初三英语下学期数词内容摘要:
the four?______ half quarter thirds 典型例题解析 【 例 2】 David „s very nice.[ 2020,四川] B A 【 例 3】 A_________schoolboy,Li Lida,first tried to cross the Qiongzhou Channel in June, 2020.[ 2020 【 例 4】 It is said that SARS has killed more than_________ people worldwide.[ 2020 hundreds hundreds39。 hundred39。 s hundred 【 例 5】 _________sun is shining brightly.[ 2020, D. A D C 1. This a big class, and ______ of the students are girls. A. two third B. second three C. two thirds D. two three 2. The questions is very easy, even a _____ child can answer it. A. threeyears old B. three years old C. threeyearold D. three year old 3. The _____ man on the left is Beckman, a famous football player. A. two B. second C. three 4. ——Which class won the match in the end? —— I’m not sure. Maybe _____ did. A. Class Third B. Class Three C. third three D. Class Three C C B D 5. Nine _____ pounds a week? That’s very good. A. hundred of B. hundreds of C. hundreds D. hundred. 6. Sharks have been on the earth for _____ years. A. thousands of B. two thousands C. two thousands of D. thousand of 7. ______ people e to Jilin to visit Mount Changbai every year. A. Thousands of B. Thousand of C. Thousands D. Thousand 8. The puter was cheap. I spent only two _____ yuan on it. A. thousands B. thousand C. thousands of D. thousand of D A A B 9. About _____ of the workers in the clothes factory are women. A. third fifths B. third fifth C. three fifths D. three fifth 10. The road is over ______ metres long. A. six hundreds and fiftytwo B. six hundred and fiftytwo C. six hundred, fiftytwo D. six hundred, fifty and two 11. September is _____ month of the year. A. ninth B. eighth C. the eighth D. the ninth 12. It’s about ______ kilometres from Nanning to Beijing. A. two thousand five hundred and sixty B. two thousand five hundreds and sixty C. two thousands five hundred and sixty D. two thousands five hundreds and sixty C B D A 13. Every year, ______ fishes are killed by the polluted water. A. million of B. millions of C. two millions of D. two millions 14. The boy told the old woman, “The train will arrive at two to two.” It means ______. A. 2:02 B. 2:20 C. 1:58 D. 1:40 15. Sara said we would meet at _____ in front of the museum. A. one thirty B. half an hour C. one and thirty D. one past thirty 16. We’ll have a _____ holiday after the exam. A. two month B. twomonth C. two month’s D. twomonths B C A B 17. Now childre。初三英语下学期数词
本资源仅提供20页预览,下载后可查看全文
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。
用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。
相关推荐
初三英语全册易错精选题
B. interested / interesting C. moving / moved D. moved / moving A D C grandma used to tell me ____harder and harder. B. studied study turn____the radio, I can’t hear clearly. A. on B. off C. up D.
初三英语下学期lessontwo
s football played? 2)How many players are there on each side ? 3)Who can use his hands ? 4)How long does the football game last? 5)Is a football game devided into two halves ? 6)What’s between the
初三物理下学期机械效率
脚手架上 ,所用的力是 60N,那么做的总功是 J,有用功是 J ,机械效率是。 用动力臂是阻力臂 2倍的杠杆将重 400N的货物抬高 20cm,手向下压杠杆的力是 220N,手下降的高度是 cm,人做的总功是 J,有用功是 J,这根杠杆的机械效率是。 1080 900 % 40 88 80 % 小结 有用功 额外功 总 功 机械效率 η = W有用 =Gh=100N 6m=600J W额外