的日本大学是一所具体的学校 —— Nihon University , 日 本 大 学 理 工 学 院 的 简 介 请 点 击( Nihon University 只是一所位于东京的二流院校,但能培养出这样的大师,实在是让人感叹日本的土木教育的水平之高。 中国想要出大师,不知道是什么时候了。 其他日本结构大师的书籍,很少看到有中文版,待以后慢慢寻找,阅读和推荐。 但是日本人翻译国外的经典书籍之多,我国望尘莫及。 我发现,对许多我总以为大家都很熟悉的有关结构和工程设计的优秀书籍(可能是因为我自己有这些书吧。 ),其实却为很少的结构工程师、教学科研人员或在校学生所知。 —— Bill Addis 说了美国和日本的。 下面介绍个英国的工程师。 William Addis(如果你想叫的亲热点,叫 Bill Addis 也行) 简介: William Addis is a consulting engineer at Buro Happold in London and the author of numerous books, academic papers, and book reviews on construction history published over the past 25 years. He holds a doctorate degree in the history and philosophy of engineering from the University of Reading, where he taught this subject for 15 years。 he has also delivered lecture courses on engineering history at Cambridge University, the University of Bath, and University College, London. In 1998, he helped curate the exhibition The Art of the Engineer at the Pompidou Centre in Paris and contributed to the book that acpanied the exhibition. Addis is an active member of the Institution of Structural Engineers39。 History Study Group and lectures at professional conferences around the world. 参考: 或者浏览: 书籍推荐: Creativity and innovation: the structural engineer39。 s contribution to design 中文版《创造力和创新:结构工程师对设计的贡献》 高立人翻译,高校图书馆多有收藏。 除了内容以外,值得称道的是,书后作者 Addis 列举了十几本优秀的结构工程书籍。 文章开头的那句话就是 Addis 在介绍这些书籍时说的话。 去看看吧,你会发现不一样的世界。 当然 Addis 还写了很多很好的书籍,比如: The Art of the Structural Engineer, Ellipsis, London (United Kingdom) , ISBN 1874056412, 1994. Building (1st edition), Phaidon, Berlin (Germany) , ISBN 0714841463, 2020. Structural and Civil Engineering Design, Ashgate Publishing, United Kingdom , ISBN 0860787613, 1999. Structural Engineering, Ellis Horwood, ISBN 0138506116, 1990. Want to Engineer Real Change? Don39。 t Ask a Scientist. By Henry Petroski Sunday, January 25, 2020 We will restore science to its rightful place, President Obama declared in his inaugural address. That certainly sounds like a worthy goal. But frankly, it has me worried. If we want to harness the sun and the winds and the soil to fuel our cars and run our factories, as Obama has decreed, we shouldn39。 t look to science. What we need is engineering. To be fair, Obama39。 s misconception is a mon one. Most people who aren39。 t scientists or engineers seem to。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。