初二英语上学期studyskill牛津英语内容摘要:
doesn’t have friends there and she misses her classmates in the old school. Read the letter,underline the main points and circle the keywords in the letter. I am a Grade 8 student. I lived in Tianjin but I just moved to Beijing with my parents two months ago. Now I am studying at a new secondary school in Sunshine Town. It is bigger than my old school. I don not know the new school very well。阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。
用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。