初二英语下词组内容摘要:

• in time • Just then • first of all • be / get lost • ask / know + if + 句子 • make one’s way to • You can’t miss it. • What’s the matter ? • the key to Unit 17 • Must …..? No,…..needn’t. • Sb had an accident = An accident happened to sb • find / think it + adj. + for sb to ddo sth • be / get ready for sth / doing sth • practise doing sth • stop doing sth • stop to do sth • be interested in sth / doing sth • quarrel with sb • make a noise • get on • get off • at the head / end of • laugh at • throw about • have a good time = enjoy oneself • in fact • at midnight Unit 18 • have a headache • have a cough • • instead of • wake up • as soon as • fall asleep • What’s the trouble? • stop … from • be awake • again and again • look over • take exercise。
阅读剩余 0%
本站所有文章资讯、展示的图片素材等内容均为注册用户上传(部分报媒/平媒内容转载自网络合作媒体),仅供学习参考。 用户通过本站上传、发布的任何内容的知识产权归属用户或原始著作权人所有。如有侵犯您的版权,请联系我们反馈本站将在三个工作日内改正。