高一英语上学期复习课内容摘要:

mily __ are all music lovers will go to the concert. A. which B. that C. who D. in which 5. These are the tools __ we work. A. with these B. by these C. by which D. with which 6. Is this the school __ they used to study? A. where B. that C. on which D. the one 7. Is there any fruit shop nearby __ we can buy some fruit? A. at that B. at where C. which D. in which 8. The building __ all elder university teachers prefer looks so beautiful. A. at which B. where C. which D. in which 9. I see no reasons __ this cannot be done right now. A. but B. why C. how D. which 10. This was the sup。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。