动词时态、语态强化训练内容摘要:

C. looked through; had found D. had looked through; finding 29. — __ you __ the editor at the airport? — No, he __ away before my arrival. A. Have...met; has driven B. Had...met; was driven C. Did...meet; had been driven D. Have...met; had driven 30. — Can you give me the right answer? — Sorry, I __ .Would you repeat that question? A. hadn’t listened B. haven’t listened C. don’t listen D. wasn’t listening 31. I used to drink a lot of tea but these days I __ coffee. A. prefer B. preferred C. have preferred D. am preferring 32. — Was the driving pleasant when you went to Mexico last summer? — No, it __ for four days when we arrived, so the roads were very muddy. A. was raining B. had been raining C. would be raining D. rained 33. The vegetables didn’t taste very good. They__ too long. A. had been cooked B. were cooked C. had cooked D. cooked 34. — Remember the first time we met, Jim? — Of course I do. You __ in the library. A. were reading B. had read C. have read D. read 35. I want to buy that kind of cloth because I __ the cloth __ well. A. have told; washes B. have been told; washes C. was told; washed D. have been told; is washed 36. — What were you up to when your parents came in? — I__ for a while and__ some reading. A. was playing; was going to do B. played; did C. had played; was going to do D. had played; did 37. — Sorry, I fet to post the letter for you. — Never mind, __ it myself tonight. A. I’m going to post B. I’ve decided to post C. I’ll post D. I’d rather post 38. I should very much like to have gone to that party of theirs, but __ . A. I’m not invited B. I was not invited C. I have not been invited D. I had not been invited 39. — Is Tom still smoking? — No. By next Saturday he __ for a whole month without smoking a single cigarette. A. will go B. will have gone C. will have been D. has been going 40. All but one __ take part in the conference __ tomorrow. A. is going to; that is to take place B. are going to; that is about to take place C. are going to; that is to be taken place D. are going to; which is to be held 41. — Are you a visitor here? — That’s right. I__ round the world and now my dream of ing to China__ true. A. have traveled; has e B. was traveling; had been e C. am traveling; has e。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。