introductionreading外研英语内容摘要:
d had a round head with 10cm horns. • Read the 3rd Paragraph: 1. What did Li Xiaohe see? 2. Why could they see the animal clearly? A round black creature moving quickly through the water. After 300 or 400 meters it dived into the water. The weather was fine and the lake was calm. Read the 4th Paragraph: 1. How long was the history of reports of monsters in Lake Tianchi? 2. What do many people think? 3. What do the scientists think? Since the beginning of the last century. The monster may be a distant cousin of the Loch Ness monster in Scotland and there might be similar creatures in other lakes around the world. The lowtemperature lake is unlikely to be able to support such large living creatures. • Read the 5th Paragraph: Information about Lake Tianchi: Height: Area: Depth: 2189 m 10 km2 370 m deep in some places Reading amp。 Vocabulary –4. Wordslearning (5m) Guess the meaning in the box and do activity 4 on page 53. • The keys: 1. A 2. A 3. B 4. B 5. C 6. A 7. A 8. C 9. C appear calm claim dive horn repeat skeptical seal sighting temperature Reading amp。 Vocabulary (8m) SIGHTING WITNESS DESCRIPTION Sighting One。introductionreading外研英语
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。
用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。