外文翻译--单片机at89c内容摘要:
und. Port 0 Port 0 is an 8bit open drain bidirectional I/O port. As an output port, each pin can sink eight TTL inputs. When 1s are written to port 0 pins, the pins can be used as high impedance Inputs. Port 0 can also be configured to be the multiplexed loworder address/data bus during ccesses to external program and data memory. In this mode, P0 has int ernal pullups. 设计巴巴工作室 Port 0 also receives the code bytes during Flash programming and outputs the code bytes dur ing program pullups are required during program veri fication. Port 1 Port 1 is an 8bit bidirectional I/O port with internal Port 1 output buffers can sink/source four TTL 1s are written to Port 1 pins, they are pulled high bythe internal pullups and can be used as inputs. As inputs,Port 1 pins that are externally being pulled low will sourcecurrent (IIL) because of the internal pullups. In addition, and can be configured to be the ti mer/counter 2 exte rnal count input () and the timer/counter 2 trigger input(), respectively, as shown in the following table. Port 1 also receives the loworder address bytes during Flash programming and verification. Port Pin Alternate Functions T2 (external count input to Timer/Counter 2),clockout T2EX (Timer/Counter 2 capture/reload trigger and direction control) MOSI (used for InSystem Programming) MISO (used for InSystem Programming) SCK (used for InSystem Programming) Port 2 Port 2 is an 8bit bidirectional I/O port with internal Port 2 output buffers can sink/source four TTL 1s are written to Port 2 pins, they are pulled high bythe internal pullups and can be used as inputs. As inputs,Port 2 pins that are externally being pulled low will sourcecurrent (IIL) because of the internal pullups. Port 2 emits the highorder address byte during fetches from external program memory and during accesses toexternal data memory that use 16bit ddresses (MOVX @ DPTR). In this application, Port 2 uses strong internal pullups when emitting 1s. During accesses to external data memory that use 8bit addresses (MOVX @ RI), Port 2 emits 设计巴巴工作室 the contents of the P2 Special Function Register. Port 2 also receives the highorder address bits and some control signals during Flash programming and verification. Port 3 Port 3 is an 8bit bidirectional I/O port with internal Port 3 output buffers can sink/source four TTL 1s are written to Port 3 pins,they are pulled high by the internal pullups and can be used as inputs. As inputs, Port 3 pins that are externally being pulled low will source current (IIL) because of the pullups. Port 3 also serves the functions of various special featuresof the AT89S52, as shown in the following table. Port 3 also receives some control signals for Flash programming and verification.。外文翻译--单片机at89c
相关推荐
d costs are strongly linked. The longer is the time to produce parts the more are the costs. A reduction in the time spent on cooling the part before its is ejected would drastically increase the
陈振濂 .线条的世界 中国书法文化史 [M].浙江大学出版社 2020. [13] 董士海 .人机交互的进展及面临的挑战 [J].计算机辅助设计与图形学学报 2020 16(1). [14] 郭亚军 ,金先级 .人机交互 [M].武汉 :华中科技大学出版社 202003. [15] 刘慧芬 .数字媒体设计 [M].北京 :清华大学出版社 202006. [16] 海姆 (美 ).和谐界面 ——
压过流保护功能 3411 UC3844 的内部结构及管脚功能 图 32 UC3844 的引脚图 图 33 UC3844 的内部结构 该芯片虽然只有 8 个管脚但是却有两个闭环控制回路一个为内部误差放大器所构成的电压闭环控制回路它将输出电压反馈到第 2管脚同 25V基准电压比较形成误差电压另一个为内部电流感应比较器所构成的电流闭环控制回路变压器初级绕组中的电流在反馈电阻 Rs 上产生的压降通过第
M73 煤层:顶板为灰色泥质粉砂岩,底板为灰色泥岩。 据此,采煤过程中,仍需对矿井加强顶、底板管理,适时支护,特别在遇见有小构造的地带,更应严防冒顶、片帮、底鼓等不良工程地质问题发生。 六、水文地质 该区位于云贵高原乌蒙山区,属高原侵蚀地貌,地形切割强烈,地势北东高南西低,区内海拔标高 —,最高点位于矿区北西部,海拔标高 ;最低点位于矿区南西部,海拔标高 ,相对高差。 本区属 中亚热带季风气候区
战之一 第四节 生活工作中遇到的挑战之二 引 言 挑战的类型 有一位事业做得很成功的人在接受采访时说: “ 我并不是什么成功人士,我是一个正在路上的人,一个准备迎接挑战的人。 ” 如果你想成为真正的职业人,请记住这位成功人士的话:你是一个正在迎接各种挑战的人。 这就是职业人面对各种挑战应该具备的心态,但前提是要清楚自己面对的是什么样的挑战。 本讲介绍的是职业人士可能遇到的挑战类型。
序。 这个说明可以用卖方签字橡皮图章代替。 15)买方对工厂图纸的审查仅是大概的,对任何性质的错误和疏忽,图纸说明中的偏差或由此偏差而可能产生的与其它产品的矛盾,均应由卖方负责。 16)卖方应对由自己供应的设备所引起的管路、接头、导线的布置、安装方式等修改工作负全面责任,并应照顾受影响的卖方自己的产品和其它合同的产品。 17)工厂图纸,包括制造厂文献 、目录摘要或其它印刷材料