质量手册qualitymanualqm-01-20xxrevaupdate内容摘要:
eview and continuous improvement for quality management system. It is applies to overall process of pany product and service. It is mitment for society and interested party that we have ability to consistently provide product that meets customer and applicable statutory and regulatory requirements, and aims to enhance customer satisfaction 应用 Application 本手册适用于: a) 本公司的生产和服务; b) 本公司 QMS 覆 盖的所有区域、部门和人员; c)第二方、第三方对本公司 QMS 的审核; d)本公司与供方 /顾客的合同条件; This quality manual is suitable for a) Our pany products and service b) Scope, department and personnel QMS covers. c) Second party and third party audits d) Contract with our supplier and customer 应用 application 根据本公司产品的性质及其实现过程的特点,并考虑了顾客要求和适用的法律法规要求,本公司决定采用 ISO9001:2020 标准规定的全部条款,不作任何删减。 Our pany decides to adopt all clauses written in ISO9001:2020, no any exclusion, according to our product and process character and considering customer requirements and applicable statutory and regulatory requirements 文件名 Document Name: 质量手册 文件编号 File No: QM01 版本 Rev. A 总页数 Total pages: 33 页 2 引用标准 Normative references 下列文件中的条款通过本手册的引用而成为本手册的条款。 凡是注日期的引用文件,其随后所有的修改单(不包括勘误的内容)或修订版均不适用于本手册,然而,鼓励根据本手册达成协议的各方研究是否可使用这些文件的最新版本。 凡是不注日期的引用文件,其最新版本适用于本手册。 The following document references are indispensable for the application of this quality manual. For date references, only the edition cited applies. For undated references, the latest edition of the referenced document (including any amendments) applies. ISO 9000:2020 质量管理体系 基础 和术语 ISO 9001:2020 质量管理体系 要求 ISO9000:2020, Quality management systems — Fundamentals and vocabulary ISO9001:2020, Quality management systems — Requirement 3 术语和定义 Terms and definition 本手册采用 ISO9000:2020 《质量管理体系 基础和术语》标准中的定义。 本手册 中所出现的术语“产品”,也可指“服务” For the purposes of this document, the terms and definitions given in ISO9000, Throughout the text of this quality manual, wherever the term “product” occurs, it can also mean “service” 4 质量管理体系 Quality management system 总要求 General requirements 本公司 按照 ISO9001:2020《质量管理体系 — 要求》标准的要求建立、实施 、 保持了文件化的质量管理体系,并将持续改进其有效性。 Our pany establish, document, implement and maintain a quality management system and continually improve its effectiveness in accordance with ISO90012020 ?Quality management systemrequirements ?. 在建立质量管理体系的过程中: 公司质量管理体系过程 ; 、输出以及过程的排列顺序和相互作用; 确保 过程有效运行并能达到预期的目标, 编制了 所需的接收准则、作业指导书、操作 规程或规范等; ,包括经培训的人力资源、资金、生产设施、技术和必要 的信息; 、评价和改进过程的有效性,确定了监视、测量和分析过程的方法和要求。 文件名 Document Name: 质量手册 文件编号 File No: QM01 版本 Rev. A 总页数 Total pages: 33 页 、测量结果的分析,找出质量管理体系中的不足和差异,并制定采取措施的 程序, 以实现公司的目标和对过程的持续改进。 Processes of quality management system establishing, a) determine the processes of quality management system for pany, b) determine input and output process, the sequence and interaction of these processes, c) determine criteria,sop and operation standards to ensure that both the operation and control of these processes are effective. d) pany provides necessary resource and information, included trained human resource, capital, production facility, technology and necessary information. e) determine monitored, measured and analysised methods and requirements to analyze, evaluate and improve process effectiveness. f) Find out QMS insufficient and difference by analyzed monitoring and measurement result, and take action to achieve pany objectives and improve continually process 本公司 暂无外包过程。 There is no outsourced process on our pany. 文件要求 Documentation requimements 总则 General 本公司建立并维持一个符合 ISO9001 的质量管理体系。 quality management system should establish and maintain to meet ISO9001:2020 ? Quality management systemrequirement?. 本公司质量管理体系文件包括: ; ; 标准要求 形成文件的程序 和记录 ; 规范 ,如 指导书、操作规范 、图纸和质量计划等文件 ,包括记录 ; Quality management system documentation in our pany including a. Quality policy and quality objectives b. Quality manual c. Procedure and record required in ISO90012020. d. Operation standards 质量手册 Quality manual 本公司编 制并保持了质量手册。 ISO90012020 标准所有要求。 ; ; Quality ma。质量手册qualitymanualqm-01-20xxrevaupdate
相关推荐
推进学校体育课程改革,为足球特色校建设,为国家培养足球后备人才奠定基础。 四、发展目标 总目标: 通过以足球为载体的国家课程地方化实 施,构建有地方特色的中小校园足球课程。 从提高学生体质健康水平、运动技能水平和培养健全人格三方面,重构课程的内容、结构、方法、评价及管理体系。 具 体 目标: : 小学和初 中 学段,每周至少有一节足球课,每学期至少学习 18节足球课;高中阶段
变形模量或弹性模量来反映的。 参见教材 P9。 1 【 正确答案 】 ACDE 【 答案解析 】 本题考查的是岩体的力学特性。 一般来讲,组成岩石的矿物比重大,或岩石的孔隙性小,则岩石的重度就大。 在相同条件下的同一种岩石,重度大就说明岩石的结构致密、孔隙性小,岩石的强度和稳定性也较高。 参见教材 P9。 1 【 正确答案 】 BD 【 答案解析 】 本题考查的是土的物理力学性质。 土的饱和度
all me when you get this message. (Hangs up.) 好了,当你听到这口信的以后打电话给我。 [The next flashback is from The One With The Dozen Lasagnas, Phoebe is telling everyone but Rachel about the pass Paulo made on her.]
职能分配表(附图 2) C. 职责与权限(详见学校管理制度 — 教师分册) 1) 校长 a. 正确贯彻执行国家有关的教育法律法规,全面领导学校的工作。 b. 负责学校的质量方针、质量目标的制定。 c. 负责确定组织机构和各部门的质量职能的分配。 d. 负责任命管理者代表。 e. 负责管理评审工作。 f. 负责批准质量手册和程序文件。 g. 负责向各部门传达满足学生
( GB503302020) 四、监理: 《建设工程监理规范》 ( GB50319— 2020) 《建筑工程施工质量验收统一标准》 ( GB50300— 2020) 《建筑地基基础工程施工质量验收规范》 ( GB50202— 2020) 《建筑地面工程施工质量验收规范》 ( GB50209— 2020) 《建筑地基处理技术规范》 ( JGJ79— 91) 安徽省地勘局第一水文工程地质勘查院